|                                                                                           O7 /        |
         INTEGRATED PLANNING ACT 1997                        +                                                          "Patt,      Version 2.4, 29 May 2006
                                      Form 1        Development Application                                                                    eT

                                Common                                            details                                        *

          ee
              The comptetion of aff applicable questions on Part A is mandatory for all applications. Part A must be accompanied by fhe completed IDAS Assessment Checklist if
                   required, and by one (1) or more other completed parts of the Form as required. For more information on the parts of the Form refer to www.ipa.gid.gov.au.
             Any information requested in the form may be provided in an attachment to fhe appication. For furthes informafion about compteting the folowing detais, refer to Guide 1.
        _Ary information requested In the Form may De PrOVIRE? an ae eT   ane  ear i ee
           Description of land                      1.   Street address: fncludinghouse number, street name, suburbylocality name & postcode} (if applicable)
         -_Alltand the subject of the appfication, must be                         _—        —
           dented Howove. @ deseo fhe ond i                  lo      A.   456.27           Si           MWISOSAY1 LE                                 .
       See Reet Achey ERA)                          2.   Name of water body or watercourse, within which the development is proposed: (ff applicable)
           cin
           development is proposed within a water body ar
          watecourse.                               3.   Lot on plan description (eg. Lot 123 on RP 4567) / GPS coordinates:
     @ were.                                     | Coo                  S           2 72y3
           ered by at on lan descrion. These deta            Lot          SS       ¢€f     722
           bol eoeanent       documents ortrovgh the | 4 The above description is for: (tick applicable box)
           However, ifthe land on which the developments ({())_  the land.on which the development is proposed; or
           Po       ee            eto                    1 (i)   the land adjoining the water body or watercourse, within which the development is
          watercourse) provide~                                  proposed; or
           a ceiving bijecentiodo                        C (iii) the water body or watercourse.                                                  ;
           (0 er onilafatentlond (ee i Meeion Boy.  |9-  Shop/tenancy number:           6,   _Storey / level:           7.   Total area of land: (m? or ha):
           wists                              vereiem|   [|
           SEE            a car toty ot Cartoust                                                Ti IGE                        _     675 a.
           Bee       eA          ovement ea         8.   Local government area in which the land is situated: (eg. Esk, Hervey Bay, Wooced etc.) (if applicable)
           ma
            cal governments ava unless wed under te          NOCSA            SH (RE          Corrciu
           Local Government Act 1993.               9.   Port authority for the strategic port land or strategic port land tidal area on which the
                   soeewiee    voters rien               development is proposed: (eg. Port of Brisbane, Port of Townsville) (if applicable)
           Advice for completing Q9 - 09 if                           i     posed:
           Senceminctien|                                [MA
           Proposal details                         10. Existing use of the land: (eg. vacant, single house, shop etc.)
           remeromarinmaaaesamons | [Vaca
           provided in an attachment to the application.      _    VACAVET
    ©                                               11.  Proposed use of the land: (eg. 6 uni epartment building, 30 lot residential subdivision, ERA for aquaculture in
;                             :                         ponds with a fotal area of 7 ha for which wastes are released into waters efc).
                                                           SISGCE               DETATCHED                      Dwi va
           a
           Other applicable parts of Form 1         12.  Other parts of Form 1 completed as part of this application: (eg. Part D, Part £, etc)
           completed parts of Form 1. For information about
          when a part of Form 4 may apply refer to Guide 1
           Applicant details                      113. Applicant's name:                               15.  Contact person:    ~
                 identify who és making the application. The                                                                               _
           copicent noe! pot be the omner of be and                                                                                                            .
          _ When signing and lodging this application 14. Contact number.                              16.  Facsimile number/e-mail address:
           The    applicant is responsible for ensuring the                                                       =
          intrmaton provid is cored. Te assessment          O72      7FS5 10                         |        le7_g9es§               1o4y
                  any referral agency & the Chiet Executive
           (where apolcable) will rety on this information when | 17. Postal address:
                  and deciding the application.                       j
           Wipe atc       conpony-nconzt pence                   Ob                   SE         BIEETOR> ARK                           W058
           mmust be shown.                          118. Signature:                                                   19.  Date:
Full text of the other 27 sections

Section 2

"INTEGRATED PLANNING ACT 1997                                                                                                Part A, Version 2.4, 29 May 2006
          Land owner's consent (if applicable)       20.   Land owner's consent to the making of this application:
         con mn cota oD sup, O8                             PF                Mame                      | CSionatwre S|                             Oat
         Section 3.2.1(3) of the IPA prescribes that an                                                                 .
         writken consent of te Land owners, if the application @                                          .                                                              .
          §) amaterial change of use;                       O      Soe         atlacted                   Woe anne ce cceeeeeeec cence reese     bereeeeneneees
          (@ reconliguration of a lot,                        a
          {fi) work on land below high-water mask & not within a (ii)
            canal as defined under the Coastal Protection and Meee tcc e cease etneccece tebe ccseccees eee e cee ee ten eueccee reece perenerceeseee
             Management Act 199%,0r                           ase                                                                           :
          (iv): work on tail corridor Land defined under the (iii)
             Transport Infrastructure Act 1994. .              cee ence cece eae ee nce nce eee nee ba ence ee cee cree nee ene e eee rene estaba nse eeeenr nes
          Section 3.8.1(2)(a) of the IPA provides that        .
         landowner’s consent is nat required for a mobite or (iv)

           Resource entitlement (if applicable) -     21.  Does this application involve a State resource prescribed under a regulation (other than involving
          Section 3.2.1(5} of the IPA requires evidence of quarry material on State coastal land under the Coastal Protection and Management Act 1995)?
         involve a prescribed Stale resource.               (1 NO - go to. 024                      (1 YES - go to q22
           resource entitlement be given for applications that
          application See Aare uken eh anoty shat an  22.  This apptication is accompanied by evidence: (tick applicable box)
           widrout evidence of the a entifement             [1())   of the allocation of, or entitlement to, the resource — attach evidence and go to 023(u)
           Refer to schadute 10 of the intagrated Planning - _ [Ai the chief executive of the department administering the resource is satisfied the
           Reguiation 1998 that prascribes the nature of evidence   development is consistent with an allocation of, or entitlement to, the resource - go
          required by the State in support of the lodging af this  to Q23    —_—_—_————STseTrareaev
  .        development application.                         (1 (iii) the chief executive of the department administering the resource is satisfied the          @
                                                                    development application may proceed in the absence of an allocation of, or
                                         :                          entitlement to, the resource - go fo Q23
          Advice for completing 073       __ | 23.          Evidence of the resource entitlement:
         * Fequled under oo? Or Gi) above. fevidenceS  |:   (i)   Resource entitlement / authority   details             (vii) Official stamp of the department
           The official stamp of the Dapartment of Natural                                                                   administering the resource (if
          Resources, Mines and Water is mandatory where the  os                                                                    Die,
          application involves any water or riverine quarry (ii) Name of delegated officer
           material under the Water Act 2000.                     CT
           Section 3.2.1(5A) allows the resource eager 40 mit
           the time the evidence may be used. 023 {vi) must be i      ifj
                 ee            hedevaters Mi)               (iii) Position of   _—       officer
        |                   ;                               (iv)  Ps of ~ officer
                                   oe                        (v)  Date
                ‘                                           (vi)  pet date of evidence (a
            Assessment triggers                        24.   Is the !DAS Assessment Checklist completed and attached to this application?
            an   en    eae ee pateromody t |                 C1 YES                      (1 NO - the assessment manager may refuse to eocept this application on the
           must be completed for all other applications.                                           grounds that the application has not been properly made
          . Plans / drawings / reports                 25.   Pians/drawings/reports accompanying this application:
           So                                                      Man! raving Report Number
           manager, referral agencies and any person viewing    7                                     .
           the application during public sorutiny or public    (i)
           notification to understand the scope of the proposal sencesersen ene ere meen nnn erent ete                                         TS
            and any potenti impact                             {ii)
 ‘,                                                           (iii)
                                                       YF      iv)
           eee... eo
            PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information required by Part A
                               and any other relevant part of Form 1.                             .                          ,
           OFFICE USE ONLY (appfcable to assessment manager's)                                               :
             = ee                                                  ed                                                      ee
’                                               DATE            5               RECEIVING OFFICER'S |   4                        REFERENCE
                                                      Notification of Engagement of Private Certifier (Optional formg
             To                 :                                     Council. | have been engaged as the private certifier for the building work referred to in this application. :
             Date ofengagement:    /   /    Accreditation Number.                   __ Name:                              Signature:

Section 3

INTEGRATED PLANNING ACT 1997                                                                                                   Part A, Version 2.2, 25 duly 2005
                                                         Form        1   Development Application                                                                            idas

                                                                                                                                                             *
                                                                                                                                    g                             »
                            |                              ommon                                          oétails                                            2              :
                                                                                                                                                             Cy
                                                                                                                                                             rom         :
                                                                                                                                                             x    +     s            4

                                The comptetion of ail applicable questions on Part A is mandatory for all Apptications. Part A must be accompanied by the completed IDAS Assessment Checkist if
                                    required, and by one (1) or mare other completed parts of the Form A required. For more information on the parts of the Form refer to www.ipa.dd.gov.au.
                              Any information requested in the form may be provided in an attachment $6 the application. For further information about completing the following details, refer to Guide 1.
                            Description of land                         1.    Street addreés: fnciudinghouse number, street name, suburbfocality name & postcode) (if applicable)
                           All tand the subject of the application, must be              s
                            ierted. However, a derpton of the tand is net   [10 _ fLebe TT SIRBEF                                    NGEePVIFKIELE
                           Enrmnantally Refeoert Achity GA)             2.    Name/f water body or watercourse, within which the development is proposed: (if applicable)
                           development is posed within aeeater| body or      LAL,
                           watercourse,                                 3.      |4ot on plan description (eg, Lot 123 on RP 4567)! GPS coordinates:
                            Advice for completing Q3 - Most land can b
                            identifed by aot on plan deccrfion, These detaits  47 &                     ERP      FRR4ES                                                               |
                            can be obtained from title documents or through the                 aes            .
  ©                         local government.                            A.   Wa te description is for: (tick appicable box}
                            However, ifthe land on which the development i        ()_  the land on which the development is proposed; or
                           the development is proposed brewek bedi ar. iy     (J (ii)  the land adjoining the water body or watercourse, within which the development is
                                      ‘Pend s       fos th                             proposed; or
                                  tot          inti                                -.
                                 otningietnced eel a  me                      C (ii) the water body or watercourse.
                     /        coitnofadatertted fnntsdn tay,            |S    Shop/tenancy number.             6.  Storey /levet                  7.    Total area of land: (m? of ha):
                                GPS    coordinates wh  i
                      v~    dowlopment ie uithins water bod P ttereourse. :                                             PVG LE -                             -      ed C7
                  A         Serene       ate oracle Oe | Oy ePohes on   8.    Local government area in which the land is situated: (eg. Esk, Hervey Bay, Woocoo efc.} {if appicabie)
                               fi           in    +  QYaoplies i                                     es i     .             ws         .
             i                 fo: Areas below high water mark are not within 8  NCODA           BAliftA          CHR Wore
           Y/         pn Government Act $293,                           9.    Port authority for the strategic port land or strategic port land tidal area on which the
            |                  } govemment's area ufless provided for under the                                                                                          I,
         \                  develsement De   ioic por    era rategie          development is proposed (eg. Port of Brisbane, Port of Townsville) {if applicable)
                             Advice for completing Q9 - Q9 applies if                        i                                              i         i
     S)                     port land tidal areg/ For more details refer to Guide 11  Mf?                                                                                             |
LS                          Proposal details                             10.  Existing use of the fand: (eg. vacant, single house, shop etc.)
                            provided an attactrnert to the onlication. °          VACANT
                                                                         11.  Proposed use of the land: (eg. 6 unit apartment building, 30 jot residential subdivision, ERA for aquaculture in
                                                                              ponds with a total area of 7 ha for which wastes are released info wafers etc).
                                                                                 QNokde              CATHCAFO                   PhytecnVvE
  ©                        “Other applicable parts ofForm1        -|12.  Other parts of Form 1 completed as part of this application: (eg. Part D, Part I, etc)                        -
                            Part A  must sfways b      fed by oth                        —                     ;                                  P,                 me
                            Contd pare      cr t Fat irisebon about             -YARF-D            8     fOPRPS          ASEIAAEO TINT LOPE bt
                            when a past of For 1 may apply refer to Guide 1.
                            Applicant details                            13.  Applicant's name:                                  15.  Contact person:
                           Clearly identify who is making the application. Th                                  ~        Z
                             ratatncey ebete owner ofthe tend,    °                  LRG aE IE Giver? it                                  Cn L-      CUALME
                            When signing and lodging this application    14,  Contact number.                                    16.  Facsimile number/e-mail address
                            The    appkcent i  sible for ensuring th                                                                        >                          ;
                            information provided is correc. The assesomert     oe      3 BISCO 4                F                       a       BEE 5/2 , <4
                            manager, any referral agency & the Chief Executive
                             fwhere appicable) will rely on this information when | 17. Postal address:
                            tine aolant ia conpany-a ct                              LK                   BEE 2.
                            l£the app!icant Is a company - a contact person     Pe               ae   ABE             = hie               alll   (ORE            KO SS
                            rust be shown.                               18.  Signature:                                                        19.   Date

