Original source · versioned page text
Appendix J - Water Supply and Wastewater Servicing Report
KEY
AREA SCHEDULE
1. Central courtyard with chapel and hall
2. Palliative Care
BUILDING 3. Day Respite
4. Respite Care
Dementia Care 688.8m² 5. Central Services
Telephone +61 7 3852 2525
T 6. Dementia House Facsimile +61 7 3852 2544
Respite Care 688.8m² EE www.bvn.com.au
TR 7. Chapel
MS
Day Respite 492.01m² EL 8. Community Hall
ROSE GUM RO
Palliative Care 1367.4m² AD 9. Nature Study Centre INTELLECTUAL PROPERTY
10. Substation COPYRIGHT BVN ARCHITECTURE PTY LIMITED. UNLESS OTHERWISE
AGREED IN WRITING;ALL RIGHTS TO THIS DOCUMENT ARE SUBJECT TO
PAYMENT IN FULL OF ALL BVN CHARGES;THIS DOCUMENT MAY ONLY
Central Services 328.99m² 11. Grounds Service Store BE USED FOR THE EXPRESS PURPOSE AND PROJECT FOR WHICH IT
HAS BEEN CREATED AND DELIVERED, AS NOTIFIED IN WRITING BY
BVN;AND THIS DOCUMENT MAY NOT BE OTHERWISE USED, OR COPIED.
12. Fire Tanks/Pump Room ANY UNAUTHORISED USE OF THIS DOCUMENT IS AT THE USER'S SOLE
Chapel 275.84m² RISK AND WITHOUT LIMITING BVN'S RIGHTS THE USER RELEASES AND
13. Caretaker's Residence / Existing Bldg INDEMNIFIES BVN FROM AND AGAINST ALL LOSS SO ARISING.
Community Hall 272.14m² 14. Aviary NOTE
CONTRACTOR TO CHECK AND VERIFY ALL DIMENSIONS ON SITE PRIOR
TO COMMENCEMENT OF WORK OR PREPARATION OF SHOP DRAWINGS.
15. Kitchen Gardens DO NOT SCALE THIS DRAWING
Existing Residence 193.84m²
16. Flower Garden ISSUE DATE FOR
10000
SETBACK
10 17. Animal Yard
Total GFA 4996.62m² 12 CARPARKS
18. Stable
19 CARPARKS
3 19. Chicken Pen
Carpark Bays 53 20. Fire Pit
5
19
2 18 17 5 PR
KEY OP
22 CARPARKS
ER
TY
BO
UN
DA
Existing Vegetation Footprint 16 RY
4
12 13
Vegetation Regeneration Zone
7
1
8
15
6
20 CONSULTANT
-
10000
-
SETBACK CONSULTANT
-
6 -
4 CONSULTANT
-
S 11 -
Notes: ES CONSULTANT
ACC 15
9 E -
1. All internal FIR -
D/ PROJECT MANAGER
ROA 10000
-
plumbing to E SETBACK -
VIC CLIENT
AS3500 and S ER
Council plumbing
approval. LUTHERAN SERVICES
CLIENT NUMBER
1701009
PROJECT
BIOSPHERIC CARE FARM COMMUNITY
BLACK MOUNTAIN, COOROY
BVN PROJECT NUMBER
1701009
DRAWING KEY
LEGEND TRUE NORTH PROJECT NORTH
BR
Dam Water Pump UC
EH GRAPHIC SCALE
IG
HW 0 2000 5000
Damwater Rising Main AY FIGURE B2 SCALE
1 : 1000@A1
Central Storage Tank and Distribution Pumps STATUS
COOROY CARE FARM PD
Treated Water Distribution (not shown) DRAWING
PRELIMINARY NON-POTABLE
SITE PLAN Bligh Tanner Pty Ltd SITE PLAN - STAGE 1
ISSUE
COOROY CARE FARM /
May 2018 WATER SUPPLY LAYOUT
AR-A-XX-01
C:\REVIT_LOCAL2017\1701009_Care Farm_Site File_Masterplan_2017_bhdoherty.rvt 30/04/2018 12:52:48 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.