.           INTEGRATED PLANNING ACT 1997.                                                                                   IDAS Assessment Checklist, Version 20, 2 April 2007
.              Works that take overland flow water         |12. Does the application involve works that take overland flow water in a HPA or an FMA?
           .   The relevant wild river deciaration will state
               works that take overtand flow water are either     | NO                 C] YES (ensure you have completed Past Ks of Form 1)
               seff assessable of assessable, or are exempt
               from wild river requirements.               13.  If YES, is the application for works stated in the relevant wild river declaration to be?
               If you ticked Q13 i), your application must be        .
               assessed by NRW against the Wild Rivers Code    C) i) assessable works                     .
               and must comply with the code.                   [1] ii) self-assessable works
               if you ticked Q13 i) an application is not required   .
               to be made however the works must comply with    C iii) exempt works                           .
               the refevant self-assessable section of the Wild
               Rivers Code, otherwise the works become
               assessable development for which an application
               is required and must be assessed by NRW
 .             against the relevant part of the Wild Rivers Code
               and must comply with the code.                                .
               If you ticked Q13 iii) your application is not
               subject to wild river requirements.
               Applications for development that is other than
               that stated to be assessable, sel-assessable or
               exempt will not be accepted.
               Works that interfere with overland         14.   Does the application involve works that interfere with overland flow water in a FMA?
               flow water
               The relevant wild river declaration will state   O     0                 OC      S fensure you have co pleted Part   Ko of Form 1)
                                                                     N                       YES     (ensure you h    mpleted Part Kio of Form 1
               works that interfere with overland flow water that
               are either self assessable, assessable or exempt} 15. If YES, is the application for works stated in the relevant wild rivers declaration to be?
     ©         from wild river requirements,                    Oo   .         bi        k
               {f you Ucked Q15 i), your application must be        i) ASSESSADIE WOIKS
              assessed by NRW against the Wild Rivers Code      [_] ii) self-assessable works
              and must comply with the code.                         .
               If you ticked Q15 ii) an application is not required LJ iii) exempt works
              to be made however the works must comply with                    .                                          .
              the relevant self-assessable section of the Wild
              Rivers Code, otherwise the works become
              assessable development for which an application
              is required and must be assessed by NRW
              against the relevant part of the Wild Rivers Code
              and must comply with the code.
              'f you ticked Q15 iii) your application is not
              Subject to wild river requirements.
              Applications for development that is other than                                                                                ,
              that stated to be assessable, self-assessable or
              exempt will not be accepted.
              Waterway barrier works                      16.   Does the application involve building or raising waterway barrier works in a PA?
              Applications for building or raising waterway                                       .
              barrier works in a HPA will not be accepted.      CJ NO                  CL] YES (ensure you have completed Part Oz of Form 1)
              if you answered YES to Q16, your application
              must be assessed by OPIF against the Wild
              Rivers Code and must comply with the code.
     ©        Aquaculture (non ERA)                       17.  Does the application involve aquaculture in a PA?
              aoe        for aquaculture in a HPA will not be  C] NO                    Cc] YES {ensure you have completed Part O; of Form 1)
              Ifyou answered YES to Q17, your application
              must be assessed by DPIF against the Wild
              Rivers Code and must comply with the code,                                       ,
              Works that interfere with water ina      | 18.   Does the application involve operational works that interfere with water in a watercourse that is in
             watercourse                                       a nominated waterway in a PA?
              Note: If the development is proposed in a HPA,
              applications for all works that interfere with water CJ NO                LE] YES (ensure you have completed the relevant Part K of Form 1)
           .  ina watercourse (including dams or weirs,              :
              stream realignment or stream diversion) will not 19. IFYES
              be accepted,                                            ,
              in a PA, applications for instream dams and      [J i) The application is for an instream dam or weir; or
              weirs may be accepted in nominated waterways.         +            opin                  .                  .           .          :                        .
               you ticked box in 19, your application wit      L_] ii) The application is for operational works that interfere with water in a watercourse, and is
              not be accepted.                                         for development other than a dam or weir,                                 .
              Note: Operational works outside a HPA or
              nominated waterway are not subject to wild
              river requirements.
              More information and locations of nominated
              waterways is available by contact NRW,
              accessing the department's website
              www.nrw.ald.gov.ay or contacting the       .
              department by email on:                                                                           .
            wild [email protected]!d.qov.au,                                                                                                              ‘

                                                                                                Page 13

Used in these records

About this file

File size
2.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0014EDD8.001.pdf · 2.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.