Section 4

INTEGRATED PLANNING ACT 1997                                                                                                 Part A, Version 2.2, 25 July 2005
                         Land owner's consent (if app¥cable)        20.   Land owner's consent to the making of this application:
                         Section 3.2.1(10Xa) of the IPA prescribes that an                                                                ;
                         cote     cana eer tbe pope       mae                                                       ee
                         without the fand owner's consent.                                                                          Ze
                        An apptcation must be supported by the consent of  9 Kile <OZZR                                    LEBEN occ ce                           PPO ELD
                         ail land owner d the application involves:                                                                    2.
                          ny re   iguration o' ale,
                          (8) work on tand below high-water mark & not within (in)
                              a.canal as defmed under the Coastal Protection tect err eect eee tener cern eee ec en ee need ere e ene e een tee cae  e tenn enter baw een er eee ees
                             and Management Act 1995.01                     ()
                          {h4 work on rail corrator land defined under the we   ee ee              ee     ee ee ee         ne ee eee be ene e ee ence
                             Transport Infrastructure Act 1994,             (v)
                        For a mobile or temporary ERA - fandowner's
                         consent is not required.
                        For more information refer to Guide 1,
                         Cee     ator      6f eppicable)            21.   Ooes this application involve taking or interfering with (other than interfering with quarry material on State
                         Section 3.2.1{10\b) of the IPA prescribes that an                                  ;
                         eee       {    eee          pete nie             coasfal land under the Coastal Protection and Management Act 1995) a State resource?
                         without evidence of the resource entitlement.        NO - go    G24                         oO YES - go to Q22
                        Advice for completing Q22                            .          oo,        .               .                     .         .
                         Refer to schedule 10 of the Integrated Planning 22. This application is required by regulation to be accompanied by evidence: (tick app¥cable box)
                         Regutation 1998 that prescribes the nature of evidence oO                           -                                  .
                         required by the State in support of the lodging of this (i) of the allocation of, or entitlement to, the resource — attach evidence
                         development application.                         1 (i)    the chief executive of the department administering the resource is satisfied the development is
                                                                                   consistent with an allocation of, or entitlement to, Ihe resource — go to 023
                                                                          (C1 (iti) the chief executive of the department administering the resource is satisfied the development
                                                                                   application may proceed in the absence of an allocation of, or entitlement to, the resource -
                                                                                   go to Q23
 ©                                                      _            123. Evidence of the resource entitlement
                         eimudeiwiehee                                    ()    Resource entitiement / authority    details             (iv) Official stamp of the department
                         The official stamp of the Department of Natural                                                                    administering the resource (i
                         Resources and Mines is mandatory where the                                                                         applicable
                         application involves taking or interfering with water or (i) Name of delegated officer
                         “7,                                                    _
                                                                          (ii)  Position of     a officer
                                                                          ()    rs of ~ officer
                                                                           (v)  Date
                         Assessment triggers                         24.  is the IDAS Assessment Checklist completed and attached to this application?
                         the cavoleten of soot apaty ithe eoicals only    {7 YES                       [-] NO - the assessment manager may refuse to accept this application on the
                         must be completed for all other apptications.                                            grounds that the application has not been properly made
                         Plans / drawings / reports                  25.  Plans/drawings/reports accompanying this application:
                        An       ion shaudd be accompanied by details t
                       spr te oper Grab          he aecoret                     Plan /Drawing/ Report Number             |               Tite =| ate
                         manager, referral agencies and any person viewing   @                                                                te
@                        Aotification to understand the scope of the proposal Cane teense score ese ces eer eeroseccsessrees LLL IEAM... corres esccee
                         the application during public scrutiny or pubtic                                                       nf                   d
                         and any potential pack                            ON eect | EMAL BEYE.                                                                  |,
                                                                             )

                                                                             (v)
                         PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of lodgement, fails to pravide all applicable information required by Part A
                                            and any other relevant part of Form 1.
                        a a
                        OFFICE USE ONLY (eppicatve to assessment manager's
                        reo                               atte
                                                          RECEIVED                                  NAMEIS                                      NUMBERIS
                                                                  Notification of Engagement of Private Certifier (Optonat format)
                          To                                                       Counail | have been engaged as the private ceriifier for the building work referred to in this application.
                          Dateofengagement      /   /    AcctedtationNumbes_o                       Names                                Signature”

Section 5

INTEGRATED PLANNING ACT 1997                                                                                  Part D, Version 2.0, 4 October 2004

                                       Form 1        Development Application                                                                      Toes

                                                              .                                                                      .       .
                                          Materialchangeofuse                                                                        3;              >
                                                                                                                                      Oe                   ,
                                                        .                                                    .                       a”   t
                             assessable against a local government's planning scheme                                                 ee             J
                                                                                                                                     ¢ x         no
                                                                                                                                     & ‘ > ‘          SS

                                      Completion of all applicable questions on Part D ts mandatory for all applications involving assessment of a
                                               material change of use (MCU) assessable against a local governments planning scheme.
                  Nature of the application            1.   This appfication is for. (éck 1 or both if applicable)
                  Adevelopment permil authorises               [i Preliminary approval for a material change of use of premises including conceptual
                  cowora " Senin the apyrorel procec,             design for any associated works that require approval under the planning scheme (ie.
                  and does not authorise development to occur.    consideration of the proposal concep!)       :
                                                               AND/ OR
                                                                   Development permit for a material change of use of premises including conceptual
 @                                                                design for any associated works that require approval under the planning scheme.
                  The subject land                     2.   How the subject land is identified in the planning scheme {name the zone, precinct etc)
                  Sthmpetgnewsat" | (zhews                                            weer
                  the planning scheme against which the         7.       PED oe           Cea var
                  application will be assessed.

                                                      4.       ho any existing easements on the land?
                                                                  NO
                                                               (0 YES - attach plans of the focation and details of the purpose of the easement
                  Material change of use details       5.   Details of the change to the use of the land: (eg. vacant land to shopping centre, house fo apartment building,
                                                            vacant fand (0 industry (fyre manufacturing) etc.)
                                                               ihn? AitHe                Fe      Nabby txvgtd weet s Olt BLE
                                                       6.   Number of employees:                Nil.
                                                       7.   Operating days and hous
                  Associated buitding works details (if    Sit        .
                  splcabie)                            8.     Site cover           Aer
                  For the definition of ‘site cover", “grass floor          .
@                 area’ and ‘storey’ go to the planning scheme 9. Gross floor area:    RER LT
                                                       11. Number of storeys / maximum height above natura! ground:              / SS.        TRS

                  Associated operational works details |14. Details of associated operational works (eg. fandscaping, cut and fill, drainage, road works etc.)
                   if applicable,
                     meee)                                    Fitd.      VALAKT-OlEG$K Te                      f~HO 2-BS
                                                                             PLEASE NOTE
                                                This application cannot be accepted unless accompanied by Part A of Fonn 1.
                     The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information
                                                          requested by Part A and any other relevant part of Form 1.
                  OFFICE USE ONLY (applicabke fo assessment manager)
                      DATE RECEIVED       |                           |    PeUMBEN Se       |                                                                :

Section 6

°             INTEGRATED PLANNING ACT 1997                                                            :                             IDAS Assessment Checklist, Version 20, 2 Apri} 2007
                                              Form         1   Development Application                                                                                       idas

                                                                                 (Formerly the “Referrals Checklist”)
           —.w oH                    oa                                                                                              eee
              IMPORTANT NOTE FOR ALL APPLICANTS:
              1.    This checklist was formerty referred to as the "Referrals Checklist”. Some of the 'Guides' to using the IDAS Application Forms continue to refer to this document as the
                    “Referrals Checklist’. The name of this checklist was changed from 25 July 2005 to more accurately describe its function.
              2.    Under the IPA and IDAS framework, an application may require assessment by the local Council and/or certain Queensland State entities (e.g. Environmentat Protection
                    Agency, Dept. of Natural Resources and Water, Queensland Heritage Council etc,).
              3.    This checklist is provided to assist applicants to determine when an application requires assessment by a Queensland State entity and may also assist the applicant to
    .               determine the assessment manager’ for the application.
              4,    Therefore, the completion of alt questions in section 1 of this checklist is mandatory for all applications (other than those requiring the completion of Parts A & B only).
              5. _ Itis the responsibility of the applicant to accurately complete this checklist.
     ©        6. — Section 2 is mandatory only if the proposed development is located in any part of a wild river area declared under the Wild Rivers Act 2005.
              7.    Depending on the nature of the apptication, an applicable State entity may be either the assessment manager or an IDAS referral agency for the application.
.             8.    The assessment manager for the application will rely on the information provided in this checklist (as well as any material lodged in support of the application) to identity
                    any applicable referrat agencies for the application in the Acknowledgement Notice. The assessment manager will also rely on this information when identifying if the
                    application triggers referral coordination2.
              9.    To assist you in answering the fallowing questions a series of guides are available free from the IPA website www.ipa.gld.gov.au. Guide 25 explains the role of the IDAS
 ,                  Assessment Checklist in the IDAS application process, and its relationship to the Form 1 devetapment apptication.
         ‘40.       Any other parts of Form 1 that this checklist requires to be completed are available from the Council or the applicable State entity, or can be downloaded free from
                  www.ipa.qid.gov.au,                                                                                                               :
              11.   Section 3 provides advice about the referrals that can be required for applications for building work assessable against the Building Regulation 2006.
                                                                                                                                             EEE
            FO
                                              SECTION 1 - STATE ASSESSMENT (completion mandatory)
              Note:  The following state assessment triggers apply to development other than for building work assessable against the Building Regulation 2006.
              Environmentally retevant activity             1.   The application involves: (tick applicable box/es)
              For more information refer to Guide 4.              (J (i)   an environmentally relevant activity (ERA) for which a code for environmental compliance.
             Unless you answered “none of the above” to Q1,                has not been made - complete Part G of Form 1
             the application requires assessment by the                .        —                                   .                    .                    .
             administering authority.                            LJ (ii)   a mobile or temporary ERA for which a code of environmental compliance has not been
             tf an entity, other than the administering                    Made - complete Part G of Form 1
             authority, is the assessment manager for the             (iii} none of the above
             application, the administering authority is a
             concurrence agency for the application in relatian
             to this matter.
             Note: An application involving ERA 19 and/or 20
             will also require completion of Part Kr of Form 1
             for approval where an allocation under the Water
             Act 2000 is required.
                                                                                                                                                                      Continued overleaf

                     PACE IAT,             Th...                ——                     _                   .         Te                      ey              gn:         :
         .         PLEASE NOTE:            The assessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the
                                    ,                             completed IDAS Assessment Checklist {if applicable).
             OFFICE USE ONLY (applicable to assessment manager)
                 DATE RECEIVED                                                   REFERENCE NUMBERIS

            1  The assessment manager is responsible for assessing and deciding an IOAS application. The assessment manager for an application is prescribed in schedule 8A of the IPA.
            2  For additional information refer to Guide 6 ‘Does my application trigger the referral coordination process?”
            3  The ‘administering authority’ may be either the Environmental Protection Agency, the relevant local government (for a devolved ERA) or the Queensland Department of Primary Industries and
               Fisheries (for a delegated ERA).                                                                                                          :
                                                                                                    Page 1                      :

