MINOR CHANGE - Attachment 1 - Proposal Plans Minor Change.pdf
IMPORTANT NOTES: REVISION DATE DESCRIPTION BY CLIENT DRAWING TITLE
NOOSA SPRINGS REAL ESTATE PTY
1 04/09/20 FOR INFORMATION ST
COVER SHEET
Do not scale from drawings. All dimensions to be checked
on site before commencement of work. All discrepancies to 2 22/09/20 FOR INFORMATION ST
LTD
be brought to the attention of the Architect. Larger scale 3 25/09/20 DA APPROVAL ST
drawings and written dimensions take preference. This 4 09/10/20 DA APPROVAL REVISED ST
drawing is copyright and the property of the author, and must 5 14/10/20 DA APPROVAL REVISED ST
Marchese Partners International Pty Ltd
not be retained, copied or used without the express authority 6 04/11/20 COUNCIL PRESENTATION ST
of MARCHESE PARTNERS INTERNATIONAL PTY. LTD. 7 01/12/20 DA APPROVAL REVISED ST Level 14, 46 Edward Street. Brisbane, QLD 4000. Australia
8 21/04/22 UPDATED DA DRAWINGS BY P +61 7 3211 2600 F +61 7 3211 0297 E [email protected] PROJECT SCALE DATE DRAWN CHECKED
9 04/05/22 UPDATED RENDERS BY
www.marchesepartners.com
NOOSA SPRINGS BOUTIQUE HOTEL
FOR APPROVAL
10 10/05/22 UPDATED DA DRAWINGS BY 06/02/25 BY ST
11 09/02/23 UPDATED DA DRAWINGS LC Sydney · Brisbane· Melbourne · Adelaide
12 07/11/24 MINOR CHANGE LC Kuala Lumpur · Auckland · Christchurch · London · Madrid JOB DRAWING REVISION
13 06/02/25 MINOR CHANGES UPDATE MM
NOT FOR CONSTRUCTION
ABN 33 590 578 323
20079 DA0.01 13
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (MINOR CHANGE - Attachment 1 - Proposal Plans Minor Change.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of pages 2 to 10 (of 28)
Page 2
CONTENTS
DRAWING NUMBER DRAWING TITLE REVISION NOOSA SPRINGS BOUTIQUE HOTEL
DA0.01 COVER SHEET 13 PLANNING DATA
DA0.02 CONTENTS 18
DA0.03 GFA CALCULATIONS 11
SITE COVER & LANDSCAPE OPEN SPACE EXISTING CARPARKS
DA0.03a EXISTING CLUB HOUSE & SPA GFA CALCULATIONS
STANDARD PWD
DA0.04 EXISTING CONTOURS 9 SITE AREA (PRECINCT G) 38,024m² UPPER CARPARK 93
DA0.05 MOVEMENT ANALYSIS 8 MID CARPARK 69
SITE COVER
DA0.06 SITE IMAGE 9 PROPOSED NEW HOTEL 7.16% (2721m²) DECREASE OF 2.49% (-949m²)
LOWER CARPARK 49 3
DA0.07 COUNCIL ZONING MAP OVERLAY 6 CLUB LOADING DOCK 6
EXISTING CLUB HOUSE 4.83% (1839m²)
DA0.08 SITE PLAN - BUSHFIRE AERIAL IMAGE UNDERLAY 8 TOTAL 217 3
EXISTING DAY SPA &
DA0.09 BIODIVERSITY OVERLAY COMPARISON 5 GYMNASIUM 3.44% (1308m²)
DA0.50 VISUAL ASSESSMENT PHOTOMONTAGE 3
TENNIS COURTS 6.72% (2558m²) INCREASE OF 0.13% (+53m²)
PROPOSED NEW CARKING
TOTAL SITE COVER 22.15% (8426m²) DECREASE OF 2.37% (-896m²)
DA0.51 VISUAL ASSESSMENT PHOTOMONTAGE 3 STANDARD PWD
DA1.00 SITE PLAN 19 ACCOMMODATION ROOM SCHEDULE
UPPER CARPARK 83* 1*
MID CARPARK 66
DA1.01 ENTRY LINK LEVEL PLAN 15 ROOM DELUXE SUITE PREMIUM PRESIDENTIAL LOWER CARPARK 97* 4*
SUITE SUITE
DA1.02 BASEMENT PLAN 18 LOWER GROUND 9
CLUB LOADING DOCK 6
DA1.03 LOWER GROUND FLOOR PLAN 16 GROUND LEVEL 15
OVERFLOW NORTH 19
DA1.04 GROUND LEVEL PLAN 16 LEVEL 1 12 2 1
OVERFLOW EAST 15 4
TOTAL 286 9
DA1.05 LEVEL 1 PLAN 16 LEVEL 2 13 6
*INCLUDES 188 UNDERCOVER CAR PARKS
DA1.06 LEVEL 2 PLAN 16
LEVEL 3 11
DA1.07 LEVEL 3 PLAN 16 TOTAL: 69 60 2 6 1 OTHER PROPOSED FACILITIES
(PRIOR TOTAL 106 - DECREASE OF 37)
DA1.08 ROOF PLAN 16 POOL
DA1.10 EXISTING CLUBHOUSE PLAN 9 PROPOSED GROSS FLOOR AREA
CAFE & BAR
DA1.11 PROPOSED CLUBHOUSE PLAN 9 LEVEL GFA (m²)
HOTEL LOBBY
4 x TENNIS COURTS
DA1.12 CARPARK PLANS 5 CLUB HOUSE EX. 105m²
HOTEL GUEST WAITING AREA
