Council archive · source document
Information Response MCU12/0208
31 Private lots adjoin retained bushland in many areas throughout the proposed development.
Demonstrate how this is a superior outcome to perimeter road interfaces particularly in achieving
bushfire setbacks, managing urban runoff, private (yard) encroachment and restricting public and
maintenance access.
Response:
Please refer to the revised Ecological Report included as Attachment 7. This report concludes the following;
The proposed Noosa on Weyba development is not a standard urban residential development and is based on a
Body Corporate model and as such many of the issues typically associated with having private lots fronting onto
open space /conservation areas will be avoided (i.e. extension of back yards, dumping of refuse, garden
escapees etc). Provision has also been made for appropriate building setbacks adjacent to all areas of potentially
hazardous vegetation and fire-trails for bushfire management purposes.
Having residential lots fronting onto open space conservation reserves in some areas also provides an
opportunity for a “soft” edge to these conservation areas as opposed to a “hard” edge that would be associated
with roadways. In areas where lots are not separated from adjacent Open Space Conservation areas, the
proposed restrictions on fencing and keeping of domestic pets within the residential lots should effectively
increase the availability of habitat for native fauna inhabiting the adjoining Open Space Conservation reserves.
Issue
Affordability of the proposed Environment Levy
Information Required
32 Provide an estimate of the proposed Environmental Levy cost to future property owners given
this cost impost will be on top of existing Council Rates and various levies, water rates and other Body
Corporate Charges. It is assumed from reading the Noosa on Weyba documentation that the
Environment Levy will pay for fauna fences and associated maintenance, wildlife road crossings,
revegetation/offset plantings and maintenance, bushfire management, feral animal control,
weed control and the maintenance of urban park, Lake Weyba buffer, wetland/ stormwater
treatment, roadside verges and noise buffers.
Response:
Please refer to Attachment 4 for an estimate of the proposed Body Corporate Levy cost to future property
owners within the Community Title Report. The attached Body Corporate Levy budget within the Community
Title Report shows estimates for between 800-1000 subsidiary lots and estimates the total cost to future
property owners as indicated in the below provided table:
Initial Estimate Noosa on Weyba Principal Scheme Budget
25
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Information Response MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.