Section 7

INTEGRATED PLANNING ACT 1997                                                                           IDAS Assessment Checklist, Version 20, 2 April 2007
       State-controfled road matters           2.    The application involves: (tick applicable box/es)
       For more information refer to Guide 3,        (1 (i)  development on land contiguous* to a State controlled road and for -
       Unless you answered ‘none of the above" to Q2,                      .                                    .             .
       the application triggers referral to the Department   () (a) material change of use assessable against the planning scheme;
        f Main R    MR            !      .                                       an
.      of  Main Roads (DMR) as a referral agency. —          (7 (b) reconfiguring a lot unless -
       In certain circumstances DMR will be an advice                                           .     :          .
     agency, while in other circumstances OMR will                  « the total number of lots is not increased; and
       be a concurrence agency.                                     « the total number of lots abutting the State-controlled road is not increased;
      peredule 2 the F Reaulation wih assis you to           1) (c) operational work (not associated with a material change of use assessable against the
       concurrence agency for the application.                       planning scheme or reconfiguring a lof mentioned in (b) above)-
                                                                     * associated with access to a State-controlled road; or
                                                                     « for filling or excavation; or
                                                                     « involving the redirection or intensification of site stormwater from the land, through a
                                                                       pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
                                                                       State-controlled road.
                                                      J (ii) development on land not contiguous to a State-controlled road and -
                                                             L) (a) material change of use -
                                                                    « assessable against the local government's planning scheme; and
                                                                    * mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
                         ,                                            that schedule;
                                                             [_] (b) reconfiguring a fot for a purpose mentioned in schedule 5 of the IP regulation
                                                                  ~   and exceeding the thresholds set by that schedule;
                                                             LJ (c)   operational work (not associated with a material change of use assessable aoeinst QD
                                                                     planning scheme or reconfiguring a lot mentioned in (b) above)-
                                                                    e assessable against the local government's planning scheme; and
                                         .                          * mentioned in schedule 5 of the 1P Regulation and exceeding the thresholds set by
                                                                      that schedule.                                                                            .
                                                         (iit) none of the above
       Clearing vegetation                     3.    The application involves: (tick applicable box/es)
       For more information refer to Guide 12.     ‘a (i)     material ch ange of use —-
       Unless you answered “none of the above" to Q3,                               ,             .           .
       the application requires assessment by the             (a)  assessable against the planning scheme;
       Department of Natural Resources and Water                                  ining —
       (NRW),                                                _(b)  ona lot containing                                                           |
       if an agency other than NRW is the assessment .             *  acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
     . Manager for the application, NRW is a                     “ «  ifthere is no property map of assessable vegetation for the lot - remnant vegetation;
       ae enge caeney forthe appicaton in relation            (c)   where the existing use of the land is a rural or environmental use; and ~
       H you ticked 03) or (i, your application requires      {d)  where the size of the land is 2 hectares or larger - complete Part J of Form 1
       referral to NRW for assessment regardless of C (ii)    reconfiguring a lot -
      whether vegetation clearing is proposed or not.                             _.
                                                  .           (a)  on alot containing a category 1, 2 or 3 area shown on a property map of
                                                                   assessable vegetation or, if there is no property map of assessable vegetation fo
                                                                   the lot, remnant vegetation;                                                         @
                                                              (b)   where the size of the lot before the reconfiguration is 2 hectares or larger;
                                                              (c)   where 2 or more lots are created; and
                                                              (d}   where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
                                                    CJ (iii)  operational work -
                       ;                                      {a)   for the clearing of native vegetation where the vegetation clearing is made
                                                                    assessable under Schedule 8 of the IPA; and
                                                              {b)   not associated with a material change of use assessable against the planning
                                                                    scheme mentioned in {i) or reconfiguring a lot mentioned in (ii) - complete Part J of
                                                                    Form 7
                                                         (iv) none of the above.
       Strategic port land                     4.    The application involves:
       I red ihe, a 0 ee hat vist                    [1 (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (TI
        you ticked (i) - the relevant Port Authority is the
       assessment manager for the application.              Act) - complete Part | of Form 1
       If you ticked (ii) Queensland Transport is a  (1 (ii) a material change of use that is inconsistent with the land use plan approved under the
      concurrence agency for the application.            ’  Tl Act for the strategic port land - complete Part | of Form 1
                                                     I (iii) none of the above

    - 4  Land contiguous to a State-controlled road is defined in schedule 14 of the (P Regulation to mean land - if part of the land is within 100m of the State-contralled road; or thal is part of a future State-
         controlled road.
                                                                                   Page 2

Section 8

°           INTEGRATED PLANNING ACT 1997                                                                                    IDAS Assessment Checklist, Version 20, 2 April 2007
            Acid sulfate soils                          5.   The application involves development on land situated in an identified? local government area
            For mare information refer to Guide 10.          and where the surface of the land is: (tick applicable box)
            Unless you answered “none of the above” to Q5,    (1) (i) below 20m AHDS and the development will involve the excavation of 1000mor more of
            the application requires assessment by                       .        .               |
            Department of Natural Resources and Water                 soil or sediment at or below 5m AHD, or
            (NRW).                                           (] (i) at or below 5m AHD and the development will invotve filling the site with 1000m? or more
            lf an agency other than NRW is the assessment             of material
  .         manager for the application, NRW is an advice          .
            agency for the application in relation to this        (iii) none of the above
           matter.                                                     ‘
            Major hazard facilities or possible        6.    Does the application involve a material change of use for a major hazard facility or possible
            major hazard facilities                          major  hazard facility as defined under the Dangerous Goods Safety Management Act 2001?
            For more information refer to Guide 17.           An 0
            If you answered “YES” to Q6, the application
            requires assessment by the Department of         [J YES - complete Part L of Form
            Emergency Services (DES).
            If an agency other than DES is the assessment
            manager for the application, DES is a
            concurrence agency for the application in
            Telation to this matter.
            Water related development under the        |7.   The application involves:                          ,
            Water Act 2000                                   (1) {i)  operational work, for taking or interfering with water under the Water Act 2000, that is:
            For more information about items (a) — (f), refer         (tick applicable box/es)
            to Guide 15. For more information about item                       .                                .                    oe                       oo       .
            (9), refer to Guide 14 Does my application              C] (a)     in a watercourse, lake or spring, (eg. a pump, gravity diversion, stream fe-direction, weir or
   @        involve assessment of a referable dam?                             dam) - complete Part Kz, Kx, Ks, Ks, or Ko of Form 1 whichever is applicable;
            Unless you answered “none of the above” to Q7,            [J (b) for an artesian bore anywhere in the State, no matter what the use - complete Part
            the application requires assessment by the                                     :
            Department of Natural Resources and Water                          Ki of Form 1,
            (NRW).                                                   (J (c)    for a subartesian bore, in declared subartesian area’, or in a certain area covered
            fan agency other than NRW is the assessment                        by a water resource plan, for use for purposes other than stock and/or domestic
            manager for the application, NRW is a                               se        ete Part Ky  of F  }
            concurrence agency for the application in                          USE  - complete Part Ky of Form 1,
            relation to this matter.                                 [_] (d)   for a subartesian bore, in certain declared subartesian areas, for use for stock
                                                                               and/or domestic purposes - complete Part K; of Form t:
                                                                     (1 (e)    for taking overland flow water in certain areas covered by a water resource plan
                                                                              - complete Part Ks of Form 1;
                                                                     (J (f)   for interfering with overland flow water in a drainage and embankment area -
                                                                               complete Part Kioof Form 4
                                                                     [-] (g)  for constructing a referable dam® or works that will increase the storage capacity
                                                                              of a referable dam by more than 10% - complete Part Ks of Form 4; or
                                                              iii     none of the above.
           Removal of quarry material from a          8.    Does the application involve development for the removal of quarry material from a watercourse?
          watercourse                                       requiring an allocation notice under the Water Act 2000?
           For more information refer to Guide 16.
                         yew                -                Co
           If you answered “YES” to Q8, the application
   @       requires assessment by the Department of         (7 YES - complete Parts K; and G of Form 1
           Natural Resources and Water (NRW).                                            .               :                       ‘
           If an agency other than NRW is the assessment
           manager for the application, NRW is a
           concurrence agency for the application in
           relation to this matter.
           Note: Part G of Form 7 is required to be
           completed as the activity of removing quarry
           material from a watercourse is also an
           Environmentally Relevant Activity (ERA).

         5 The identified focal government areas are: Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Cais, Calliope, Catoundra, Cardwell, Carpentaria, Cook,
            Cocloola, Dounglas, Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrooke, isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Mornington, Noosa, Pine Rivers,
            Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday.
         6 Australian Height Datum (AHD).
         7   The declared ground water areas are listed in Guide 13 Development in a declared catchment area,
         8   Referable dam is defined under the Water Act 2000.
         9  Watercourse is defined in sch 10 of the [PA.
                                               ,                                            Page 3

Section 9

INTEGRATED PLANNING ACT 1997                                                                                   IDAS Assessment Checklist, Version 20, 2 Aprit 2007
           Operational work that is tidal work or      |9.  The application involves operational work that is: ( tick the applicable box/es)
           work in coastal management district             LJ (i)    tidal work’ as defined under the Coastal Protection and Management Act 1995 (the
           For more information refer to Guide 18. For                                   .             .     .                                   :
           more information about prescribed tidal work in           Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; Of
           local government tidal areas refer to Guide 24. [ (ii)    tidal work-that is prescribed tidal work" other than in a canal'2 -complete Part P of Form 1; OF
           Unless you answered “none of the above” to Q9,        ves      .         wae                                sae
          the application requires assessment by the       (J (iii)  carried out within a coastal management district under the Coastal Act and for — complete
   :       Environmental Protection Agency (EPA).                    Part M of Form 1 if any box/es (a) to (i) below are ticked,
           fan agency other than EPA sme assessment                  (J (a)    constructing or installing works in a watercourse between MHWS and HAT (ie.
           manager for  ine applicavon, sa                                                             7                                                       .            -
           concurrence agency for the application in                           other than those works in tidal water) where the development has been determined not
           relation to this matter.                                            to be assessable against the Water Act 2000:
           Local goverment is the assessment manager                 ([] (b)   constructing a canal12 intended to be connected to tidat waters;
           for all prescribed tidal work.                                                .          eo
                                                                     [J] {c)   constructing an artificial waterway;
                                                                     (1 {d)    reclaiming land under tidal water;
                                  .                                  [J {e)    disposing of dredge spoil or other solid waste material in tidal water;
                                                                     [J (f) _ interfering with quarry material on State coastal land above high-water mark;
                                                                     [J {g)    draining or allowing drainage or flow of water or other matter across State
                                                                               coastal land above high-water mark;
                                                                     [J (h)    removing or interfering with coastal dunes on land, other than State coastal land,
                                                                               that is in an erosion prone area and above high-water mark;
                                                                     [-] {i}   constructing a bank or bund wall to establish a ponded pasture on land, other
                                                                               than State coastal land, above high-water mark; or                                    ©
                                                                (iv) none of the above.                                            .
           Operational work below high water        | 10.   The application involves operational work that is: (tick the applicable box/es}
           mak      =                                        (71 (i) tidal work"? as defined under the Coastal Protection and Management Act 1995 (the
           For more information refer to Guide 18. For                                   :             .     .
           more information about prescribed tidal work in           Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or
           local goverment tidal areas refer to Guide 24.    [J (ii) tidal work that is prescribed tidal work" - complete Part P of Form 1; Of
           Unless you answered “none of the above” to             ves    .         wa                                voge
           Q10, the application triggers referral to         [1 (iii) carried out within a coastal management district'S under the Coastal Act and for -
.          Queensland Transport (QT) (Maritime Safety                           ;     ;                   ;              i               ial in ti         _
           Oki) es aconcurrence agency.                              [-} (a)   disposing of dredge spoil or other solid waste material in tidal water - complete Part
                           .                                                   M of Form 7;
           Local government is the assessment manager                                  .                 .
           for all prescribed tidal work.                            [-] (b)   reclaiming tand under tidal water - complete Part M of Form 1; OF
                                                                     [J {c)    constructing a canal12, if the canal is associated with reconfiguring a lot -
                                                                               complete Part M of Form 1;        ‘
                                                             fin       none of the above.
           Coastal management                          11.  The application involves: (tick the applicable box/es)
           For more information refer to Guide 18.          [1 (i)     a material change of use assessable under a planning scheme involving operational
           Unless you answered “none of the above" to                  work carried out completely or partly in a coastal management district!5
           Q11, the application requires assessment by the       ;              .                                                 .                    .       oo
           Environmentat Protection Agency (EPA).           [J (ii)    a material change of use assessable under a planning scheme involving building
          If an agency other than EPA is the assessment                work, carried out completely or partly in a coastal management district that is —
           manager for the   application, EPA is a                                     .                  :      .
           concurrence ageney for the application in                   + the construction of a new premises with a GFA'® of at least 1000m?
           relation to this matter.                                    e the enlargement of the GFA of existing premises by more than 1000m2
                                                            [1] (iii)  reconfiguring a fot assessable under schedule 8 of the IPA where the land is situated
                                                                       completely or partly in a coastal management district
                                                            [1] (iv)   reconfiguring a lot’? assessable under schedule 8 of the IPA and in connection with
                                        .                              the construction of a canal12 - complete Part M of Form 1
                                                                 (v)   none of the above

