Information Response MCU12/0208
An extension of the Noosa cycleway system will be provided at no cost to the public, which will substantially
enhance cycle and walkway access to the National Park and Lake Weyba, and create an alternative cycleway
route off Walter Hay Drive to Noosaville
The project will allow for flood free emergency access / egress from the dwellings along Lake Entrance Boulevard
to the north of the subject site that currently get “cut off” in medium flood conditions.
INTEGRATED TRANSPORT NETWORK UNIT
Issue
Pedestrian Networks
Information Required
74 Based on the average person walking 80m per minute, please demonstrate the walkability of the
site between internal and external origins and attractors. In non-recreational c i r c u m s t a n c e s , a d u l t s
are typically only comfortable walking for between 5 to 20 minutes, with children only
comfortable to walk for between 5 to 15 minutes.
Response:
Please refer to Attachment 3 and 6 which include the A1 Concept Master Plan and amended Urban Design
Report which considered the walkability of the site between internal and external origins and attractors. Whilst
the A1 Concept Master Plan is simply an indication of what could be developed it identifies a logical and useable
pedestrian network. Detailed analysis and assessment of all pedestrian networks will be undertaken as part of
further approvals required.
Issue
Cycle facilities
Information Required
75 Demonstrate that safe on-road and off-road cycling facilities will be provided between the
development site and existing infrastructure in the surrounding urban areas. At-grade road
crossings must be avoided (i.e. road crossings for pedestrians and cyclists must be achieved by
underpasses that meet best practice).
Response:
Please refer to Attachment 3 and 6 which include the A1 Concept Master Plan and amended Urban Design
Report which considered cycle facilities between the development site and existing infrastructure in the
surrounding urban areas. Whilst the A1 Concept Master Plan is simply an indication of what could be developed
it identifies a logical and useable cycle network. Detailed analysis and assessment of all pedestrian networks will
be undertaken as part of further approvals required.
Issue
The proposal appears to place an over reliance on the existing on-road cycle network to provide active
transport mode-shift outcomes for the development. On-road cycle lanes generally service the needs of sport
and advanced commuter cyclists, not the needs of less confident cyclists or recreational/family cyclists that
could be expected from the proposed residential development.
Information Required
76 In accordance with Austroads there are concerns over the safety to cyclists from the development, as
Walter Hay Drive carries very high traffic volumes (9,500-13,000 vpd according to Traffic Impact
51
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Information Response MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.