Appendix D - Code Assessment · RAL19/0011
short and long term; and
S16.3 Street lighting is provided in accordance with
f) ensures that the existing Section 3.19 of PSP5 Engineering Design Standards –
systems are upgraded or Roads, Drainage and Earthworks;
relocated to be capable of
supporting the proposed AND
development;
S16.4 For lots not within a sewerage service area—the
lot has sufficient area and other attributes to ensure
sustainable on-site sewerage
39
disposal ;
Advisory note
PSP24 – Effluent Disposal details requirements
for the design and siting of effluent disposal
systems where located outside a sewerage
service area. Compliance with PSP24 will be
considered as part of Council’s assessment of
the plumbing and drainage application.
S17.1 Components of the essential network
infrastructure that are likely to fail or may result in
contamination when inundated by flood water –
a) comply with Table 13.12; or
b) are designed and constructed to exclude water
inundation or infiltration and resist hydrostatic and
hydrodynamic forces as a result of inundation.
O17 Essential network infrastructure
(e.g. electricity, water supply, sewerage
and telecommunications) maintains
effective function during and immediately
after flood events.
Electricity supply infrastructure Not applicable
O18 Uses and works maintain a safe S18.1 Building footprints are situated clear of
distance from electrical infrastructure any power easements on-site;
including substations, overhead power
lines, power poles and transformers. AND
S18.2 Building footprints are not less than 50m
from an existing fenced electricity substation.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix D - Code Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 404 KB (small file)
- File type
No other editions are linked here.