          40 Tidal work is defined in sch 10 of the IPA.
          11 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
          12 Canal means canal as defined under the Coastal Protection and Management Act 1995
          13 Tidal work is defined in sch 10 of the IPA.
          14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a loca! government tidal area.
          15 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a
             coasta! management district under section 47(2} of that Act.
          16 GFA is defined in sch 14 of the IPA to mean the gross floor area. For a definition of how to calculated GFA, go to the planning scheme against which the application is being assessed.
          17 Under s#17 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, musi be
             accompanied by the application for the operational works to construct the artificiat waterway.
                                                                                             Page 4

Section 10

INTEGRATED PLANNING ACT 1997                                                                                    IDAS Assessment Checklist, Version 20, 2 April 2007
           Development within the limits of a         12.   Does the application involve development below high water mark'® and within the limits of a port
          port                                              under the Transport Infrastructure Act 1994?
          For more information refer to Guide 18. For       [Kio
          information about prescribed tidal work refer to
         Guide 24.                                          LJ YES - complete Part M of Form 1, or Part P of Form 1 if the work is prescribed tidal work
          If you answered “YES” to Q42, the appfication
          triggers referral to the Port Authority.
          The Port Authority is a concurrence agency if the
          development is -
          © within 200m of a shipping channel or an entry
             and exit shipping corridor for the port
          * within 1000m of a swing basin, a commercial
             Shipping wharf, a mooring, anchorage or spoil
             grounds;
          © within 1000m of a planned port facility
             identified in a land use plan approved under
             the Transport Infrastructure Act 1994.
   Ot     In all other situation the Port Authority is an
          advice agency.
         Marinas                                      13.  Does the application involve operational work that is tidal work for a marina'$ with more than 6
          For more information refer to Guide 18. For      vessel berths?
          information about whether a marina is prescribed  mn 0
          tidat work refer to Guide 24. The local
          government is the assessment manager for all      (1) YES - complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work
          prescribed tidaf work.
          if you answered “YES” to Q13, the application
 @        triggers referral to Queensland Fire and Rescue                  .
          Service as an advice agency.                  ;
          Tidal works in strategic port land tidal]   14.  Does the application involve tidal works within a strategic port land tidal area20?
         areas                                            [YNO
          For more information refer to Guide 18.               YES - complete Part M of Form 1
          Unless you answered “NO” to Q14, the retevant
          Port Authority is the assessment manager for the
          application and the Environmental Protection
          Agency {EPA) and Queenstand Transport (QT)
          ale concurrence agencies for the application.
         Heritage                                     15.  Does the application involve development in a heritage registered place as defined under the
          For further information refer to Guide 19,       Queensland Heritage Act 1992?
          If you answered “YES” to Q15, the application       ao
          triggers referral to the Queensland Heritage
          Counsil as concusrence agency for the            [_] YES - complete Part C of Form 1
          application.
          Unless you answered “none of the above” to  err      - application i |   han  (   f  plicable bl s)        inst the  planni      h         d the  lot sh        :
                                                           The       application involves: (tick applicable boxe
          15(b), the application involves referral to the      (}    a material change o use assessable against             the planning scheme and the     tot shares a
          Environmental Protection Agency as an advice               common boundary with a protected area or registered place under the Queensland
          agency for the application                                 Heritage Act 1992:
                                                          CA (ii)    reconfiguring a tot if the lot shares a common boundary with a protected area or
@                                                      .             registered place under the Queensland Heritage Act 1992;
                                                          C1 (iii)   none of the above.

          Declared catchment areas                   16.   The application is in an area declared to be a catchment area under the Water Act 2000 and
          For more information, including a list of the    involves: (tick the applicable box/es)
          declared catchment areas within Queenstand,           .            oe             :                .                           .
        refer to Guide 13.          _                     L]{i)      reconfiguring a fot if any lot resulting from the reconfiguration is less than 16 hectares;
          Unless you answered “none of the above” to      CJ (ii)    development assessable against the planning scheme involving the establishment or
          Q16, the application requires assessment by the            expansion of a waste water disposal system, other than a disposal system for carrying
          Department of Natural Resources and Water                              .                           vo                    :                    .
          (NRW).                                                     out an environmentally relevant activity under the Environmental Protection Act 1994:
          If an agency other than NRW is the assessment   mii        none of the above
          manager for the application, NRW is a
          concurrence agency for the application in
          relation to this matter.

         48 High water mark is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide.
         19 Marina is defined in the Transport Operations (Maritime Pollution) Regulation 1995,                                                                             .
         20 Strategic port land tidal areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port land.
                                                                                            Page 5

Section 11

INTEGRATED PLANNING ACT 1997                                                                               IDAS Assessment Checklist, Version 20, 2 April 2007
         Contaminated land                         17.  The application involves: (tick the applicable box/es)
         Applications involving material change of use       j           rari                 j                          j        _
         andl or reconfiguring a fot may vigger this    C1 (i)   reconfiguring a lot for which all of part of the premises are
         referral,                                                {a)   premises mentioned in the IPA, schedule 8, part 1, table 2 -
         For more information refer to Guide 5.                      e item 5, including the exemption otherwise provided for by paragraph (d);
         Unless you answered “none of the above” to                  » item 6, including the exemption otherwise provided for by paragraph (e); or
         017, the application requires assessment by the             ¢ item 7, including the exemption otherwise provided for a mining activity or petroleum
         Environmental Protection Agency (EPA). If an                   activity: or
         agency other than EPA is the assessment                        ; ctivily,        .                               .               .
         manager for the application, EPA will be a               (b)   in an area for which an area management advice has been given for unexploded
,        concurrence agency for the application in                      ordnance - complete Part N of Form 4
         relation to this matter.                            .            .
                                                        (J (ii)  a material change of use -
                                                                  (a)   made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or
                                                                  {b)   assessable against the planning scheme and if all or part of the premises is in an area
                                                                        for which an area management advice has been given for unexploded ordnance -
                                                                        complete Part N of Form 1
                                                             {ili) none of the above
         Electricity infrastructure                18.  The application involves: (tick the applicable box/es)
         Far moet wndormation fetes tn schecke 2of the Fe (CO (i) reconfiguring a fot where any part of the lot is -
        Unless ou answered ‘none of the above" to                 « subject to an easement in favour of a distribution entity or transmission entity under the
         Qi8, the application triggers referral to the               Electricity Act 1994 and the easement is for a transmission grid or supply network under
         agency to which the easement is granted in -                that Act; or                                   .
        favour of as advice agency.                               « situated within 100m of a substation site;                                                ©       .
                                                         (J (ii)  a material change of use, assessable against a planning scheme and not associated
                                                                  with reconfiguring a lot if -
                                                                  * any part of the premises is subject to an easement in favour of a distribution entity or
                                                                     transmission entity under the Electricity Act 1994 and the easement is for a transmission
                                                                     grid or supply network under that Act; and
                                                                  ¢ any structure or work that is the natural and ordinary consequence of the use is, or will be,
                                                                     located wholly or partly in the easement;
                                                         (_] (iii) a material change of use, assessable against a planning scheme and not associated
                                                                  with reconfiguring a lot if any part of the premises is situated within 100m of a substation
                                                                  site;
                                                          J (iv)  operational work that is filling or excavation assessable against the planning scheme,
                                                                  not associated with reconfiguring a lot, if -
                                                                  * any part of the premises is subject to an easement in favour of a distribution entity or
                                                                     transmission entity under the Electricity Act 1994 and the work is located wholly or partly in
                                                                     the easement;
                                                         df          the work is located wholly or partly within 10m of a substation site;
                                                             (v}  none of the above.
         Land designated for community             19.  Does the application involve development assessable against the planning scheme and on lan
         infrastructure                                 designated for community infrastructure?                                           ,
         Applications involving development on land       ye                        :             '            fhe
 .       designated for community infrastructure may     {i) intended to be supplied by a public sector entity; and
         tigger this referral.                           {ii} on land not owned by or on behalf of the State; and
         For more information refer to schedule 2 of the oe
         IP Reaulation,                                  {iii} other than development —
         Ifyou answered “YES” to Q19, the application        (a)  for the designated purpose; or                 .
         ‘equires assessment by the chief executive of                ‘                                  :
         the department administering the Act authorising     b)  carried out by, or on behalf of, the designator.
         the development for the designated purpose.         NO
         tf an agency other than the designator is the   OC  YES
         assessment manager for the application, the
         designating agency will be a concurrence
         agency for the application in relation to this
         matter.

                                                                                        Page 6

Section 12

°          INTEGRATED PLANNING ACT 1997                                                                         IDAS Assessment Checklist, Version 20, 2 April 2007
           SEQ Regional Plan                       20.  The application involves (tick applicable box/es) -
          . For more information refer to schedule 2 of the Cj (i) a material change of use of premises -
           P Reauiaioo,                                                in a Major       Development Area in the Urban Footprint fi
           Refer to Chapter 2, part SA and schedule 10 of        (a)   in a  Major  Development    Area in  the Urban  Footprint for -
           the Integrated Planning Act 1997, and schedule             C)   (i)   anurban activity -
           defers     ay          = relevant                                  1 _   in an area included in a structure plan where the IPA, section 3.1.6
                      latory Provision                                              .          .        .                                       .
           Unless you answered “none of the above” to                               applies;
           Q20, the application requires assessment by the                    (1)   inan area not included in a structure plan where -
           Office of Urban Management (OUM).                                                      .             .             ar                 :
                                                                                   » the IPA, section 3.1.6 applies to the application for the material change
                                                                                     of use; or
                                                                                   e the premises exceeds 10,000m2; or
                                                                                   e the gross floor area (GFA) on the premises will exceed 10,000m2: or
                                                                                   + impact assessment is required under the relevant planning scheme
                                                                      (J   (ii)  intensive animal husbandry, or
                                                                      C)   (ii)  residential development involving a rural residential purpose
                                                                  {b) in the Regional Landscape and Rural Production Area for -
                                                                      L]   (i)   an urban activity and not specified in section 2.4(2); or
                                                                      LJ   (ii)  residential development involving a rural residential purpose and not            .
                                                                                 specified in section 2.6(2)
                                                                   (c) in the Rural Living Area for an urban activity and not specified in section 2.8(2);
   ©                  ,                                            (d) in the Investigation Area for —
                                                                     LJ    (i)  anurban activity and not specified in section 2.10(2):
                                                                     [-]   (ii) residential development involving a rural residential purpose and not
                                                                           specified in section 2.12(2); or
                                                                     L     (iii) intensive animal husbandry
                                                        [1]   (ii) reconfiguring a lot-
                         ,                                      On land in a Major Development Area       in the Urban Footprint that is:
                                                                   (a}  not included in a structure plan; and
                                                                   (b)  not specified in section 3.1(2).
                                                       LY     (iii) none of the above
           Fisheries matters                      21.  The application involves: (tick the applicable boxes) /
          For mare information refer to schedule 2of the IP C1 ({i) an assessable material change of use for aquaculture - complete Part O, of Form 1;
          Regulation                                   CI (ii)  assessable operational work that is the construction or raising    of a waterway  barrier
          Unless you answered “none of the above" to                          P         “                                        g              y        .
          Q21, the application requires assessment by the       complete Part Os of Form 1,                                      ,
          panaiment al Erinany novos ond Fshevien      LJ (iii)  assessable operational work completely or partly within a declared fish habitat area-
          If an agency other than DPI&F is the assessment       complete Part Oz of Form 1,
  @       manager for the application, DPleF isa       (_] (iv) assessable operational work that is the removal, destruction or damage of a marine
          concurrence agency for the application in                   .                       .
          relation to items {i) - (iv) and an advice agency    plant complete Part Oz of Form 1,
          in relation to item (v).                     [] (v)   development assessable under the IPA, schedule 8, part 1, on land that adjoins a
                                                                declared fish habitat area;
                                                       [LY vi) none of the above.

