Council archive · source document
0014EDD8.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007
State-controfled road matters 2. The application involves: (tick applicable box/es)
For more information refer to Guide 3, (1 (i) development on land contiguous* to a State controlled road and for -
Unless you answered ‘none of the above" to Q2, . . .
the application triggers referral to the Department () (a) material change of use assessable against the planning scheme;
f Main R MR ! . an
. of Main Roads (DMR) as a referral agency. — (7 (b) reconfiguring a lot unless -
In certain circumstances DMR will be an advice . : .
agency, while in other circumstances OMR will « the total number of lots is not increased; and
be a concurrence agency. « the total number of lots abutting the State-controlled road is not increased;
peredule 2 the F Reaulation wih assis you to 1) (c) operational work (not associated with a material change of use assessable against the
concurrence agency for the application. planning scheme or reconfiguring a lof mentioned in (b) above)-
* associated with access to a State-controlled road; or
« for filling or excavation; or
« involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
J (ii) development on land not contiguous to a State-controlled road and -
L) (a) material change of use -
« assessable against the local government's planning scheme; and
* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
, that schedule;
[_] (b) reconfiguring a fot for a purpose mentioned in schedule 5 of the IP regulation
~ and exceeding the thresholds set by that schedule;
LJ (c) operational work (not associated with a material change of use assessable aoeinst QD
planning scheme or reconfiguring a lot mentioned in (b) above)-
e assessable against the local government's planning scheme; and
. * mentioned in schedule 5 of the 1P Regulation and exceeding the thresholds set by
that schedule. .
(iit) none of the above
Clearing vegetation 3. The application involves: (tick applicable box/es)
For more information refer to Guide 12. ‘a (i) material ch ange of use —-
Unless you answered “none of the above" to Q3, , . .
the application requires assessment by the (a) assessable against the planning scheme;
Department of Natural Resources and Water ining —
(NRW), _(b) ona lot containing |
if an agency other than NRW is the assessment . * acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
. Manager for the application, NRW is a “ « ifthere is no property map of assessable vegetation for the lot - remnant vegetation;
ae enge caeney forthe appicaton in relation (c) where the existing use of the land is a rural or environmental use; and ~
H you ticked 03) or (i, your application requires {d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
referral to NRW for assessment regardless of C (ii) reconfiguring a lot -
whether vegetation clearing is proposed or not. _.
. (a) on alot containing a category 1, 2 or 3 area shown on a property map of
assessable vegetation or, if there is no property map of assessable vegetation fo
the lot, remnant vegetation; @
(b) where the size of the lot before the reconfiguration is 2 hectares or larger;
(c) where 2 or more lots are created; and
(d} where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
CJ (iii) operational work -
; {a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
{b) not associated with a material change of use assessable against the planning
scheme mentioned in {i) or reconfiguring a lot mentioned in (ii) - complete Part J of
Form 7
(iv) none of the above.
Strategic port land 4. The application involves:
I red ihe, a 0 ee hat vist [1 (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (TI
you ticked (i) - the relevant Port Authority is the
assessment manager for the application. Act) - complete Part | of Form 1
If you ticked (ii) Queensland Transport is a (1 (ii) a material change of use that is inconsistent with the land use plan approved under the
concurrence agency for the application. ’ Tl Act for the strategic port land - complete Part | of Form 1
I (iii) none of the above
- 4 Land contiguous to a State-controlled road is defined in schedule 14 of the (P Regulation to mean land - if part of the land is within 100m of the State-contralled road; or thal is part of a future State-
controlled road.
Page 2See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0014EDD8.001.pdfRelated documentPublic source context ↗
07/0763 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.