Original source · versioned page text
Landscape plans
Plans and drawings: the text below has words only, no drawings.
Original PDF page 2, section 1. The text section number identifies this passage in the reader.
SPECIFICATION NOTES TURF AREAS
· EXCAVATE TURF AREAS TO A DEPTH OF 150MM, CULTIVATE SUBGRADE TO A DEPTH OF 150MM AND TREAT AS PER
NOTE:THIS LANDSCAPE PLAN MUST BE READ IN CONJUNCTION WITH THE APPROPRIATE STATUTORY APPROVALS,
SOILS TESTING RESULTS.
SUNSHINE COAST COUNCIL REQUIREMENTS AND RELEVANT AUSTRALIAN STANDARDS. · INSTALL 150MM OF AMELIORATED SITE TOPSOIL.
THIS INCLUDES BUT IS NOT LIMITED TO: · FINISHED TURF GRADES/CONTOURS TO BE GENERALLY SMOOTH, COORDINATE ON SITE WITH SUPERINTENDENT
AS3640 WORKPLACE ATMOSPHERES - DUST AND ENSURE LEVELS ARE APPROVED PRIOR TO TURFING.
AS4373 PRUNING OF AMENITY TREES · TURF LAID ON LOW SIDE OF HARD SURFACES SHALL BE 20MM BELOW ADJACENT HARD SURFACE TO NOT IMPEDE
AS4454 COMPOSTS, SOIL CONDITIONS & MULCHES STORM WATER FLOW.
· SUPPLY AND LAY TURF AS INDICATED ON THE DRAWINGS.
· WATER TURF IN WELL DURING ESTABLISHMENT.
GENERAL SUNSHINE COAST
· FOR MORE DETAIL REFER TO THE PROJECT ARCHITECT'S AND ENGINEER'S DRAWINGS. · APPLY WATER TO MAINTAIN SOIL MOISTURE UNTIL ESTABLISHED DURING MAINTENANCE PERIOD TO MAINTAIN
VIBRANT GREEN TURF COLOUR AND HEALTH. Level 1, 24 Duporth Avenue
· PLANTING SHOWN REFLECTS THE DESIGN INTENT, EXACT NUMBERS AND LOCATIONS WILL REQUIRE CONFIRMATION Maroochydore QLD 4558
GRADES T + 61 7 5499 6188
ON SITE BY THE SUPERINTENDENT. ANY CHANGES TO BE MADE TO THE LANDSCAPE PLAN MUST BE APPROVED BY
· SITE SHALL BE POSITIVELY DRAINED, I.E. NO PONDING AREAS, 2% MINIMUM TO PITS OR LEGALLY SHEET FLOWING
THE LANDSCAPE ARCHITECT AND SUPERINTENDENT.
OFF-SITE.
· ALL LANDSCAPE PLANS PRESENTED ASSUME THAT ALL BASE AND SURVEY INFORMATION IS ACCURATE AND TO · MULCHED GARDEN BED AREAS SHOULD NOT EXCEED A 1:3 GRADE AND TURF AREAS SHOULD NOT EXCEED A 1:4
© Place Design Group Pty Ltd A.C.N. 082 370 063
SCALE. THE CONTRACTOR SHALL CHECK LANDSCAPE PLANS PRESENTED FOR ANY DISCREPANCIES WITH THE GRADE.
EXISTING SITE CONDITIONS OR OTHER DRAWINGS PRESENTED PRIOR TO ANY CONSTRUCTION WORK TAKING PLACE. · FINAL GRADE EXISTING TOP 100MM AND TRIM TO +/-10MM TO ACHIEVE PLAN LEVELS. All information displayed, transmitted or carried within this drawing is
protected by Copyright and Intellectual Property laws.
IF DISCREPANCIES DO OCCUR THESE SHALL BE HIGHLIGHTED AT ONCE TO THE SUPERINTENDENT PRIOR TO ANY The information contained in this document is confidential.
CONSTRUCTION WORK TAKING PLACE. DIMENSIONS TAKE PRECEDENCE. MAINTENANCE TASKS Recipients of this document are prohibited from disclosing the information
herein to any person without the written consent of Place Design Group.
· LANDSCAPE CONSTRUCTION CONTRACTOR TO MAINTAIN WHOLE OF LANDSCAPE WORKS FOR ESTABLISHMENT Annotated dimensions take precedence over any measures of scale.
THE CONTRACTOR SHALL: PERIOD OF 13 WEEKS AND HAND OVER TO OWNER ONCE COMPLETED. Verify all dimensions on site prior to construction.
