Original source · versioned page text
Appendix C - Code Assessment
and enhance visual amenity, dune stability,
habitat values and water quality.
ENVIRONMENT, NATURAL RESOURCES AND RECREATION
PO19 Development has no significant AO19 Connecting Habitat Areas as identified on Map SFM-4 - Complies.
adverse effects on biodiversity, natural Biodiversity (Strategic Framework) are protected from
vegetation, native fauna habitat, landscape fragmentation and encroachment by development. The proposed development has no significant adverse effects on biodiversity,
quality, water quality or cultural heritage natural vegetation, native fauna habitat, landscape quality, water quality or
values, including those related to— cultural heritage values.
(a) changes to natural drainage;
(b) disturbance to the dune system and
wetland system;
(c) management of landslide and fire risk;
(d) erosion and the transport of sediments
off site;
(e) unmanaged public access; and
(f) changes to fauna habitat and
behaviour.
PO20 Development maintains and protects AO20 Open space corridors identified as Ecological Linkages Complies.
an integrated open space network to— and Major Recreation areas on Map SFM-1 - Settlement and
(a) provide for both passive and active Map SFM-4 - Biodiversity (Strategic Framework) are enhanced The proposed development does not impact open space corridors.
recreational pursuits; and protected from fragmentation and encroachment by
(b) provide connectivity for pedestrians development.
and cyclists;
(c) provide habitat connectivity for wildlife
and fish passage;
(d) protect watercourses and drainage
lines;
(e) protect vegetation on steep slopes; and
(f) form a scenic backdrop for residential
development.
AIRCRAFT SAFETY
PO21 Development does not cause an AO21.1 Buildings and structures do not intrude into the Complies.
obstruction or hazard to the safe airport's obstacle limitation surface (OLS) identified on Map
movement of aircraft within the Sunshine AEM-1 - Airport Environment Map. The proposed development does not exceed 12m in built height.
Coast Airport’s operational airspace
through the temporary or permanent AO21.2 Landscaping does not include vegetation that at
intrusion of physical structures into the maturity will intrude into the airport's obstacle limitation
airport's operational airspace. surface (OLS) identified on Map AEM-1 - Airport Environment
Map.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.