                                                                                    Page 7             .

Section 13

INTEGRATED PLANNING ACT 1997                                                                         IDAS Assessment Checklist, Version 20, 2 Aprit 2007
           integration of land use and public      22.  The application involves: (tick the applicable box/es)—
           panspo " ermaton refer to Guide 23, schedule  _] (i) a material change of use assessable against the planning scheme for a purpose         —
           8A of the IPA, & schedule 2 of the IP Requlation.     mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
           Unless you answered “none of the above’, the          schedule.
           application triggers referral to QT as a          .              .                                                     .
           concurrence agency.                           (J {ii) reconfiguring a lot—
                                                                  L_] (a)   on land that is completely or partly within a public transport corridor, and the
                                                                            total number of lots increases;
                                                                  (-] (b)   on land that is completely or partly within a future public transport corridor or
                                                                            an airport's public safety area;
        :                                                         (J (c)    on land that is within 400m of a public passenger transport facility or a future
                                                                            public passenger transport facility, and the total site area is 5000m¢2 or greater;
                                                                  [1 (d)    for a residential purpose within the 25 ANEF contour for an airport;
                                                                  O (e)     for aresidential purpose resulting in 100 or more allotments.
                                                         (_] (iii) operational work assessable against the planning scheme, but not associated with a
,                                                               material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
                                                                above, on land that—
                                                                  [_] (a)   is completely or partly within a public transport corridor or a future public
                                                                    .       transport corridor;
                                                                  [_] (b) — will result in work that encroaches into an airport's operational airspace.
                                                        cin none of the above.
           Railway safety and efficiency           23.  The application involves: (tick the applicable box/es)—
           For more information refer to Guide 23, schedule  i) a material change   of use assessable against the    planning scheme for a   purpose
           SA of he IPA & Schedule 2 of the [P Reaulation ulation, 00 mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
           Unless you answered “none of the above”, the
           application triggers referral to QT as a             schedule.
           concurrence agency.                           (_] (ii) reconfiguring a lot—
                                                                 [1 (a)     on land that is completely or partly within a future public transport corridor,
                                                                            future railway land or a railway tunnel easement;
                                                                 {-] (b) -  on land that is within 400m of a Citytrain passenger railway station or a future
                                                                            Citytrain passenger railway station, and the total site area is 5000m? or
                                                                            greater;
                                                                 (1 (c}     on land that abuts rail corridor land, commercial corridor land or future railway
                                                                            land, and the total number of lots increases;
                                                                 (J (d)     on land that abuts rail corridor land, commercial corridor land or future railway
                                                                            land and an.easement abutting the corridor or future railway land is created;
                                .                                (J (e)     on land that is completely or partly within 100m of, and abutting an approach
                                                                            to, a railway level crossing, and the total number of lots increases;
                                                                 (J (f}     for a residential purpose resulting in 100 or more allotments.
                                                        (C1 (iii) operational work assessable against the planning scheme, but not associated with a ©
                                                                material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
                                                                above, involving extracting, excavating or filling greater than 50m, on land that—
                                                                 (J (a)     is completely or partly within rail corridor land or commercial corridor land, and
                 ;                                                          the work is not for rail transport infrastructure or other rail infrastructure;
                                                                 (J (b)     is completely or partly within future railway land, or a railway tunnel easement;
                                                                 (J (c) — abuts rail corridor land, commercial corridor land or future railway land, and
                                                        J,                  the work is within 25m of the railway boundary.
                                                             {iv) none of the above.
           Moonie to Brisbane pipeline             24.  The application involves the easement for the construction or operation of the Moonie to
           For more information refer to schedule 2of the IP Brisbane strategic pipeline, and involves: (tick the applicable box/es)—
       Se             euered «none of the above" the     (J (i) a material change of use assessable against the planning scheme and not associated
          application biggers veferal to the holder of          with reconfiguring a lot, and any structure or work will be located wholly or partly in the
           pipeline licence No 1 issued under the Petroleum     easement.
           Att 923, currently Santos QNT Pty Ltd, for    O (ii) reconfiguring alot
           awe.                                  .       J (iii) operational work assessable against the planning scheme, that is filling, excavation,
                                                                compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
                                                         /      work is located wholly or partly in the easement.
                                                             (iv) none of the above.

                                                                                      Page 8

Section 14

INTEGRATED PLANNING ACT 1997                                                                           IDAS Assessment Checklist, Version 20, 2 April 2007
            Koata habitat area                      25.  The application involves: (tick the applicable box/es)—
           rune ool te P Readlatee       and             (_] (i) a material change of use of premises in a koala conservation area or koala
           Unless you answered “none of the above", the          sustainability area made assessable. under a planning scheme, that is not for a domestic
           application requires referral to the Environmental    activity and will result in —
          Protection Agency as @ concurrence agency.              (_] {a)  clearing of native vegetation over an area greater than 2500m2:
                                                                  () (b)   anew building and any reasonably associated structure with a total footprint
                                                                           greater than 1000m2;
                                                                  (}(c)    an extension to an existing building and any reasonably associated structure if
                                                                           the extension has a total footprint greater than 1000m2;
                                                                  [J (d)   extracting gravel, rock or sand from an area greater than 5000m2;
                                                                  [1] (e)  excavating or filing an area greater than 5000m2;
                                                                  [J {f)   additional traffic in a koala conservation area or koala sustainability area,
                                                                           between 6p.m. on a day and 6a.m. on the following day.
                                                         (J (ii) reconfiguring a tot in a koala conservation area or koala sustainability area that will
                                                                  result in -
                                                                  (_] (a)  an increased number of lots;
                                                                  [J (b)  clearing of native vegetation over an area greater than 2500m2.
                                                         (J (iii) operational work in a koala conservation area or koala sustainability area made
                                                                  assessable under Schedule 8, Part 1, Table 4, items 1A to 1G (not associated with
                                                                 reconfiguring a lot mentioned in (ii) above) that will result in the clearing of native vegetation
               .                                                 over an area greater than 2500m2.
  @                                                      (] (iv) operational work in a koala conservation area or koala sustainability area made
                                                                 assessable under a planning scheme (not associated with a material change of use
                                                                 mentioned in (i) or reconfiguring a lot mentioned in (ii) above} that is not for a domestic activity
                                                                 and will result in -
                                                                 [_] (a)  clearing of native vegetation over an area greater than 2500m2;
                                                                 C] (b)_  extracting gravel, rock or sand from an area greater than 5000m2:
                                                                 C (c)    excavating oF filling an area greater than 5000m2.
                                                           MK) none of the above.
           Wild river area                         26.  Does the application involve development in a wild river area declared under the Wild Rivers Act
           For more information, refer to Guide 27      2005?
           If you answered YES to Q26, you must also     Ane Oo
           complete section 2 of this checklist. This wilt
           enable you to determine if your apptication can C] Yes
           proceed in a wild river area and which referral
          agency will assess your application against the .
          Wild Rivers Code, or if the proposed                                                       :
          development is “prohibited” in a wild river area.
          Note: Development can be “prohibited’ in a wild
          river area because the application cannot be
          accepted by the assessment manager.
  ©       Preliminary Approval                     27.  Does the application involve a development for which preliminary approval is sought under
          If you answered YES to Q27, the application   Section 3.1.6 of the Integrated Planning Act 1997?
          _Uiggers referral to the Departrhent of Local [an
          Goverment, Planning, Sport and Recreation as        0
          an advice agency.                               | YES
         Wetlands                                  28.  The application involves: (tick the applicable boxes) -           ,
          Demneste  acy       the    construct          C] (i)    amaterial change of use, other than for a domestic activity, assessable against the
            omesic activity means the construction or use               :                io i      ven                     .
          of.a single residence on a lot and any reasonably ;    planning scheme that is in or within 100m of a wetland;
          associated building or structure. Examples of a CL (ii) reconfiguring a lot -
.         building or smucture wnat could be reasonably           In or within 100m of a wetland that will result in     ,
          associated with a single residence include:                                          .           :
          caretaker’s residence, granny flat, building or        CJ (a) more than 10 lots being created; or
          structure used for a home business.                     [-] (b) lots less than 5 hectares:
                                                       [A'(iii)  none of the above
          Note: Welland is defined in the Integrated
          Planning Regulation 1998.
          Unless you answered “none of the above” to
          Q28, the application involves referral to the
          Environmental Protection Agency as an advice
          agency for the application.                                          .

                                                                                     ,                               é

                                                                                      Page 9                                                            .

Section 15

$

.             INTEGRATED PLANNING ACT 1997                                                                      IDAS Assessment Checklist, Version 20, 2 April 2007
 .            Conservation Estate                    29.  The application involves: (tick the applicable box/es)—
              Urban purposes is defined in the Integrated  CJ (i) a material change of use for urban purposes that is in or within 100m of any of the
              Planning Act 1997 as “purposes for which land is     following -                                                                    ‘
              used in cities or towns, including residential,      (1) (a)  a protected area, forest reserve, critical habitat or area of major interest under
              industriat, sporting, recreation and commercial               the Nature Conservation Act 1992::
              purposes, but not including environmental,                                                      u
              conservation, rural, natural or wildemess area       [] {b)   a State forest or timber reserve under the Forestry Act 1959;
              PUIPOSES -                                           [J (c)  a marine park under the Marine Parks Act 2004;
              Unless you answered “none of the above" to           [_] (4)  arecreation area under the Recreation Area Management Act 1988;
              Co ee Ch              Ae OO ice                      [J (e)   a world heritage area listed under the World Heritage Convention;
              agency for the application.                          (_] (f)  Brisbane forest park under the Brisbane Forest Park Act 1977.
                                                           (1 (ii) reconfiguring a lot if -
                                                                   (J (a)   any part of the lot is situated in, or within 100m of, any of the following —
                                                                          (J (i)    a protected area, forest reserve, critical habitat or area of major
                                                                                    interest under the Nature Conservation Act 1992;
                                                                          [J (ii)   a State forest or timber reserve under the Forestry Act 1959;
                                                                          [_] (iii) a marine park under the Marine Parks Act 2004;
                                               :                          [J (iv)   a recreation area under the Recreation Area Management Act 1988:
                                                                          LJ (v)    a world heritage area listed under the World Heritage Convention;
                                                                                    Brisbane forest park under the Brisbane Forest Park Act 1977; and
                                                                   (J (b)   the reconfiguration involves more than 10 lots being created, or any lot
                                                                            resulting from the reconfiguring is less than Sha;                         @
                                                           A (iii) none of the above.