This drawing may display with permission a combination of specialist and
· INSTALL SILT CONTROL AND VEGETATION PROTECTION FENCING AS REQUIRED. · THE FOLLOWING TASKS ARE TO BE ACTIONED DURING ESTABLISHMENT AND IN PERPETUITY; other consultant(s) input and linework.
Nominated specialist and consultant information contained within this
· REMOVE ALL UNWANTED MATERIAL FROM LANDSCAPE WORK AREA. document is referenced from their supplied documentation and is
· CONFIRM ALL DIMENSIONS ON SITE PRIOR TO CONSTRUCTION. IRRIGATION AND WATERING contained in this document as indicative only and not for construction or
· SEEK INSTRUCTION FROM SUPERINTENDENT WHERE LEVEL DISCREPANCIES, SPECIFICATION SUBSTITUTIONS AND · EVERY DAY FOR THE FIRST TWO WEEKS (UNLESS IT RAINS ADEQUATELY) certification purposes.
POOR SOIL STRUCTURE OCCURS. · EVERY 2-3 DAYS DURING THE BALANCE OF THE ESTABLISHMENT PERIOD OR AS NEEDED IF HOT AND DRY (UNLESS IT
RAINS ADEQUATELY). PROJECT
SERVICES · ONCE A WEEK THERE AFTER.
· THE CONTRACTOR SHALL CONFIRM THE LOCATION OF ALL SERVICES WITH RELEVANT AUTHORITIES PRIOR TO
PLANTING AND EXCAVATION. TURF MOWING LOT 1 TAYLOR CT, COOROY
· FIRST MOW - ONCE AFTER 10 DAYS IF THERE IS RAPID GROWTH OR 14 DAYS AFTER INSTALLATION.
DRAINAGE · MOWING THEREAFTER - ONCE A WEEK DURING SUMMER, ONCE EVERY TWO WEEKS IN SPRING AND AUTUMN,
· ENSURE DRAINAGE WORKS CORRELATE WITH ADJACENT LAND AND SPECIFIED FINISHED LEVELS. AND ONCE A MONTH IN WINTER OR AS REQUIRED IF THERE IS A LOT OF GROWTH OR AS DESIRED. CLIENT
· INSTALL FIELD INLETS TO MANUFACTURER'S RECOMMENDATIONS AT LOCATIONS AND LEVELS INDICATED ON
PLANS. FINISH SURFACE PIT LEVEL FLUSH WITH ADJACENT FINISHED SURFACE LEVELS. ENSURE POSITIVE OVERLAND TURF TRIMMING
DRAINAGE FLOW TO ALL PITS AND THAT NO PONDING OCCURS AROUND THE PIT. ALIGN ALL PITS SQUARE WITH TO · AS REQUIRED. MAINTAIN 5MM GAP BETWEEN TURF AND HARD SURFACES. BULLGATE PTY LTD
PATHS, PAVEMENT PATTERNS, KERBS, WALLS AND ALIKE.
IF REQUIRED: TURF AERATION AND TOPDRESSING
· INSTALL CONTINUOUS SUB-SURFACE DRAINAGE SYSTEM TO LOCATIONS AND LEVELS AS INDICATED ON PLANS. · AS REQUIRED - TYPICAL TIMING IS END OF OCTOBER (SPRING) AND END OF FEBRUARY (AUTUMN). NOTES
SUB-SOIL DRAINS SHALL INCORPORATE A TRENCH WITH A GEOTEXTILE LINING, DRAINAGE GRAVEL BACKFILL · AERATE 100MM DEEP, 50MM O.C. WITH 16MM TINE (CORER).
ALL MEMBER SIZES, CONNECTIONS, FOOTINGS ETC
MATERIAL AND A 100MM SLOTTED AG-PIPE TO THE FOLLOWING SPECIFICATION; · COLLECT PLUGS AND DISPOSE ENSURING THEY DO NOT GET REINCORPORATED INTO HOLES. TOPDRESS WITH TURF ARE TO BE CONFIRMED BY AN ENGINEER. SIZES
- GEOTEXTILE MATERIAL: GEOTEXTILE MATERIAL SHALL BE A NON-WOVEN TYPE TOPSOIL NOMINATED IN FINISHES SCHEDULE - BRUSH TOPSOIL IN WITH BROOM. NOMINATED ARE INDICATIVE OF FINAL APPEARANCE
AND SHALL HAVE A STRENGTH RATING (G) OF GREATER THAN 900 REQUIRED. CONTRACTOR IS TO PROVIDE SHOP
- BACKFILL MATERIAL: 20MM DRAINAGE AGGREGATE IN ACCORDANCE WITH ADDITIONAL MAINTENANCE TASKS DRAWINGS FOR APPROVAL BEFORE COMMENCING
AS 2758 - 1988. · WEED REMOVAL AND WICK WIPING: AS REQUIRED TO REDUCE COMPETITION AND SEEDING. CONSTRUCTION.