ENTRY LINK LEVEL 23m²
DA2.01 SOUTH & WEST ELEVATION 16 BASEMENT
LOWER GROUND
94m²
463m² INCREASED PORTE-COCHERE ROOF
DA2.02 NORTH & EAST ELEVATION 16 GROUND LEVEL
LEVEL 1
2077m²
970m²
DECREASE OF 26m²
DECREASE OF 251m² ELECTRIC BICYCLE HIRE
LEVEL 2 1174m² DECREASE OF 648m²
DA2.03 CARPARK ELEVATIONS & SECTION 6 LEVEL 3 486m² DECREASE OF 650m² 7 x MOTORCYCLE PARKS
DA2.04 TENNIS COURTS 10 TOTAL 5392m² DECREASE OF 1575m²
DA3.01 BUILDING SECTIONS 16
DA3.02 PART SECTIONS 1 14 NOTE: THIS MINOR CHANGE UPDATE IS REFERENCED
DA3.03 PART SECTIONS 2 15 AND COMPARED AGAINST THE UPDATED DA
DRAWINGS REVISION 13, DATED 09/02/23
DA4.05 3D VIEW - BUILDING ENTRY 12
DA4.06 3D VIEW - POOL VIEW 1 11
DA4.07 3D VIEW - POOL VIEW 2 11
DA4.08 3D VIEW - LOOKING NORTH FROM RESORT DRIVE 11
DA5.02 ACCOMMODATION TYPES 7
IMPORTANT NOTES: REVISION DATE DESCRIPTION BY CLIENT DRAWING TITLE
NOOSA SPRINGS REAL ESTATE PTY
5 14/10/20 DA APPROVAL REVISED ST
CONTENTS
Do not scale from drawings. All dimensions to be checked
on site before commencement of work. All discrepancies to 6 01/12/20 DA APPROVAL REVISED ST
LTD
be brought to the attention of the Architect. Larger scale 7 27/08/21 RFI ST
drawings and written dimensions take preference. This 8 12/11/21 RFI ST
drawing is copyright and the property of the author, and must 9 04/03/22 DA REVISED DESIGN ST
Marchese Partners International Pty Ltd
not be retained, copied or used without the express authority 10 21/04/22 UPDATED DA DRAWINGS BY
of MARCHESE PARTNERS INTERNATIONAL PTY. LTD. 11 04/05/22 UPDATED RENDERS BY Level 14, 46 Edward Street. Brisbane, QLD 4000. Australia
12 10/05/22 UPDATED DA DRAWINGS BY P +61 7 3211 2600 F +61 7 3211 0297 E [email protected] PROJECT SCALE DATE DRAWN CHECKED
13 09/02/23 UPDATED DA DRAWINGS LC
www.marchesepartners.com
NOOSA SPRINGS BOUTIQUE HOTEL
FOR APPROVAL
14 20/09/24 FOR COORDINATION LC 06/02/25 BY ST
15 17/10/24 FOR COORDINATION LC Sydney · Brisbane· Melbourne · Adelaide
16 07/11/24 MINOR CHANGE LC Kuala Lumpur · Auckland · Christchurch · London · Madrid JOB DRAWING REVISION
17 12/11/24 MINOR CHANGE LC
NOT FOR CONSTRUCTION
18 06/02/25 MINOR CHANGES UPDATE MM
ABN 33 590 578 323
20079 DA0.02 18
Page 3
GFA - GROUND LEVEL
2077 m²
GFA BASEMENT
74 m²
GFA LOWER GROUND
463 m²
BASEMENT LOWER GROUND GROUND LEVEL
2 3 4
ENTRY LINK LEVEL 1 : 400 1 : 400 1 : 400
1
1 : 400
GFA - TENNIS PAVILION GFA - TENNIS PAVILION
LOWER UPPER
23 m² 19 m²
GFA - LEVEL 1 GFA - LEVEL 3
64 m² 486 m²
8
TENNIS COURTS LOWER LEVEL
9
TENNIS COURTS UPPER LEVEL GFA - LEVEL 2
1 : 400 1 : 400 1174 m²
Area Schedule (GFA)
Level Area
ENTRY LINK LEVEL 23 m²
BASEMENT 94 m²
LOWER GROUND 463 m² GFA - LEVEL 1
GROUND LEVEL 2077 m² 906 m²
LEVEL 1 970 m²
Level 2 1174 m²
Level 3 486 m²
Grand total 5288 m²
LEVEL 1 Level 2 Level 3
5 6 7
1 : 400 1 : 400 1 : 400
IMPORTANT NOTES: REVISION DATE DESCRIPTION BY CLIENT DRAWING TITLE
NOOSA SPRINGS REAL ESTATE PTY
1 22/09/20 FOR INFORMATION ST
GFA CALCULATIONS
Do not scale from drawings. All dimensions to be checked
on site before commencement of work. All discrepancies to 2 25/09/20 DA APPROVAL ST
LTD
be brought to the attention of the Architect. Larger scale 3 09/10/20 DA APPROVAL REVISED ST
drawings and written dimensions take preference. This 4 14/10/20 DA APPROVAL REVISED ST
drawing is copyright and the property of the author, and must 5 01/12/20 DA APPROVAL REVISED ST
Marchese Partners International Pty Ltd
not be retained, copied or used without the express authority 6 04/03/22 DA REVISED DESIGN ST