                                                                                       Page 10

Section 16

INTEGRATED PLANNING ACT 1997                                                                                        IDAS Assessment Checklist, Version 20, 2 April 2007

                               (completion mandatory if the proposed development is located in a wild river area)
           Wild River Area                              1.    Which wild river area is the development proposed in?                                                                   '
                                                                                                                            :
           It the responsibility of the applicant to
           determine if the development is proposed in
           a wild river area.         .
           Information about wild river areas including the  The proposed development is to be located in: (tick the applicable boxes)
           geographical location and position of   :              .     .               .
           management areas in relation to properties, can   [_Ji) a high preservation area (HPA);
           be accessed by contacting the Department of            vs               .                .
           Natural Resources and Water (NRW), accessing      L) ii) a preservation area (PA) '
          contacting the department by ema on emai on:       LJ I i)       id fi e  oodp jain management area (FMA);
           the department's website www.nrw.a'd.gov.au or         iti} a wild river fl     Jai     na                   EF.   :                                                  ‘
          wild [email protected]                         (_] iv) a wild river nominated waterway:
           Note on Referrals                                 (_] v) a designated urban area (DUA).
          Referrals for development in a wild river area
          (other than for agricultural activities and animal
          husbandry activities} are not changed from the                                             .
          existing referral arrangements.
          Notes on development assessable
          against the Wild Rivers Code
          For information regarding development in a wild
          river area, see the relevant wild river declaration
          and Guide 27. The relevant wild river
          declaration will provide information regarding
          which types of development must be assessed
          against the Wild Rivers Code, and in some
          cases which types of development are exempt
          from wild river requirements.                                                                                                                                                     ;
          The notes on development assessabte against
          the Wild Rivers Code in this section of the       ‘                    :
          checklist provide some guidance however this                                                    .
          may vary between wild river areas. The relevant
          declaration will provide the information applying
          to each wild river area.
          Applications for some new developments will not
          be accepted if the proposed development is in a
          high preservation area {HPA}. Most applications
          for development activities which may be made
          including those in a preservation area (PA), must
          be assessed against and must comply with the
          Wild Rivers Code where indicated in a relevant
          wild river declaration.   ,                                      .                                             -
          Environmentally relevant activities        | 2.    Does the proposed development only involve any of the following environmentally relevant
          (ERAs) in a designated urban area                  activities (ERAs) in a designated urban area (as mapped in the relevant wild river declaration)?
          If you answered YES, your application for an        :                           ,                                                                      .
          ERA is exempt from any wild river requirements    l) An ERA 28 or ERA 14, or
          and provided there are no other aspects of this    ii) A level 2 ERA except ERA 1, 2, 3, 4, 20, 22 or 59.
          development that require assessment against
©         wild rivers, you do not need to complete the      C] NO                   C] YES (ensure you have completed Part G of Form 1)
          femaining questions in Section 2.
          lf you answered NO to Q2, please complete the
          remaining questions in Section 2.
          Clearing native vegetation                   3. _ Is the application operational work for clearing native vegetation in a HPA?
           YES, there are a limited number of purposes
          for which an application to clear native          C] NO                     LJ] Yes (ensure you have completed Part J of Form 1)             ;
          vegetation may be accepted in a HPA, See
          Guide 27 for a list of relevant purposes for | 4.  If YES, is the clearing?                    .
          which an application may be made in a HPA.               .       .                             .                .                                .        :
          YES and you ticked Q4 box i) the application         1]  3) clearing regrowth (as defined in the Vegetation Management Act 1999) in a registered
          may be made and is assessable against the Wild           area of agriculture in a HPA (see Guide 27): or                                  .                 ‘
          Rivers Code, Hf YES and you ticked Q4 box ii             vey:               .          .                     :
          the application will not be accepted,             CJ ii) in a HPA outside a registered area of agriculture?
          Note: If clearing native vegetation is in a PA,                                                                     ,                        .
          there are no wild river requirements and             :
          provided there are no other aspects of this                                                                           :
          development where wild river requirements
          apply, do not complete the remaining questions
          in Section 2.

                                                                                               Page 11

Section 17

.                                                                                                                                                    t

                INTEGRATED PLANNING ACT 1997                                                                                    IDAS Assessment Checklist, Version 20, 2 April 2007
                Works in tidal areas, coastal               5.    Is the development for specified works? (see definition in the Wild Rivers Act 2005 and Guide 27-
                management districts and fish habitat             Development in a wild river area)
                areas                                                                                                                                                   :
                H you answered YES to Q5, and ticked any          a) NO                   C YES
                boxes in Q6), your application is required to be                                                                                 :
                assessed against and must comply with the Wild] 6. © The application is for one or more of the following:
                Rivers Code.                                           .         .                  co.                       .          ,                  co,
               Hf you answered YES to QS and ticked box i) in    C] i) Operational works that is tidal works or works in a coastal management district (ensure you
                Q6, your application is required to be referred to |   have completed Part M and/or Part P of Form 1), or
                the EPA.                                              +s         .                                         ,                       :
                           .                     ;                (_] ii) Operational works for the removal, destruction or damage of marine plants (ensure you have
                Note: If specified works are proposed in a local
                government area, it is prescribed tidal work — the     completed Part O2 of Form 1); OF
                assessment manager withthe EPA 3s a               [_] iii) Building or operational works in a fish habitat area (ensure you have completed Part 02 of Form 1).
                relevant local government will be the                  be    aa:              .             .             .
                concurrence agency                                                                                                                                                  :
                {f you answered YES to Q5, and ticked box ii) or
                iii) in Q6, your application requires referral to
                OPIF.
                If you answered NO to Q5 and ticked box i} in
                Q6, the application will not be accepted.
                If you answered NO to Q5, ticked box ii) in Q6                  .                                     -                                                 .
                and the development is necessary to install
                authorised works or infrastructure where a
                development permit is not required, or if a                                                                              ‘
                required permit is held, the application must be
                assessed against and must comply with the Wild
                Rivers Code, Applications for purposes other
                than specified works or as described above will                   :
                not be accepted.              :
                lf you answered NO at Q5 and ticked bex iii} in
.               Q6, the application may be made if the works are
                inaPA, These applications must be assessed                   .
                against and must comply with the Wild Rivers
                Code. The application will not be accepted if the                                                                                 .
                development is proposed to be located in a HPA,
                For more information about specified works refer
                to Guide 27                                                                                                       .
                Residential, commercial or industrial       |7.   —_|s the application for residential, commercial or industrial development in a designated urban
                development                                       area?
                If you answered YES to Q7, your application is
                not subject to wild river requirements. Provided C) NO                   {] YES
                there are no other aspects of this development
               that require assessment against the relevantwild) 8° |f NO, does the application for residential, commercial or industrial development involve:
                fiver declaration or Wild Rivers Code, you do not                 .
                need to complete the remaining questions in      C] i) a material change of use made assessable in a local government planning scheme
                Section 2.                                             (ensure you have completed Part D of Form 1); or
                if you answered NO to Q7 and ticked either box         '         .                    ,       .              .
                i) or ii) in Q8, the assessing agency is the     C] ii) operational works associated with reconfiguring a lot (ensure you have completed Part F
                relevant local government. The application must         f Fi     1
                               ‘                   K                   of  Form   1).
                be assessed against and must comply with the
                Wild Rivers Code.                                                                                                                                             ©
                Animal husbandry activities        ~        9.    Does the application involve a material change of use for animal husbandry activities (as defined
                If you answered YES to Q9 your application        under the Wild Rivers Act 2005) in a PA?
               - fequires assessment against and must comply
                with the Wild Rivers Code.                        Cc] NO                . CL   YES (ensure you have completed Part R of Form 1)
                The assessing agency is NRW.
                Note: Applications for animal husbandry
                activities will not be accepted if proposed in a
                HPA. For more details and a definition of animal                                                                                                            .
                husbandry activities see the Wild Rivers Act
                2005 and refer to Guide 27.
                Agricultural activities                     10.   Does the application involve agricultural activities (as defined under the Wild Rivers Act 2005) in
                ff you answered YES to Q10, your application      a PA?
                requires assessment against and must comply
               with the Wild Rivers Code.                         L NO                    1 YES (ensure you have completed Part Q of Form 1)
                The assessing agency is NRW.
                Note: Applications for agricultural activities wit, | 11. If YES is the application for:
                not be accepted if proposed in a HPA. For more        ,           .    .             .
                details and a definiton of agricultural activities CJ i) a material change of use; or                    .
               2                                 r to Guide       [_] ii) operationat works.
                see the Wild Rivers Act 2005 and refer to Guide       7          ‘

                The production of fodder in a PA, and pasture
                improvement using low impact soil disturbance                                                            ,
                techniques is not an agricultural activity as
                defined under the Wild Rivers Act 2005. For
                more information see Guide 27.

                                                                                                   Page 12

Section 18

.           INTEGRATED PLANNING ACT 1997.                                                                                   IDAS Assessment Checklist, Version 20, 2 April 2007
.              Works that take overland flow water         |12. Does the application involve works that take overland flow water in a HPA or an FMA?
           .   The relevant wild river deciaration will state
               works that take overtand flow water are either     | NO                 C] YES (ensure you have completed Past Ks of Form 1)
               seff assessable of assessable, or are exempt
               from wild river requirements.               13.  If YES, is the application for works stated in the relevant wild river declaration to be?
               If you ticked Q13 i), your application must be        .
               assessed by NRW against the Wild Rivers Code    C) i) assessable works                     .
               and must comply with the code.                   [1] ii) self-assessable works
               if you ticked Q13 i) an application is not required   .
               to be made however the works must comply with    C iii) exempt works                           .
               the refevant self-assessable section of the Wild
               Rivers Code, otherwise the works become
               assessable development for which an application
               is required and must be assessed by NRW
 .             against the relevant part of the Wild Rivers Code
               and must comply with the code.                                .
               If you ticked Q13 iii) your application is not
               subject to wild river requirements.
               Applications for development that is other than
               that stated to be assessable, sel-assessable or
               exempt will not be accepted.
               Works that interfere with overland         14.   Does the application involve works that interfere with overland flow water in a FMA?
               flow water
               The relevant wild river declaration will state   O     0                 OC      S fensure you have co pleted Part   Ko of Form 1)
                                                                     N                       YES     (ensure you h    mpleted Part Kio of Form 1
               works that interfere with overland flow water that
               are either self assessable, assessable or exempt} 15. If YES, is the application for works stated in the relevant wild rivers declaration to be?
     ©         from wild river requirements,                    Oo   .         bi        k
               {f you Ucked Q15 i), your application must be        i) ASSESSADIE WOIKS
              assessed by NRW against the Wild Rivers Code      [_] ii) self-assessable works
              and must comply with the code.                         .
               If you ticked Q15 ii) an application is not required LJ iii) exempt works
              to be made however the works must comply with                    .                                          .
              the relevant self-assessable section of the Wild
              Rivers Code, otherwise the works become
              assessable development for which an application
              is required and must be assessed by NRW
              against the relevant part of the Wild Rivers Code
              and must comply with the code.
              'f you ticked Q15 iii) your application is not
              Subject to wild river requirements.
              Applications for development that is other than                                                                                ,
              that stated to be assessable, self-assessable or
              exempt will not be accepted.
              Waterway barrier works                      16.   Does the application involve building or raising waterway barrier works in a PA?
              Applications for building or raising waterway                                       .
              barrier works in a HPA will not be accepted.      CJ NO                  CL] YES (ensure you have completed Part Oz of Form 1)
              if you answered YES to Q16, your application
              must be assessed by OPIF against the Wild
              Rivers Code and must comply with the code.
     ©        Aquaculture (non ERA)                       17.  Does the application involve aquaculture in a PA?
              aoe        for aquaculture in a HPA will not be  C] NO                    Cc] YES {ensure you have completed Part O; of Form 1)
              Ifyou answered YES to Q17, your application
              must be assessed by DPIF against the Wild
              Rivers Code and must comply with the code,                                       ,
              Works that interfere with water ina      | 18.   Does the application involve operational works that interfere with water in a watercourse that is in
             watercourse                                       a nominated waterway in a PA?
              Note: If the development is proposed in a HPA,
              applications for all works that interfere with water CJ NO                LE] YES (ensure you have completed the relevant Part K of Form 1)
           .  ina watercourse (including dams or weirs,              :
              stream realignment or stream diversion) will not 19. IFYES
              be accepted,                                            ,
              in a PA, applications for instream dams and      [J i) The application is for an instream dam or weir; or
              weirs may be accepted in nominated waterways.         +            opin                  .                  .           .          :                        .
               you ticked box in 19, your application wit      L_] ii) The application is for operational works that interfere with water in a watercourse, and is
              not be accepted.                                         for development other than a dam or weir,                                 .
              Note: Operational works outside a HPA or
              nominated waterway are not subject to wild
              river requirements.
              More information and locations of nominated
              waterways is available by contact NRW,
              accessing the department's website
              www.nrw.ald.gov.ay or contacting the       .
              department by email on:                                                                           .
            wild [email protected]!d.qov.au,                                                                                                              ‘

