Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

Information Response MCU12/0208

of 64

Text shows just the words. Original shows the document exactly as it was published.

             4. Establishment and maintenance of environmental interpretative signage throughout the Noosa
                 on Weyba project that provides residents and visitors with information concerning the Koala
                 ecology and conservation issues of relevance to the Noosa on Weyba locality.

    In addition to educating the community on environmental features, the proposed Community Title Scheme
    Body Corporate levies structure will also contain an environmental levy to maintain the Koala proof /
    wildlife exclusion fencing and provide funds to manage feral animals in the expanded Eenie Creek section
    of the Noosa National Park.

    The Noosa on Weyba development will also incorporate an Integrated Water Cycling Management scheme
    which, in conjunction with the latest stormwater management technique, will aid in improving the
    stormwater quality impact on surrounding waterways. The stormwater quality treatment of the Noosa on
    Weyba development employs a range of innovative measures to ensure the best results. These include:
         10 kilolitre rainwater tanks for each residential lot. (This is more than twice the requirement of
            Queensland Development Code)
            Bio-retention street trees and bio-retention gardens incorporated into the road reserve
         Bio-retention basins
         Vegetated bio-retention swales
            Litter baskets
         Natural wetland areas
         Buffers to environmentally sensitive areas

(6) Should a Development Approval be granted the land owners have applied to the Qld State Government to
    have the subject site declared a registered Wildlife Refuge to further protect the environment and the
    surrounding ecosystem . The dedication of the BDOA ‘Send’ land will result in only 19% or 58ha of the
    303ha total site area is to be developed into net urban uses footprint (this excludes the environmental
    buffers) therefore allowing for approximately 81% or 245ha to be either deemed as National Park or
    environmentally protected land.

    Community benefits

(7) The Noosa on Weyba development will generate a large amount of income for both the State and Council
    with the creation of $7,640,000 in Stamp Duty income to the state and annual rates income at project
    completion of $661,000 will also be delivered.

(8) The Noosa on Weyba Locality Plan provides for a range of housing affordability options, including Age Care
    and Retirement Living, for an estimated population of 2,000 people and the creation of housing for some
    600 to 800 people that will work in the surrounding shire. The proposed development will not only
    providing housing for employees of existing jobs in the area but is also projected to create an abundance of
    additional employment opportunities. The Noosa on Weyba project is also predicted to create an
    estimated 2,023 construction jobs during development of the estate over an anticipated 8 years with an
    estimate $250,000,000 being spent on construction during that time as well as an estimated 309 full time
    operational jobs in the immediate locality when the project is completed. The proposed development will
    also support existing local business, employees and the Noosa Civic Shopping Centre with annual
    household expenditure of $22,600,000 predicted to be created once the project is fully completed.

(9) Public amenity in the form of a tea house / café will be made available at the proposed entrance to the
    new National Park on Hollett Road, and this will include public parking for cars and bicycles in Hollett Road,
    which will all service the public visiting the expanded National Park and accessing Lake Weyba.

(10) The proposed Noosa on Weyba development will create and enhance the efficiency in the use of the
     existing community infrastructure and facilities in the region through the following provisions;
         The project will allow for flood free emergency access / egress from the dwellings along Lake
             Entrance Boulevard to the north of the subject site that currently get “cut off” in medium flood
                                                      9

Used in these records

About this file

File size
1.6 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Information Response MCU12_0208.pdf · 1.6 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.