of MARCHESE PARTNERS INTERNATIONAL PTY. LTD. 7 09/02/23 UPDATED DA DRAWINGS LC Level 14, 46 Edward Street. Brisbane, QLD 4000. Australia
8 20/09/24 FOR COORDINATION LC P +61 7 3211 2600 F +61 7 3211 0297 E [email protected] PROJECT SCALE DATE DRAWN CHECKED
9 17/10/24 FOR COORDINATION LC
www.marchesepartners.com
NOOSA SPRINGS BOUTIQUE HOTEL
FOR APPROVAL
10 07/11/24 MINOR CHANGE LC 06/02/25 BY ST
11 06/02/25 MINOR CHANGES UPDATE MM Sydney · Brisbane· Melbourne · Adelaide
Kuala Lumpur · Auckland · Christchurch · London · Madrid JOB DRAWING REVISION
NOT FOR CONSTRUCTION
ABN 33 590 578 323
20079 DA0.03 11
Page 4
LEGEND
OPEN SPACE RECREATION ZONE
TOURIST ACCOMMODATION ZONE
2.5 OU CONTOUR
IMPORTANT NOTES: REVISION DATE DESCRIPTION BY CLIENT DRAWING TITLE
NOOSA SPRINGS REAL ESTATE PTY
1 14/10/20 DA APPROVAL REVISED ST
COUNCIL ZONING MAP OVERLAY
Do not scale from drawings. All dimensions to be checked
on site before commencement of work. All discrepancies to 2 01/12/20 DA APPROVAL REVISED ST
LTD
be brought to the attention of the Architect. Larger scale 3 09/02/23 UPDATED DA DRAWINGS LC
drawings and written dimensions take preference. This 4 20/09/24 FOR COORDINATION LC
drawing is copyright and the property of the author, and must 5 07/11/24 MINOR CHANGE LC
Marchese Partners International Pty Ltd
not be retained, copied or used without the express authority 6 06/02/25 MINOR CHANGES UPDATE MM
of MARCHESE PARTNERS INTERNATIONAL PTY. LTD. Level 14, 46 Edward Street. Brisbane, QLD 4000. Australia
P +61 7 3211 2600 F +61 7 3211 0297 E [email protected] PROJECT SCALE DATE DRAWN CHECKED
www.marchesepartners.com
NOOSA SPRINGS BOUTIQUE HOTEL
1 : 500 @A1
FOR APPROVAL
06/02/25 BY ST
Sydney · Brisbane· Melbourne · Adelaide
Kuala Lumpur · Auckland · Christchurch · London · Madrid JOB DRAWING REVISION
0 5 10 20
NOT FOR CONSTRUCTION
ABN 33 590 578 323
20079 DA0.07 6
Page 5
LEGEND
MINOR CHANGE REGISTER
PAVILION 5 DELETED. LIFT AND STAIR 1 NEW HOTEL
1 RECONFIGURED 2 POOL
TERRACE SIZES REDUCED ON 3 NEW HOTEL ENTRY ROOF
2 GROUND LEVEL. 4 TENNIS COURT WITH EXISTING ON-GRADE CAR PARK
BELOW
3 NOT USED. 5 TENNIS PAVILION
6 AMENITIES
PRESIDENTIAL SUITE CHANGED TO 2 x
4 DELUXE ROOMS. 7 LINKS DRIVE
8 RESORT DRIVE
9 EXISTING COUNTRY CLUB
5 CAR PARK SHADING HEIGHT REDUCED. 10 EXISTING DAY SPA & GYMNASIUM
11 EXISTING POOL
6 TENNIS COURT SIZE INCREASED. 12 SOLAR PANELS
13 NEW 2 LEVEL CARPARK WITH EXISTING LOWER CAR
7 AMENITIES BUILDING SIZE INCREASED. PARK BELOW
14 EXISTING MID CAR PARK
8 LANDSCAPE DESIGN UPDATED BY PDG. 15 EXISTING UPPER CAR PARK
16 EXISTING PORTE-COCHERE
17 EXISTING PORTE-COCHERE ROOF
18 PEDESTRIAN ACCESS TO PORTE COCHERE
HATCH ZONE INDICATES MSES
FROM MID CAR PARK
1 ENVIRONMENTAL VALUES
19 NEW PORTE COCHERE ROOF
DA3.01 GREEN DASH INDICATES 20 EXISTING PORTE COCHERE ROOF EXTENSION
DA4.03 AREA OF BIODIVERSITY 21 SERVICE ACCESS TO POOL PLANT + WATER TANKS
SIGNIFICANCE 22 PLATEAU / SCISSOR LIFT
23 SERVICE ROAD WAY EXTENSION
1 24 EXISTING SERVICE LANEWAY
2 25 EXISTING LOADING BAY
33 DA3.03 26 EXISTING SITE ACCESS
SITE BOUNDARY
27 EXISTING MANHOLE AT PORTE-COCHERE LEVEL
1 8 28 EXISTING BUGGY PARKING
29 EXISTING BUS PARKING
30 EXISTING BRIDGE CONNECTION
31 POOL PLANT BELOW
34 32 TENNIS COURT SHADE STRUCTURE
19 x OVERFLOW CARPARKS
WITH SEATING BELOW
33 CONTROLLED GATE TO OVERFLOW CARPARKING
2.5 OU CONTOUR
34 REINFORCED TURF OVERFLOW CARPARKING / MULTI-
PURPOSE SPACE.
