REVISION E - RFI STAGE REVISION E - RFI STAGE
LAUNDRY REDUCED VOID
4,500
2,300
2,300
6,200
6,055
REVISION E - RFI STAGE
ENSUITE / WIR REDUCED
5,514
REVISION E - RFI STAGE
BACK DOOR RELOCATED
TO REDUCE GFA
3,190
REVISION E - RFI STAGE 3,790
LEVEL TRANSITION INCLUDED IN GFA CALCS
REVISION E - RFI STAGE
3
95
REVISION E - RFI STAGE
4,
LAUNDRY REDUCED
VOID
4,929
3,005
829
REVISION E - RFI STAGE
LEVEL TRANSITION INCLUDED IN GFA CALCS.
ENTRY REDUCED
1 Ground Level 2 Upper Level
1:200 1:200
REVISION E - RFI STAGE
GFA CALCS AMENDED
Plot Ratio - Total
Unit Story Area Max Plot Ratio
Unit One Ground Level 80.47 0.4:1
Unit One Upper Level 72.16
Unit Two Ground Level 62.46
Unit Two Upper Level 96.30
311.39 m² 311.6
B L A C K Avocet Duplex
GFA CALCULATION
W O O D
DA.21
Scale Project No. Date Revision For BDH Properties Pty Ltd
1:200, 1:1 @ A3 202416 16/12/2024 E 3 Avocet Pde, PEREGIAN BEACH QLD 4573
a r c h i t e c t u r e & d e s i g n
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Traffic Engineering Letter.pdfRelated documentApplication case desk ↗
About this file
- File size
- 15.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.