Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

0014EDD8.001

of 28

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Text sections not matched to the original PDF pages. See original document to check page numbers.

INTEGRATED PLANNING ACT 1997                                                                                   IDAS Assessment Checklist, Version 20, 2 Aprit 2007
           Operational work that is tidal work or      |9.  The application involves operational work that is: ( tick the applicable box/es)
           work in coastal management district             LJ (i)    tidal work’ as defined under the Coastal Protection and Management Act 1995 (the
           For more information refer to Guide 18. For                                   .             .     .                                   :
           more information about prescribed tidal work in           Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; Of
           local government tidal areas refer to Guide 24. [ (ii)    tidal work-that is prescribed tidal work" other than in a canal'2 -complete Part P of Form 1; OF
           Unless you answered “none of the above” to Q9,        ves      .         wae                                sae
          the application requires assessment by the       (J (iii)  carried out within a coastal management district under the Coastal Act and for — complete
   :       Environmental Protection Agency (EPA).                    Part M of Form 1 if any box/es (a) to (i) below are ticked,
           fan agency other than EPA sme assessment                  (J (a)    constructing or installing works in a watercourse between MHWS and HAT (ie.
           manager for  ine applicavon, sa                                                             7                                                       .            -
           concurrence agency for the application in                           other than those works in tidal water) where the development has been determined not
           relation to this matter.                                            to be assessable against the Water Act 2000:
           Local goverment is the assessment manager                 ([] (b)   constructing a canal12 intended to be connected to tidat waters;
           for all prescribed tidal work.                                                .          eo
                                                                     [J] {c)   constructing an artificial waterway;
                                                                     (1 {d)    reclaiming land under tidal water;
                                  .                                  [J {e)    disposing of dredge spoil or other solid waste material in tidal water;
                                                                     [J (f) _ interfering with quarry material on State coastal land above high-water mark;
                                                                     [J {g)    draining or allowing drainage or flow of water or other matter across State
                                                                               coastal land above high-water mark;
                                                                     [J (h)    removing or interfering with coastal dunes on land, other than State coastal land,
                                                                               that is in an erosion prone area and above high-water mark;
                                                                     [-] {i}   constructing a bank or bund wall to establish a ponded pasture on land, other
                                                                               than State coastal land, above high-water mark; or                                    ©
                                                                (iv) none of the above.                                            .
           Operational work below high water        | 10.   The application involves operational work that is: (tick the applicable box/es}
           mak      =                                        (71 (i) tidal work"? as defined under the Coastal Protection and Management Act 1995 (the
           For more information refer to Guide 18. For                                   :             .     .
           more information about prescribed tidal work in           Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or
           local goverment tidal areas refer to Guide 24.    [J (ii) tidal work that is prescribed tidal work" - complete Part P of Form 1; Of
           Unless you answered “none of the above” to             ves    .         wa                                voge
           Q10, the application triggers referral to         [1 (iii) carried out within a coastal management district'S under the Coastal Act and for -
.          Queensland Transport (QT) (Maritime Safety                           ;     ;                   ;              i               ial in ti         _
           Oki) es aconcurrence agency.                              [-} (a)   disposing of dredge spoil or other solid waste material in tidal water - complete Part
                           .                                                   M of Form 7;
           Local government is the assessment manager                                  .                 .
           for all prescribed tidal work.                            [-] (b)   reclaiming tand under tidal water - complete Part M of Form 1; OF
                                                                     [J {c)    constructing a canal12, if the canal is associated with reconfiguring a lot -
                                                                               complete Part M of Form 1;        ‘
                                                             fin       none of the above.
           Coastal management                          11.  The application involves: (tick the applicable box/es)
           For more information refer to Guide 18.          [1 (i)     a material change of use assessable under a planning scheme involving operational
           Unless you answered “none of the above" to                  work carried out completely or partly in a coastal management district!5
           Q11, the application requires assessment by the       ;              .                                                 .                    .       oo
           Environmentat Protection Agency (EPA).           [J (ii)    a material change of use assessable under a planning scheme involving building
          If an agency other than EPA is the assessment                work, carried out completely or partly in a coastal management district that is —
           manager for the   application, EPA is a                                     .                  :      .
           concurrence ageney for the application in                   + the construction of a new premises with a GFA'® of at least 1000m?
           relation to this matter.                                    e the enlargement of the GFA of existing premises by more than 1000m2
                                                            [1] (iii)  reconfiguring a fot assessable under schedule 8 of the IPA where the land is situated
                                                                       completely or partly in a coastal management district
                                                            [1] (iv)   reconfiguring a lot’? assessable under schedule 8 of the IPA and in connection with
                                        .                              the construction of a canal12 - complete Part M of Form 1
                                                                 (v)   none of the above

          40 Tidal work is defined in sch 10 of the IPA.
          11 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
          12 Canal means canal as defined under the Coastal Protection and Management Act 1995
          13 Tidal work is defined in sch 10 of the IPA.
          14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a loca! government tidal area.
          15 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a
             coasta! management district under section 47(2} of that Act.
          16 GFA is defined in sch 14 of the IPA to mean the gross floor area. For a definition of how to calculated GFA, go to the planning scheme against which the application is being assessed.
          17 Under s#17 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, musi be
             accompanied by the application for the operational works to construct the artificiat waterway.
                                                                                             Page 4

Used in these records

About this file

File size
2.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0014EDD8.001.pdf · 2.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.