35 PEDESTRIAL ACCESS TO CLUBHOUSE
36 SPA
37 68,000 LITRE WATER TANK BELOW
38 SOLAR PANEL CARPORT ROOFS
37
12 2.5 OU CONTOUR
SITE BOUNDARY
EXISTING EASEMENT
7 1 EXISTING SEWER LINE
2 PAVILION 4 23 MSES ENVIRONMENTAL VALUES
2 AREA OF BIODIVERSITY SIGNIFICANCE
1 1 DA3.03
6 1 1
2
DA3.02 DA3.02
SERVICE ROAD TO BE A
8 22 MINIMUM 3.5m WIDE
DA4.03 2 1 34
19 x OVERFLOW CARPARKS
PAVILION 3 (INCLUDES 4xPWD) 33
2
00
36 2
35
DA3.02
2
3 2 37
DA2.04
1
DA2.04
156 PAVILION 2
35 31
21 11
SERVICE ROAD TO BE A
32 6 MINIMUM 3.5m WIDE
DA2.03 6
DA4.02 1 10
4 4 1 28
PAVILION 1 24
15
5
3
20
30
6 35
3 4
19 27
4 4 2
14
32 DA4.02 DA4.02 DA3.02
18
26
3 2
25
DA2.04 DA2.04
17
26
SITE BOUNDARY
7 DA2.03 16 9
5
1
1
29 DA3.01
3 DA2.03
DA2.03 4 38
13
38
2
PORTE COCHERE TO BE RENOVATED TO
ENSURE 4.3M HEIGHT CLEARANCE FOR
DA2.03 VEHICLE ACCESS
IMPORTANT NOTES: REVISION DATE DESCRIPTION BY CLIENT DRAWING TITLE
NOOSA SPRINGS REAL ESTATE PTY
6 04/11/20 COUNCIL PRESENTATION ST
SITE PLAN
Do not scale from drawings. All dimensions to be checked
on site before commencement of work. All discrepancies to 7 01/12/20 DA APPROVAL REVISED ST
LTD
be brought to the attention of the Architect. Larger scale 8 19/10/21 CARPARK DESIGN ST
drawings and written dimensions take preference. This 9 12/11/21 RFI ST
drawing is copyright and the property of the author, and must 10 04/03/22 DA REVISED DESIGN ST
Marchese Partners International Pty Ltd
not be retained, copied or used without the express authority 11 13/04/22 REVISED DESIGN BY
of MARCHESE PARTNERS INTERNATIONAL PTY. LTD. 12 21/04/22 UPDATED DA DRAWINGS BY Level 14, 46 Edward Street. Brisbane, QLD 4000. Australia
13 09/02/23 UPDATED DA DRAWINGS LC P +61 7 3211 2600 F +61 7 3211 0297 E [email protected] PROJECT SCALE DATE DRAWN CHECKED
14 13/09/24 FOR COORDINATION LC
www.marchesepartners.com
NOOSA SPRINGS BOUTIQUE HOTEL
As indicated @A1
FOR APPROVAL
15 20/09/24 FOR COORDINATION LC 06/02/25 AB BY
16 17/10/24 FOR COORDINATION LC Sydney · Brisbane· Melbourne · Adelaide
17 04/11/24 SITE PLAN LC Kuala Lumpur · Auckland · Christchurch · London · Madrid JOB DRAWING REVISION
18 07/11/24 MINOR CHANGE LC 0 5 10 20
NOT FOR CONSTRUCTION
19 06/02/25 MINOR CHANGES UPDATE MM
ABN 33 590 578 323
20079 DA1.00 19
Page 6
LEGEND
8 ID DESCRIPTION
8
1 DELUXE
1 PRESIDENTIAL SUITE
1 ROOM
2 ROOM SMALL
13750
3 PREMIUM SUITE
5 BALCONY
9 7
6 POOLSIDE COURTYARD
7 CIRCULATION
8 LIFT
9 STAIR
10 COMMUNAL
11 PORT COCHERE
12 ROAD EXTENSION
13 SHORT TERM PARKING
14 REFURBISHED PORT COCHERE
15 NEW HOTEL ENTRY
BUILDING OVER 16
16 LIGHT WEIGHT ENTRY ROOF OVER
17 HOUSE KEEPING ROOM
18 SERVICES ROOM / CUPBOARD
19 PLANT & EQUIPMENT
15
20 POOL
23 BOH ADMIN
24 PWD
25 FEMALE BATHROOMS
26 MALE BATHROOMS
27 MALE STAFF AMENITIES
11 28 FEMALE STAFF AMENITIES
29 FURNITURE STORE
30 GENERAL STORE
13 31 LINEN STORE
10
12 32 KITCHEN
33 SCISSOR LIFT
34 DRY STORE
35 LIQUOR STORE
36 HOUSEKEEPER OFFICE
14 37 KEG ROOM
38 LIQUOR COOLROOM
39 SERVICE CORRIDOR
40 PREP & SERVICE KITCHEN
60
41 FUNCTION COLD ROOM
42 TROLLEY STORE
43 AV
44 FREEZER ROOM
45 COLD ROOM
PORTE COCHERE TO BE RENOVATED TO
ENSURE VEHICLE MOVEMENT AND 4.3M HEIGHT 46 KITCHEN & POT WASH
CLEARANCE FOR VEHICLE ACCESS
47 WET WASTE
48 DRY WASTE
49 LOADING DOCK
50 DIRTY LINEN
51 COMMS
52 MSB
53 SERVICE VEHICLE ACCESS ROAD
55 ELECTRIC VEHICLE CHARGING STATION
56 MOTORCYCLE PARK
59 VIEWING DECK
60 DDA COMPLIANT RAMP
61 WATER TANK
62 TENNIS COURTS
CARPARK OVER
IMPORTANT NOTES: REVISION DATE DESCRIPTION BY CLIENT DRAWING TITLE
NOOSA SPRINGS REAL ESTATE PTY
2 22/09/20 FOR INFORMATION ST
ENTRY LINK LEVEL PLAN
Do not scale from drawings. All dimensions to be checked
on site before commencement of work. All discrepancies to 3 25/09/20 DA APPROVAL ST
LTD
be brought to the attention of the Architect. Larger scale 4 09/10/20 DA APPROVAL REVISED ST
drawings and written dimensions take preference. This 5 14/10/20 DA APPROVAL REVISED ST
