Information Response MCU12/0208
87 Demonstrate that the proposal is accordance with the Performance Outcomes of the Code for
Integrated Water Management, Specifically, demonstrate that the safety of people on the site is
maintained and potential damage to property on the site is minimised.
Response:
Since the original application was prepared and submitted, the location of the access road to the Lot 11 site
has been relocated to the southern boundary. It has been offset from this boundary to minimise flood
impacts to the neighbouring properties. This road crossing is now located upstream of Areas F and G within
the flood study, and so blockage of culverts would have minimal impact to these proposed lots.
The results of the analysis showed that even with complete blockage of all proposed culverts that sufficient
flood immunity is provided for all of the proposed lots. However, the increase upstream of the Keyser
Creek crossing is significant, as the minimum road level (3.83 mAHD) had to be set high enough to maintain
traffic ability during a regional PMF event. This could potentially exacerbate existing flooding issues for
some upstream properties, which has been further analysed as below:
A range of blockage factors was trialled, to look at the potential impact at comparison points H0, H1, H2
and H3 which are located upstream of the site in Keyser Creek. The results are shown in the table below.
Sensitivity Analysis – Culvert Blockage
The results show that there is minimal impact upstream, even with 50 percent blockage of the culverts. If
the blockage factor is increased to 80 percent then there is a significant impact directly upstream of the
culverts, however, the impact is significantly reduced before it affects areas where there are existing
properties (H0 and H1). It is only when there is 100 percent blockage of the culverts that upstream
properties are negatively impacted upon.
It is considered that this situation is extremely unlikely given the large size of the proposed culverts (flow
area totalling 32.4 m2) and the low flow velocities in the area. However, in order to reduce the likelihood
of blockage it is proposed to install debris deflector walls on the culvert inlets for the southern crossing of
Keyser Creek. An example of debris deflector walls is shown in Figure 10.07 of QUDM (2007). The purpose
of the debris deflector walls is to allow built up debris to rise with the flood waters, allowing flows to pass
underneath.
Project 11 of AR&R: Blockage of Hydraulic Structures (2013) details the levels of blockage that should be
considered for culvert crossings. Table 3.16 summarises the proposed blockage values that should be used
for various types of culverts. For culverts with effective debris control measures, such as debris deflector
walls, the design blockage is 10 percent and the severe blockage amount is 25 percent. Given that even
with 80 percent blockage there is minimal impact to upstream properties, the provision of debris deflector
walls is considered to sufficiently reduce any increased flood risk to upstream properties resulting from the
proposed development.
For further information regarding the above item please refer to Section 8.4.3 of the amended Flood Study
(see Attachment 13).
56
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Information Response MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.