                                                                                                Page 13

Section 19

INTEGRATED PLANNING ACT 1997                                                                                 IDAS Assessment Checklist, Version 20, 2 Aprit 2007
              Environmentally relevant activities      | 20.  Does the application involve an ERA?
              be accepted. Applications which may be made      CL] NO                C] YES (ensure you have completed Part G of Form)
              Most applications for an ERA in a HPA will not
              require referral to the EPA. The assessment of
              some ERAs is assessed by NRW, othershave | 21,  Is the application for an ERA 20 instream?
              been devotved to DPIF, NRW or delegated
              local goverment (see EPA website for more       L} NO                   C] YES
              information on devolved ERAs)
              vonplete Oe 21 Me to Q20 you donotneedto   122. |s a quarry allocation notice held for the proposed ERA 20 instream?
              If you answered YES to Q20 and the              L] No                    LJ Yes
              development is in a PA, your application must be
              assessed by the administering authority?!                       Smeattare                             ot        »
              against the Wid Rivers Code and must comply 23. Does the application involve any of the following in a HPA?                                                       .
             win ihe code, unless the proposal is ier b       i) alevel 2 ERA 11, (and is for specified works or a residential complex)
               evelopment   where an application will not be  .                      .
              accepted, or is exempt from wild river          ii) an ERA 19 (dredging)
             renquramnents (eee Q2). ‘You will be able to     iii) Low impact ERA 20 (out of stream) for specified works or a residential complex (as defined in
               letermine if an application will not be accepted             :    :                          :                   .
              for the development by answering Q21 - Q24.            the Wild Rivers Act 2005, and Environmental Protection Act 1994)
              If you answered NO to 021, you do not need to   iv) an ERA 22 (out of stream)                         ,
              complete Q22. If you answered YES to Q21 you    Ol NO                    gO YES
              are required to complete Q22.
              lf you answered NO to 022, the application wis
              not be accepted. If you answered YES to Q22, | 24. |g the proposed development for ERA 20 (out of stream) and;
              the application must be assessed by NRW             .  P EM A:     and    p                   (                    ;
              against the Wild Rivers Code and must comply     —  ina         an                                                         .
              with the code.                                   —  not low impact; and                                                                                 @
              lf you answered NO to Q23 and the development                     .    .             .                        .
             is proposed inthe HPA the appfication vil not be  —  not for a residential complex in the area, or for specified works.
              application must be assessed by the EPA or       CO  NO                 Lo YES
              accepted. If you answered YES to Q23, the
              NRW (as prescribed in schedule 8A of the IPA)
              against the Wild Rivers Code and must comply
              with the code.                                                           ’
,             if you answered YES to Q24 the application wilt
              not be accepted. If you answered NO to Q24,
              your application must be assessed by NRW                                                                                        -
              against the Wild Rivers Code and must comply
              with the code.                      ,
              Exempt ERAs in a designated urban
              area
              if the development is proposed in a designated
              urban area there may be no wild river
              requirements. See Section 2 Q2.                                                               :
              Note: All appiications that can be accepted must
              be assessed against and must comply with the
              Wild Rivers Code (other than exempt ERAs in a
              designated urban area).                                                                                                                                          .
              Documentation                   _          25.  Has documentation been included with the application describing how the applicant proposes to
              if you answered NO to Q26, your application     comply with the mandatory requirements, required outcomes, and/ or performance requiremen
              may be subject to an information request and                .                                .    :           9
              processing of the application may be delayed.   as set out in the relevant part/s of the Wild Rivers Code?
                                                              [_] No                  L] Yes

                          2 The administering authority may be either the EPA, or if devolved or delegated, the local government, DPIF or NRW.
                                                                                               Page 14

Section 20

INTEGRATED PLANNING ACT 1997                                                                         :        IDAS Assessment Checklist, Version 20, 2 April 2007
                                     SECTION 3 —- BUILDING REFERRALS (completion not mandatory)
           Below is a list of the referrals that can apply to an application for building work assessable against the Building Regulation 2006. This section of the IDAS
          Assessment Checklist is provided for advice only.    This section of the IDAS Assessment Checklist is not required to be completed and lodged with an
          application for building work assessable against the Building Regulation 2006 only.
          Special fire services - generally          1.   An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work
          For more information go to schedute 2 table 1 and requires special fire services mentioned in schedule 2A part 1 of the Integrated Planning Regulation 1998
          schedute 2A of the |P Regulation.                (IP Regulation) or includes an alternative solution assessed against the performance requirements of the
          Assessment period 15 days. No responseis a       Building Code of Australia.
          deemed refusal.
          Fire safety for budget accommodation | 2.       An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work
          For more information go to schedule 2 of the IP the subject of the application requires the installation of a fire safety system for a budget accommodation
          Reautation                                      building.
          Spray painting                             3.   An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency
          For mare information go to schedule 2 of the IP if the application involves a workplace incorporating spray painting.
          Regulation
          Retail meat premises                       4.   An application may trigger referral to Safe Food Qld as a concurrence agency if the application involves a
          For more information go to schedute 2 of the IP retail meat premises.
          Regulation
          Private health facilities                  5.   An application may trigger referral to the Department of Health as a concurrence agency if the application
          Fos more information go to schedule 2 of the |P involves a private health facility.
          Regulation
 @        Workplace area less than 2.3m?             6.   An application may trigger referral to the Department of Industrial Relations (DIR) as an advice agency if the
          For more information go to schedule 2 of the IP application involves a work place area tess that 2.3m?.
         Regulation
          Land contiguous to a State-controlled      |7.  An application may trigger referral to the Department of Main Roads as a concurrence agency or advice
          road                                            agency if the application involves land contiguous to a State-controlied road.
          Far more information go to schedule 2 of the IP
         Regulation                                                                                                                                 :
          Pastoral workers accommodation             8.   An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency
          Far more information go to schedute 2 of the IP if the application involves pastoral workers accommodation.
          Regulation
          Child care centre                          9.   An application may trigger referral to the Department of Communities as a concurrence agency if the
          For more information go to schedule 2 of the 1P application involves a chitdcare centre.
          Regulation                                                                                                      .
          Coastal development                        10.  An application may trigger referral to the Environmental Protection Agency (EPA) as a concurrence agency
          For move information go to schedule 2 of the IP if the application involves land completely or parlly seaward of a coastal building line2?.
          Requiation
          Heritage                                   11,  An application may trigger referral to the Heritage Council as a concurrence agency if the application
          For more infarmation go to schedule 2 of the IP involves a heritage registered place.
          Regulation
          Fisheries matters                          12.  An application may trigger referral to the Department of Primary Industries and Fisheries (DPI&F) as a
          For mare information go to schedule 2 of the !P concurrence agency if the application involves assessable building work in a declared fish habitat area; or
         eegulelion                                       as an advice agency if the application involves assessable building work on land that adjoins a declared fish
@                                                         habitat area.
          Integration of land use and public         13.  An application may trigger referral to Queensland Transport as a concurrence agency if the application
          transport                   ;                   involves existing or future public transport corridors, or airport operational airspace”,
          For more information go to schedule 2 of the IP                                                                                                          :
          Regulation
          Railway safety and efficiency              14.  An application may trigger referral to Queensland Transport as a concurrence agency if the application
          For more information go to schedule 2 of the IP involves future railway land.
          Regulation
           NOTE: CONCURRENCE AGENCY ASSESSMENT PERIODS
          The local gavernmeni, as the concurrence agency, is required to assess and provide a response for the following building applications within a prescribed         .
          time. For applications relating to design and siting (17, 18 & 19), and building work for removal or rebuilding (23), the assessment period is § days. For all
          other applications the assessment period is 15 days. If no response is received from the local government for an application, it is taken to be a deemed
          refusal. However for amenity and aesthetics impact of particular building work for a single detached class 1a or class 10 building or structure (15}, no
          response is taken to be a deemed approval.                                                                         ,
         Amenity and aesthetic impact of             15.  An apptication wil trigger a referral to the local government if it is :
          particular building work for single             e   for a single detached class 1 building or class 10 structure; and
          detached class 4 buitding or class 10           e   the local government has declared by resolution the following:
          building or structure                               ~   the appearance of the building or structure will have an extremely adverse impact on the amenity of
          For more information go to schedule 2 table 1 of the    the locality; and
           Regulation.                     :                  ~   the appearance of the building or structure would be in extreme conflict with the character of the
         Assessment period 15 days. No response is a             locality
         deemed approval.                                                .

          22 Coastal building fines are prescribed under the Coastal Protection and Management Act 1995.
          73 Operational airspace is as defined in State Planning Policy 1/02 “Development in the Vicinity of Certain Airports and Aviation Facilities".
                                                                                           Page 15

Section 21

5

       INTEGRATED PLANNING ACT 1997                                                                                   IDAS Assessment Checklist, Version 20, 2 April 2007
       Whether particular buildings may be | 16.        An application to use an existing building thal is not class 1, 2, 3 or 4 for residential purposes may trigger a
       occupied for residential purposes                referral to the local government as the concurrence agency.
       For more information go to schedute 2 table 1 of the
       IP Regulation.
       Assessment period 15 days. No response is 3                                                       °
       deemed refusal.
       Design and siting                           17.  An apptication may trigger referral to the local government as the concurrence agency if the building work
       For more information go to schedule 2 table 4 of the does not comply with the performance criteria of parts 11 and 12 of the Queensland Development Code.
      IP Regulation.           ‘                   18.  An application may trigger referral to the local government as the concurrence agency if the building work
       Assessment period 5 days. No response is a       does not comply with the qualitative statement for building clearance and site cover.
       deemed refusal.                             19.  An application may trigger referral to the local government as the concurrence agency if the building work
                                                        does not comply with the qualitative statement for performance criteria 4, 5, 7, 8 or 9 of the Queensland
                                                        Development Code, part 11 or 12.
       Fire safety in particular budget            20.  An application may trigger referral to the local government as the concurrence agency to determine the
       accommodation buildings                          building will comply with the fire safety standard under the Building Act 1975 when the building work has
       For more information go to schedule 2 table 1 of the been completed.
       IP Regutation.
       Assessment period 15 days. No response is a                                                                                             -
       deemed refusal.
       Higher risk personal appearance             21.  An application may trigger referral to the local government as the concurrence agency to determine if the
      services                                        __ building work
       For more information go to schedule 2 table 1 of the e — complies with the performance criteria of the Queensland Development code part 15; and
       IP Requlation and the DC part 5.                 e     the work does not comply with an acceptable solution stated in the part.
.      Assessment period 15 days. No response is a
       deemed refusall.
       Building work for residential service | 22.      An application for building work for premises in which residential care service under the Residential
       For more information go to schedule 2 table 1 of the Services (Accreditation) Act 2002, section 4, is conducted, or is proposed to be conducted, will trigger
      IP Requlation and the QDC part 20.                referral to the local government as the concurrence agency.
       Assessment period 15 days. No response is a
       deemed refusal.
       Building work for removal or                23.  An application for the removal and/or rebuilding at another site of a building or other structure, will trigger
       rebuilding                                       referral to the local government as the concurrence agency.
       For more information go to schedule 2 table 1 of the
       IP Regutation.
       Assessment period 5 days. No response is a                                                                                                             ,
       deemed refusal.                                 :
       Building work for rainwater tank in         24.  An application may trigger referral to the local government as the concurrence agency to determine if the
       designated rainwater tank area                   building work or structure complies with the relevant performance criteria if -
       For more information go to schedule 2 table 1 of the e Under the Building Regulation 2006, a rainwater tank is proposed to be installed as part of relevant
      IP Regulation and the QDC part 25.                     building work, in a designated rainwater tank area; and
       Assessment period 15 days, No response is a       e   Under the Queensland Development Code, part 25, the rainwater tank does not include an acceptable
       deemed refusal                                        solution for a relevant performance criteria.

                                                     .                                    Page 16

Section 22

.  erm. - gut delle RTO ail plete er tlie AE EO IOTND PD oe . 1 a8          te 7a rete deren <i rll.      -_
       29/05/2003   92:35    +6175447b625,..               ALDO 2UZZA              ne            PAGE OL
           26/04/2087  11:39    98738551094                 ARTISAN             Swen             PAGE  @1/01
                             egg     ASC RTE. or                            us  doar kestietifar “uaeegtions 3,
                           ee                             BO. Box 345                   PO. Box 488-0000!
                                                          Noosaville Qld 4566           Everton Park Q1d'4053
                               “                          Phone: (07) 5442 4622        Phone: (07) 3855 1049
                   | {’       f ¢ ‘| nw                   Fox:   (07) $442 4506        Fax:   (07)°3855 1094
                                    ‘                     wow, theartisangroup.com.au                   :
               THE ART OF          LIVING                 Erasil: Itving(@cheattisangroup.com.au (- s

                      TO COUNCIL      bese Seat Knee

                      ATTENTION BUILDING DEPARTMENT
                                                            Rf
                      RE:   LOT      Bo                  SP,          ZAR ba3            wr.
                                          .                                            ar, +e) vrs we.
   @                        STREET      Ad Béede—         Serer                           wore
                            SUBURB.     Meret Wie xh?