drawing is copyright and the property of the author, and must 6 04/11/20 COUNCIL PRESENTATION ST
Marchese Partners International Pty Ltd
not be retained, copied or used without the express authority 7 01/12/20 DA APPROVAL REVISED ST
of MARCHESE PARTNERS INTERNATIONAL PTY. LTD. 8 12/11/21 RFI ST Level 14, 46 Edward Street. Brisbane, QLD 4000. Australia
9 04/03/22 DA REVISED DESIGN ST P +61 7 3211 2600 F +61 7 3211 0297 E [email protected] PROJECT SCALE DATE DRAWN CHECKED
10 13/04/22 REVISED DESIGN BY
www.marchesepartners.com
NOOSA SPRINGS BOUTIQUE HOTEL
1:250 @A1
FOR APPROVAL
11 21/04/22 UPDATED DA DRAWINGS BY 06/02/25 AB BY
12 10/05/22 UPDATED DA DRAWINGS BY Sydney · Brisbane· Melbourne · Adelaide
13 09/02/23 UPDATED DA DRAWINGS LC Kuala Lumpur · Auckland · Christchurch · London · Madrid JOB DRAWING REVISION
14 07/11/24 MINOR CHANGE LC 0 5 10
NOT FOR CONSTRUCTION
15 06/02/25 MINOR CHANGES UPDATE MM
ABN 33 590 578 323
20079 DA1.01 15
Page 7
MINOR CHANGE REGISTER LEGEND
SITE BOUNDARY PAVILION 5 DELETED. LIFT AND STAIR ID DESCRIPTION
1 RECONFIGURED
TERRACE SIZES REDUCED ON
2 GROUND LEVEL.
1 DELUXE
3 NOT USED. 1 PRESIDENTIAL SUITE
PRESIDENTIAL SUITE CHANGED TO 2 x 1 ROOM
4 DELUXE ROOMS.
2 ROOM SMALL
5 CAR PARK SHADING HEIGHT REDUCED. 3 PREMIUM SUITE
5 BALCONY
6 TENNIS COURT SIZE INCREASED.
6 POOLSIDE COURTYARD
7 AMENITIES BUILDING SIZE INCREASED. 7 CIRCULATION
8 LANDSCAPE DESIGN UPDATED BY PDG. 8 LIFT
9 STAIR
10 COMMUNAL
11 PORT COCHERE
12 ROAD EXTENSION
13 SHORT TERM PARKING
14 REFURBISHED PORT COCHERE
15 NEW HOTEL ENTRY
16 LIGHT WEIGHT ENTRY ROOF OVER
17 HOUSE KEEPING ROOM
18 SERVICES ROOM / CUPBOARD
19 PLANT & EQUIPMENT
20 POOL
23 BOH ADMIN
24 PWD
25 FEMALE BATHROOMS
26 MALE BATHROOMS
27 MALE STAFF AMENITIES
28 FEMALE STAFF AMENITIES
29 FURNITURE STORE
30 GENERAL STORE
31 LINEN STORE
32 KITCHEN
33 SCISSOR LIFT
34 DRY STORE
35 LIQUOR STORE
36 HOUSEKEEPER OFFICE
37 KEG ROOM
38 LIQUOR COOLROOM
39 SERVICE CORRIDOR
40 PREP & SERVICE KITCHEN
41 FUNCTION COLD ROOM
42 TROLLEY STORE
43 AV
44 FREEZER ROOM
45 COLD ROOM
46 KITCHEN & POT WASH
47 WET WASTE
48 DRY WASTE
49 LOADING DOCK
50 DIRTY LINEN
51 COMMS
52 MSB
53 SERVICE VEHICLE ACCESS ROAD
8 55 ELECTRIC VEHICLE CHARGING STATION
8 56 MOTORCYCLE PARK
19500
17 59 VIEWING DECK
7
56 56 56 60 DDA COMPLIANT RAMP
56
5400
55 55 55 55 18
61 WATER TANK
9 62 TENNIS COURTS
9
6200
CAR PARK (21 TURNAROUND
TENNIS COURTS OVER COVERED PARKS) BAY
5300
TENNIS COURTS OVER TENNIS COURT ENTRY
56 56 56
2700 2800 2700 2800 400
5400
4800
2700
BUILDING OVER
IMPORTANT NOTES: REVISION DATE DESCRIPTION BY CLIENT DRAWING TITLE
NOOSA SPRINGS REAL ESTATE PTY
5 14/10/20 DA APPROVAL REVISED ST
BASEMENT PLAN
Do not scale from drawings. All dimensions to be checked
on site before commencement of work. All discrepancies to 6 04/11/20 COUNCIL PRESENTATION ST
LTD
be brought to the attention of the Architect. Larger scale 7 01/12/20 DA APPROVAL REVISED ST
drawings and written dimensions take preference. This 8 12/11/21 RFI ST
drawing is copyright and the property of the author, and must 9 04/03/22 DA REVISED DESIGN ST
Marchese Partners International Pty Ltd
not be retained, copied or used without the express authority 10 13/04/22 REVISED DESIGN BY
of MARCHESE PARTNERS INTERNATIONAL PTY. LTD. 11 21/04/22 UPDATED DA DRAWINGS BY Level 14, 46 Edward Street. Brisbane, QLD 4000. Australia
12 10/05/22 UPDATED DA DRAWINGS BY P +61 7 3211 2600 F +61 7 3211 0297 E [email protected] PROJECT SCALE DATE DRAWN CHECKED
13 09/02/23 UPDATED DA DRAWINGS LC
www.marchesepartners.com
NOOSA SPRINGS BOUTIQUE HOTEL
1:250 @A1
FOR APPROVAL
14 13/09/24 FOR COORDINATION LC 06/02/25 AB BY
15 20/09/24 FOR COORDINATION LC Sydney · Brisbane· Melbourne · Adelaide
16 17/10/24 FOR COORDINATION LC Kuala Lumpur · Auckland · Christchurch · London · Madrid JOB DRAWING REVISION
