Original source · versioned page text
2021-08-19 Ordinary Meeting Minutes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING MINUTES 19 AUGUST 2021
Water & Sewer Connections
10. An underground connection to reticulated water and sewerage must be provided
to the development site in accordance with the standards and requirements of
Northern SEQ Distributor–Retailer Authority (Unitywater).
Landscaping Works
11. The development site must be landscaped. The works must be undertaken in
accordance with the Noosa Plan for that specific area and must include in
particular:
a. the works shown on the Approved Plans including species and spacing as
detailed on the Landscape Plan.
12. All landscape works must be established and maintained in accordance with the
approved design for the life of the development, and in a manner that ensures
healthy, sustained and vigorous plant growth. All plant material must be allowed
to grow to full form and be refurbished when its life expectancy is reached.
13. All landscape works must be maintained generally in accordance with the
approved design for the life of the development.
B. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
C. Agree to enter into an Infrastructure Agreement with the applicant that provides for
contributions in lieu of one (1) on-site car parking space.
4 MCU21/0054 - DEVELOPMENT APPLICATION FOR A MATERIAL CHANGE OF USE –
SHORT TERM ACCOMMODATION AT 30 KINGFISHER DRIVE, PEREGIAN BEACH OCUM ENT
That Planning & Environment Committee Agenda Item 4 be referred to the General Committee
due to the significance of the issue.
5 MCU21/0079 - DEVELOPMENT APPLICATION FOR A MATERIAL CHANGE OF USE –
SHORT TERM ACCOMMODATION AT 4 TEAL STREET, PEREGIAN BEACH OCUM ENT
That Planning & Environment Committee Agenda Item 5 be referred to the General Committee
due to the significance of the issue.
6 UPDATE TO INFRASTRUCTURE CHARGES RESOLUTION
That Council note the report by the Infrastructure Assessment Coordinator to the Planning &
Environment Committee Meeting dated 10 August 2021 and adopt the “Noosa Shire Council
Charges Resolution (No.6) 2021” provided as Attachment 1 to the report, to replace the “Noosa
Shire Council Charges Resolution (No.5.1) 2020” and take effect on 20 August 2021.
7 CLIMATE CHANGE RESPONSE PLAN AND COMMUNITY CONSULTATION
SUBMISSIONS
That Planning & Environment Committee Agenda Item 7 be referred to the General Committee
due to the significance of the issue.
Page 6 of 28
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.