                     We advise that a representative of Builder ‘Artisan-The art of living’ has been appainted by
                     us to sign or act on our behalf with regard to obtaining ali councll approvals of plans on the above
                     fita,

       |             OWNER'S NAME__/é         SE                  -
                     SIGNED _                Ju Z               __ (Owner)
                     OWNER’S NAME Jytmompeg. 2 Pm     NP
   @                 SIGNED    NN X Se     “pos, a              ‘ (Ownen
                     DATE LE        24 2 7
                     A division of
                     The Artisan Group Pty Ltd
                     ACN 068 826 611
                     QASA Regd. Bullder 79430

              4 diviston nf The Artisan Geoup Pr Lid. ABN 71 068 826 61 OBSA Regd. No 79430    fas: ig
      WES Paes: SEA                 aa eae con   Bi Seat nan   ST RON GSR ORIN ETL TA          Fe  Lem
      4 UBB ow md               dale       sana Sra      ae NE eee
       vont tar ant OU LS ge eRRs ak a eh y TAY.  SS La Aorta aes Rant OE GN        RR nh verre  ener) Sia

Section 23

a                              Sales Office                   Administration Office
                         Fe                            PO. Box 345                    PO. Box 488
                         ———                           Noosaville Qld 4566            Everton Park Qld 4053
                           a                           Phone: (07) 5442 4622          Phone: (07) 3855 1049
                 V7      f Ky 2) W                     Fax:    (07) 5442 4506         Fax:    (07) 3855 1094
                                :                      www. theartisangroup.com.au
          THE     ART    OF    LIVING                  Email: [email protected]

                 26" April 2007                                    |                  CELE
                 Land Use Department                                               [>> -~    . A
                 Noosa Shire Council                                             [oJ      REC EIVED
                 PO Box 141
                 Tewantin 4565                                                           2 7 APR 2007     a
                 Dear Sir/Madame,                                                  @          COUNCIL é/
                                                                                              OOSA

                 Re - Lot 5 Albert Street Noosaville                                     Peto
   @             Please find attached an application for a Material Change of Use Approval to raise the
                 level of the vacant land at lot 5 Albert Street Noosaville to conform to the required
                 finished floor level of 2.6 AHD.
                 We are seeking approval to place a retaining wall (800mm in height) to the two side and
                 rear boundaries of the property and infill the block to create a level building pad to AHD
                 2.35. The current level of the vacant block is 1.50 AHD.
                 Also the owners as they are elderly have asked to avoid the burden of any internal or
                 external stairs. The home has been designed taking their request into consideration.
                 Included are —
                               Cheque for fees ($575.00)
                               Part ‘A’
                               Part ‘D’
                               IDAS Assessment Checklist
   @                           Authority to sign on the owners behalf
                               Conceptual plan & elevations
                  If any further information is required please contact Noel Milne on 3855 1049.
                  Yours truly,
                  fo
                 Noel Milne

          A division of The Artisan Group Pty Ltd. ABN 71 068 826 611 QBSA Regd. No 79430
——                       CO     HN — rr                                                    es   Pe _
                                          er               Of Qoelky Gomes

Section 24

n    = ©)
                                                                                                                                                                =    os
                                                                                                                                                                oO   oe.
                                                                                                                                                                >   @R
                                                                                                                            800mm high retaining wall           3    >>
                                                                                                                                                                *    § &
                                                                                                                                                                230
                                                                                                                                                                2    Qn
                                                                                                                         feature walls                          &    3h
   800mm high retaining wall                      800mm high retaining wall                                                                                         -s
                                                                                                                                                                     é
                                            Za                                                                               eens                                    8
                                                                                                eee                                                                  $
                                                                                                                                                                     =
                                                                         eaeia                                                                                       .
                                                                  ri                                                     BBQ TERRACE
|                                                ca g                  ir   ‘      =             | :                   :                     |
                                                                         SI                           D              0        ——___—_       i
                                                                                        tviniche                                            ad
                                                         |                                                 {aatse upsiand       4  6 opt     sia               le
                                                                                                                                |
                                  POOL                                                                                     |      KITCHEN
                                  8m x 3.5m                 TERRACE               LIVING                   DINING              oh  ee                                         |
                          Ie                                                                                             {nage space                            .
                                                                                                                                  cooktop

|                                                          o                                                                                                    ;             |
                                                                                                                                 BATH           |
                                                                                                                    &       —           —_*+ |
|                                                                                                           FG                                 L U            le
                               a                         |                           me
                                                         4                                                            |           BED 3        FG}
                                    0                         oO              re                                      |                        Li]              |             |
                                                                                                                                                 |              e
                                                                                te                                          *                    =
                                                                                                           FG                               ;
                                              TERRACE                                                                            :
                                                                                                                                  CELLAR
                                                                                                 a        stone column
|                                                                                                 G                               -   =
                                              ES                          _                                                           hey J}
                                       .                    .                            slicting white glass panets f          LAUNDRY
                                                                                   ar            feature sticing panets
|                                L                                    i                          ENTRY                      coed          |                     (
                                               BED 1                      Va                                                      |       a                                   |
                              ROBE                                 a
|                                                                            BED 2
|                                                                                                                                                                             |
                                                    E                                       |
                                            E       :              :                                                        2
                                      ,                              —————                                                 GARAGE
                                    |r             | Cy LO)                 .   ENSUITE                                                                                       |
                                    ——                  =                 |                  —
                                                                          I Fc            O \L
                                                                                                ae:
 |                                                                                      St                                                                      |
                                                                                                          |                                          i          .
 |                                                                                         Pe                                                        i          |
 |                                                                                         ———                                                                  :             |

                                               ee
                                                                                   el        ie eee
                                                                                   [a

      of
      Be
 | | ga                                                                                                                                                                       |
      803
 mer
       ,o%
 | | Soe
      aero
      gzeo                                                                                                                                                                    |
       3339                        a                       ee        ee           ao               a                a           eg

Section 25

ARB.                                                        i.                                                      a
                                                                                                                               Ceiling  Ww    3200
  |                                        =         =                   = 4                               |                     2700
                                                                           $   es nes                                             Floor Level2.6AHD wy Building    ee
                 — ©       = © Gu   ¢ que  © cue  © qe   © ae   © cee ¢ oe    o                                    > ——                             -                   wy
                                                                              =<                                           NGL1.5AHD wy          0                 250
                                                                                                                                  -800
          1     West Elevation
          <4     1.2100

                                                                                                                                                     Parapet WwW
                                                                   ETT                                                                                 3200           Ceiling Ww
                                                  -    ao         ie                          =                                                                         2700
                                                                 <  4s  |                      —_— eee,
                              yeas pees         —                wo                           =                                                               Building Pad 2.35
                              Mire   LG, 5         4              ~                           Ed                        .      .          , Floor Level 2.6 AHD WwW     AHD    wv
                NK                        gee  PAGE       .  A         ee                                     S    sees     :   Z      : teense NGL 1.5 AHO "-250
                                                                                                                                                                   -800
                                                                                FILLED BUILDING PAD
                        RETAINING WALL 800mm HIGH                                                  FILLED AREA BATTERED TO
                        ON ENGINEERED FOOTINGS                                                     EXISTING ROAD (N.G.L)
         5    North Elevation
        com    14700,
|

   eee                                                   SS                                                                                                         ee

Section 26

BS          Neekewe we              Checklist - Applications Involving Land
                                           Development & Land Use Sections
                                           IDAS APPLICATION                                                       __
         This checklist should be used for any IDAS application. Please check each of the following items before accepting an
         application at the counter.
         1.    APPLICATION FORMS                      -                                       ‘
                1.1   Form 1 PartA
                      1.1.1 Ensure that the form is fully completed.                                                    [|
                      1.1.2 Inthe case of an MCU or Op Works below the high-water mark, owners consent is required.
                             1.1.2.1. If there are multiple owners, the consent of each owner is required.
                             1.1.2.2 — If the owner of the land is a company, either ACN No. or Company Seal required.
                1.2   Form’ Part B-O Supporting Information
                      1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached. (7{
                             1.1.2.1  Ensure that each of Forms B-O which are attached are fully completed.           [A
         2.     REFERRAL INFORMATION                      ,          .
@               2.1.  Ensure that items 1-23 have been checked and/or completed with regard to referrals.               Ea
         3.     ENVIRONMENTALLY RELEVANT ACTIVITIES                         .       .             _
                3.1   Ensure that Part G is completed if EPA referral is required.
                3.2.  Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
                      fee is paid and recorded on the application.
         4.  _  FORM 2 - REQUEST TO CHANGE APPROVAL                          .                                    .           ,
                4.1.  Ensure that items 1-28 have been checked and/or completed including information regarding
                      applicant details and owners consent.
         5.     PLANS       —        mo                                                          -      .         .
                5.4   Ensure that at least 6 sets of the Plan of Development (5 for Reconfiguration and Operational!    va
                      Works) accompanies the application. In addition ensure that each set is complete.
                5.2   Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is
                      unbound.
         6..   SUPPORTING INFORMATION                 ~~~       7                                      eT
                6.1   Ensure that at least 6 copies of any report accompanies the application (5 for Reconfiguration  [7
                      and Operational Works). If the application is accompanied by a covering letter, ensure that it is
                      capable of reproduction.
©               6.2   In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound.
         TO FEE
                7.1.  Ensure that the application fee, as determined from the Council's adopted scale of fees,
                      accompanies the application or has been paid.
                7.2   Ensure that the fee which has been paid is recorded on the application form.                       mH
          Receiving Officer cL              tt       tag                  Date... MIO Qe
                                             é

          Having completed this form and accepted the apptication, please deliver both to the following IDAS Application Receiving
         trays:-
          ¢   If the application is for a Material Change of Use exclusively -AOP1’s desk in the Land Use Section.
          ¢   Ifthe application is for an Materlal Change of Use & Reconfiguration - AOP1’s desk in the Land Use Section.
          e — (f the application is for Operational Works (for parking, access, sewerage or drainage) exclusively - AOD2 in the
              Land Development Section.
          «   Inall other circumstances - AOP1's desk in the Land Use Section.
          Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.

          SEP! g;\ant\Vorms\application checklist.doc

Section 27

ax            NOOSA                            LAND USE SECTION FEES
                                                        .        |              RECEIPT TYPE
 SALE OF DOCUMENTS
           Superseded Planning Scheme Documentation                                   520             ;
           Copy of Permit/Approval Letter                                             110
           The Noosa Plan Documentation                                               111
 APPLICATION FEES                                   .
           Material Change of Use - Code/Impact
                 Consistent                                          S75              521
                 Inconsistent                                                         521
          Assessment under Superseded Planning Scheme                                 521
           Modification to a Development Permit                                       521
           Extension of a Currency Period                                             521
           Operational Works - Landscaping                                            §21        .
  @        Bldg Work assessable against the Planning Scheme                           521
 PRE LODGEMENT REVIEW       —
           Half Hour                                                                  522,
           One Hour                                                                   §22
 ADVERTISING
           Purchase Advertised Applications                                           §23
 JETTIES
          Jetty Application Fee                                                       524
         ' Jetty Bond                                                                  51
                                                                                  (Category 4)
 BONDS                                 ,
           Performance Bond             :                                          ;   51
                                                                           ;      (Category 9)
 SIGNS
          Registration Fee        ,                                                   222
 s@eyree                           |
          Search of Land Use Section file                                             112
          Liquor Licensing Request                                                    113              oo

         |                                               TOTAL.   $        IS                           |

 NAME:          WWehbuted              Pfr
 ADDRESS:          </~—     lo
                         Orecrann           Parm             os   3
 FILENO:      | O7/    763                     DATE:     2/x57o
 RECEIPT NO:       DeHI1..                     Signature of TP Officer: “°S   S, .2,    &
AUTHORITY NO:                                                                            A,

                          12 [2D—9/ 763/ |                                                      |

Section 28

.                           CALCULATION OF FEES

                  APPLICATION                 FEE               TOTAL
                                                                FEES
  MCU - CODE ASSESSMENT
  Details of Development

  Consistent 1.0
  Inconsistent 3.0

. IFEE CALCULATION

  MCU - IMPACT ASSESSMENT                                                          ©
  Detaiis of Development

  Consistent 1.0
  Inconsistent 3.0

  FEE CALCULATION

  OPERATIONAL WORKS
  Details of Development

  FEE CALCULATION                                                                  @

  TOTAL FEES                                                    $

Used in these records

About this file

File size
2.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0014EDD8.001.pdf · 2.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.