17 07/11/24 MINOR CHANGE LC 0 5 10
NOT FOR CONSTRUCTION
18 06/02/25 MINOR CHANGES UPDATE MM
ABN 33 590 578 323
20079 DA1.02 18
Page 8
MINOR CHANGE REGISTER LEGEND
SITE BOUNDARY PAVILION 5 DELETED. LIFT AND STAIR ID DESCRIPTION
1 RECONFIGURED
TERRACE SIZES REDUCED ON
2 GROUND LEVEL.
1 DELUXE
3 NOT USED. 1 PRESIDENTIAL SUITE
PRESIDENTIAL SUITE CHANGED TO 2 x 1 ROOM
4 DELUXE ROOMS.
2 ROOM SMALL
5 CAR PARK SHADING HEIGHT REDUCED. 3 PREMIUM SUITE
5 BALCONY
6 TENNIS COURT SIZE INCREASED.
6 POOLSIDE COURTYARD
7 AMENITIES BUILDING SIZE INCREASED. 7 CIRCULATION
8 LANDSCAPE DESIGN UPDATED BY PDG. 8 LIFT
9 STAIR
10 COMMUNAL
11 PORT COCHERE
12 ROAD EXTENSION
1 13 SHORT TERM PARKING
14 REFURBISHED PORT COCHERE
15 NEW HOTEL ENTRY
16 LIGHT WEIGHT ENTRY ROOF OVER
BUILDING OVER
17 HOUSE KEEPING ROOM
18 SERVICES ROOM / CUPBOARD
19 PLANT & EQUIPMENT
20 POOL
23 BOH ADMIN
24 PWD
25 FEMALE BATHROOMS
26 MALE BATHROOMS
27 MALE STAFF AMENITIES
28 FEMALE STAFF AMENITIES
29 FURNITURE STORE
30 GENERAL STORE
31 LINEN STORE
32 KITCHEN
33 SCISSOR LIFT
34 DRY STORE
35 LIQUOR STORE
36 HOUSEKEEPER OFFICE
37 KEG ROOM
38 LIQUOR COOLROOM
39 SERVICE CORRIDOR
40 PREP & SERVICE KITCHEN
41 FUNCTION COLD ROOM
42 TROLLEY STORE
43 AV
44 FREEZER ROOM
45 COLD ROOM
46 KITCHEN & POT WASH
47 WET WASTE
48 DRY WASTE
0 49 LOADING DOCK
2300
00 50 DIRTY LINEN
220
BUILDING OVER
51 COMMS
23000 52 MSB
WATER TANK POOL PLANT
22000 61 19 53 SERVICE VEHICLE ACCESS ROAD
8 55 ELECTRIC VEHICLE CHARGING STATION
21000 8 56 MOTORCYCLE PARK
17 59 VIEWING DECK
ID
21000
VO
22300 60 DDA COMPLIANT RAMP
FIRE HYDRANT HOT WATER PLANT DOMESTIC CW
PUMP ROOM LOCATION PUMPSET 18
20000 61 WATER TANK
19 EXISTING DAY SPA & FITNESS CENTRE ABOVE
9 62 TENNIS COURTS
7 9
19000
6
RAISED TENNIS COURT.
CARPARKING UNDER
ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM
LG.1 LG.2 LG.3 LG.4 LG.5 LG.6 LG.7 LG.8 LG.9
1 1 1 1 1 1 1 1 1
62
5 5 5 5 5 5 5 5 5
IMPORTANT NOTES: REVISION DATE DESCRIPTION BY CLIENT DRAWING TITLE
NOOSA SPRINGS REAL ESTATE PTY
3 25/09/20 DA APPROVAL ST
LOWER GROUND FLOOR PLAN
Do not scale from drawings. All dimensions to be checked
on site before commencement of work. All discrepancies to 4 09/10/20 DA APPROVAL REVISED ST
LTD
be brought to the attention of the Architect. Larger scale 5 14/10/20 DA APPROVAL REVISED ST
drawings and written dimensions take preference. This 6 04/11/20 COUNCIL PRESENTATION ST
drawing is copyright and the property of the author, and must 7 01/12/20 DA APPROVAL REVISED ST
Marchese Partners International Pty Ltd
not be retained, copied or used without the express authority 8 12/11/21 RFI ST
of MARCHESE PARTNERS INTERNATIONAL PTY. LTD. 9 04/03/22 DA REVISED DESIGN ST Level 14, 46 Edward Street. Brisbane, QLD 4000. Australia
10 13/04/22 REVISED DESIGN BY P +61 7 3211 2600 F +61 7 3211 0297 E [email protected] PROJECT SCALE DATE DRAWN CHECKED
11 09/02/23 UPDATED DA DRAWINGS LC
www.marchesepartners.com
NOOSA SPRINGS BOUTIQUE HOTEL
1:250 @A1
FOR APPROVAL
12 13/09/24 FOR COORDINATION LC 06/02/25 AB BY
13 20/09/24 FOR COORDINATION LC Sydney · Brisbane· Melbourne · Adelaide
14 17/10/24 FOR COORDINATION LC Kuala Lumpur · Auckland · Christchurch · London · Madrid JOB DRAWING REVISION
15 07/11/24 MINOR CHANGE LC 0 5 10
NOT FOR CONSTRUCTION
16 06/02/25 MINOR CHANGES UPDATE MM
ABN 33 590 578 323
20079 DA1.03 16
Page 9
MINOR CHANGE REGISTER LEGEND
SITE BOUNDARY PAVILION 5 DELETED. LIFT AND STAIR ID DESCRIPTION
1 RECONFIGURED
TERRACE SIZES REDUCED ON
2 GROUND LEVEL.
1 DELUXE
3 NOT USED. 1 PRESIDENTIAL SUITE
PRESIDENTIAL SUITE CHANGED TO 2 x 1 ROOM
4 DELUXE ROOMS.
2 ROOM SMALL
5 CAR PARK SHADING HEIGHT REDUCED. 3 PREMIUM SUITE
5 BALCONY
6 TENNIS COURT SIZE INCREASED.
6 POOLSIDE COURTYARD
7 AMENITIES BUILDING SIZE INCREASED. 7 CIRCULATION
8 LANDSCAPE DESIGN UPDATED BY PDG. 8 LIFT
9 STAIR
10 COMMUNAL
2.5 OU C
11 PORT COCHERE
12 ROAD EXTENSION
ONTOUR
1 13 SHORT TERM PARKING
14 REFURBISHED PORT COCHERE
15 NEW HOTEL ENTRY
8 16 LIGHT WEIGHT ENTRY ROOF OVER
9
17 HOUSE KEEPING ROOM
18 SERVICES ROOM / CUPBOARD
52
19 PLANT & EQUIPMENT
5000L IN-GROUND GREASE TRAP BELOW
20 POOL
23 BOH ADMIN
9 51
24 PWD
25 FEMALE BATHROOMS
50 LOADING DOCK
26 MALE BATHROOMS
49 53 27 MALE STAFF AMENITIES
CA
8
FE
28 FEMALE STAFF AMENITIES
SE
RV
ER
29 FURNITURE STORE
Y
39 47 48 30 GENERAL STORE
T
31 LINEN STORE
N
RA
AU
46
00
ST
45 29 32 KITCHEN
RE
35
33 SCISSOR LIFT
44 43
34 DRY STORE
40
41 42 35 LIQUOR STORE
36 HOUSEKEEPER OFFICE
33
39 39 37 KEG ROOM
BUILDING OVER
37 38
32 38 LIQUOR COOLROOM
36 35 34 39 SERVICE CORRIDOR
40 PREP & SERVICE KITCHEN
31
30 41 FUNCTION COLD ROOM
29 42 TROLLEY STORE
27 28 43 AV
44 FREEZER ROOM
45 COLD ROOM
46 KITCHEN & POT WASH
47 WET WASTE
24 25 0 48 DRY WASTE
2400
BUILDING 49 LOADING DOCK
2500 2 OVER 26
0 0 50 DIRTY LINEN
2300
2400 51 COMMS
0 BUILDING OVER
2300 23 52 MSB
0
6 6 6 6 6 6 53 SERVICE VEHICLE ACCESS ROAD
LO
BB
8 55 ELECTRIC VEHICLE CHARGING STATION
Y
/R
EC
EP
ROOM ROOM ROOM ROOM ROOM ROOM
8 56 MOTORCYCLE PARK
TI
25510
ON
R
59 VIEWING DECK
VE
G.10 G.11 G.12 G.13 G.14 G.15 17
ID
O
VO
1 1 1 1 1 1 60 DDA COMPLIANT RAMP
G
IN
18
D
61 WATER TANK
IL
BU
9
62 TENNIS COURTS
7 9
EXISTING DAY SPA & FITNESS CENTRE
ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM
G.1 G.2 G.3 G.4 G.5 G.6 G.7 G.8 G.9
1 1 1 1 1 1 1 1 1
5 5 5 5 5 5 5 5 5
BUILDING OVER
IMPORTANT NOTES: REVISION DATE DESCRIPTION BY CLIENT DRAWING TITLE
NOOSA SPRINGS REAL ESTATE PTY
3 25/09/20 DA APPROVAL ST
GROUND LEVEL PLAN
Do not scale from drawings. All dimensions to be checked
on site before commencement of work. All discrepancies to 4 09/10/20 DA APPROVAL REVISED ST
LTD
be brought to the attention of the Architect. Larger scale 5 14/10/20 DA APPROVAL REVISED ST
drawings and written dimensions take preference. This 6 04/11/20 COUNCIL PRESENTATION ST
drawing is copyright and the property of the author, and must 7 01/12/20 DA APPROVAL REVISED ST
Marchese Partners International Pty Ltd
not be retained, copied or used without the express authority 8 12/11/21 RFI ST
of MARCHESE PARTNERS INTERNATIONAL PTY. LTD. 9 04/03/22 DA REVISED DESIGN ST Level 14, 46 Edward Street. Brisbane, QLD 4000. Australia
10 13/04/22 REVISED DESIGN BY P +61 7 3211 2600 F +61 7 3211 0297 E [email protected] PROJECT SCALE DATE DRAWN CHECKED
11 09/02/23 UPDATED DA DRAWINGS LC
www.marchesepartners.com
NOOSA SPRINGS BOUTIQUE HOTEL
1:250 @A1
FOR APPROVAL
12 13/09/24 FOR COORDINATION LC 06/02/25 AB BY
13 20/09/24 FOR COORDINATION LC Sydney · Brisbane· Melbourne · Adelaide
14 17/10/24 FOR COORDINATION LC Kuala Lumpur · Auckland · Christchurch · London · Madrid JOB DRAWING REVISION
15 07/11/24 MINOR CHANGE LC 0 5 10
NOT FOR CONSTRUCTION
16 06/02/25 MINOR CHANGES UPDATE MM
ABN 33 590 578 323
20079 DA1.04 16
Page 10
MINOR CHANGE REGISTER LEGEND
SITE BOUNDARY PAVILION 5 DELETED. LIFT AND STAIR ID DESCRIPTION
1 RECONFIGURED
TERRACE SIZES REDUCED ON
2 GROUND LEVEL.
1 DELUXE
3 NOT USED. 1 PRESIDENTIAL SUITE
PRESIDENTIAL SUITE CHANGED TO 2 x 1 ROOM
4 DELUXE ROOMS.
2 ROOM SMALL
5 CAR PARK SHADING HEIGHT REDUCED. 3 PREMIUM SUITE
1 5 BALCONY
6 TENNIS COURT SIZE INCREASED.
6 POOLSIDE COURTYARD
7 AMENITIES BUILDING SIZE INCREASED. 7 CIRCULATION
8 LANDSCAPE DESIGN UPDATED BY PDG. 8 LIFT
9 STAIR
10 COMMUNAL
2.5 OU C
11 PORT COCHERE
12 ROAD EXTENSION
ONTOUR
13 SHORT TERM PARKING
BU
IL
14 REFURBISHED PORT COCHERE
D
IN
G
8 15 NEW HOTEL ENTRY
O
VE
16 LIGHT WEIGHT ENTRY ROOF OVER
R
8
9
17 HOUSE KEEPING ROOM
18 SERVICES ROOM / CUPBOARD
19 PLANT & EQUIPMENT
61
20 POOL
23 BOH ADMIN
9
24 PWD
25 FEMALE BATHROOMS
26 MALE BATHROOMS
LOADING DOCK BELOW 27 MALE STAFF AMENITIES
BUILDING OVER
VOID
28 FEMALE STAFF AMENITIES
LOADING 29 FURNITURE STORE
DOCK BELOW
30 GENERAL STORE
ROOM 31 LINEN STORE
L1.15 32 KITCHEN
7 1
5 33 SCISSOR LIFT
ROOM 34 DRY STORE
BUILDING OVER
L1.14 35 LIQUOR STORE
VOID
1
5 36 HOUSEKEEPER OFFICE
VOID
ROOM 33
37 KEG ROOM
L1.13 28630
1 OVERFLOW CAR PARK
38 LIQUOR COOLROOM
5 39 SERVICE CORRIDOR
ROOM 27000
L1.12 40 PREP & SERVICE KITCHEN
1 41 FUNCTION COLD ROOM
5
ROOM 42 TROLLEY STORE
L1.11 43 AV
1 44 FREEZER ROOM
5
+RL 28.73
ROOM SMALL 45 COLD ROOM
L1.10 46 KITCHEN & POT WASH
2
5 47 WET WASTE
ROOM
48 DRY WASTE
L1.9
ROOM 1
49 LOADING DOCK
4 L1.8 50 DIRTY LINEN
ROOM 1 5 51 COMMS
L1.7 52 MSB
6 6 6 6 6 6 ROOM 1 5 53 SERVICE VEHICLE ACCESS ROAD
8 L1.6 55 ELECTRIC VEHICLE CHARGING STATION
1
8 ROOM 5 56 MOTORCYCLE PARK
PRESIDENTIAL SUITE DELUXE DELUXE L1.5 59 VIEWING DECK
17
L1.1 L1.2 L1.3 1
1 1 1 18
28700 ROOM 5 60 DDA COMPLIANT RAMP
L1.4 61 WATER TANK
1 5 62 TENNIS COURTS
ID
VO
5
18°
BUILDING OVER
IMPORTANT NOTES: REVISION DATE DESCRIPTION BY CLIENT DRAWING TITLE
NOOSA SPRINGS REAL ESTATE PTY
3 25/09/20 DA APPROVAL ST
LEVEL 1 PLAN
Do not scale from drawings. All dimensions to be checked
on site before commencement of work. All discrepancies to 4 09/10/20 DA APPROVAL REVISED ST
LTD
be brought to the attention of the Architect. Larger scale 5 14/10/20 DA APPROVAL REVISED ST
drawings and written dimensions take preference. This 6 04/11/20 COUNCIL PRESENTATION ST
drawing is copyright and the property of the author, and must 7 01/12/20 DA APPROVAL REVISED ST
Marchese Partners International Pty Ltd
not be retained, copied or used without the express authority 8 12/11/21 RFI ST
of MARCHESE PARTNERS INTERNATIONAL PTY. LTD. 9 04/03/22 DA REVISED DESIGN ST Level 14, 46 Edward Street. Brisbane, QLD 4000. Australia
10 13/04/22 REVISED DESIGN BY P +61 7 3211 2600 F +61 7 3211 0297 E [email protected] PROJECT SCALE DATE DRAWN CHECKED
11 09/02/23 UPDATED DA DRAWINGS LC
www.marchesepartners.com
NOOSA SPRINGS BOUTIQUE HOTEL
1:250 @A1
FOR APPROVAL
12 13/09/24 FOR COORDINATION LC 06/02/25 AB BY
13 20/09/24 FOR COORDINATION LC Sydney · Brisbane· Melbourne · Adelaide
14 17/10/24 FOR COORDINATION LC Kuala Lumpur · Auckland · Christchurch · London · Madrid JOB DRAWING REVISION
15 07/11/24 MINOR CHANGE LC 0 5 10
NOT FOR CONSTRUCTION
16 06/02/25 MINOR CHANGES UPDATE MM
ABN 33 590 578 323
20079 DA1.05 16