- DRAINAGE PIPES: 100MM Ø SLOTTED AG-PIPES SHALL COMPLY WITH · PLANT REPLACEMENT: IMMEDIATELY REPLACE PLANTS THAT DIE OR FAIL TO THRIVE, ARE DAMAGED OR STOLEN,
ALL WATER PROOF MEMBRANES, HYDRAULIC
AS 2439-PART 1 "PERFORATED DRAINAGE PIPE AND ASSOCIATED FITTINGS". WITH PLANTS OF THE SAME SPECIES AND OF SIMILAR SIZE AND QUALITY UNLESS OTHERWISE SPECIFIED. FITTINGS, ELECTRICAL / LIGHTING FITTINGS AND
PERFORATIONS SHALL NOT EXCEED 0.7MM IN DIAMETER OR WIDTH. · STAKES AND GUYS: ADJUST AND/OR REPLACE STAKES AND TIES WHERE REQUIRED. REMOVE STAKING AND GUYING REINFORCED CONCRETE STRUCTURES ETC TO
WHEN INSTRUCTED BY THE SUPERINTENDENT. ENGINEERS, ARCHITECTS, HYDRAULIC ENGINEERS,
· RE-MULCHING: AS REQUIRED TO MAINTAIN A CONSISTENT DEPTH, 100MM SETTLED, UNTIL PLANTS ARE ELECTRICAL ENGINEERS DETAILS AND
TOPSOIL SPECIFICATIONS.
· COLLECT TOPSOIL SAMPLE(S) AND HAVE IT TESTED BY A NATA CERTIFIED LAB FOR HORTICULTURAL SUITABILITY, I.E. ESTABLISHED. SIZES NOMINATED ARE INDICATIVE OF FINAL
PLANTING TREES AND TURF. FURNISH TEST RESULTS TO LANDSCAPE ARCHITECT. · TRIM / PRUNE PLANTS TO REMOVE DEAD, DYING AND DISEASED GROWTH AND FOR CHARACTER AND FORM AS APPEARANCE REQUIRED
· CULTIVATE GARDEN AND TURF AREAS 150MM DEEP. REQUIRED.
· AMELIORATE SUBGRADE AND SITE TOPSOILS PER TESTING RESULTS. · ENSURE PRUNING OF TREES TO DEVELOP ONE MAIN TRUNK & LOWER BRANCHES ARE REMOVED TO ALLOW SIGHT
· INSTALL AMELIORATED SITE TOPSOILS OR APPROVED IMPORTED TOPSOIL THAT COMPLIES WITH MRTS 16 (MAIN LINES FOR VEHICLES.
ROADS TECHNICAL SPECIFICATION) TO PLANTING AREAS IF AMELIORATED SITE TOPSOIL IS NOT AVAILABLE.
· ALL SOIL STOCKPILES ARE TO BE MAINTAINED TO CONTROL WEEDS ROUTINELY AND GUARD AGAINST DISPERSION MONITORING: PROVIDE A MONTHLY REPORT ON COMPLETED TASKS.
BY WIND OR WATER. STOCKPILES SHALL BE LIMITED TO A MAXIMUM HEIGHT OF 2M AND MAY REQUIRE COVERING
OR RETAINING. STOCKPILES ARE NOT PERMITTED WITHIN CLOSE PROXIMITY TO RESIDENTIAL PROPERTIES. CERTIFICATIONS
· GENERALLY SOIL TO BE USED SHALL COMPLY WITH THE FOLLOWING SPECIFICATION; · PROVIDE AS2013:2105, TOPSOIL, MULCH, AND TURF CERTIFICATIONS TO SUPERINTENDENT AND LANDSCAPE
(1) FRIABLE AND FREE DRAINING SANDY LOAM ARCHITECT PRIOR TO PRACTICAL COMPLETION.
(2) GOOD TEXTURE AND STRUCTURE FOR SELECTED USE
(3) ACCEPTABLE CONDUCTIVITY AND PH LEVELS FOR SPECIFIED PLANTS DELIVERABLES
· WARRANTIES
CONCRETE
· REFER TO FINISHES SCHEDULE AND ENGINEER'S AND ARCHITECT'S PLANS RESPECTIVELY. SOURCES ISSUE CODE ISSUE DESCRIPTION BY CHK DATE
· SURVEY - PROVIDED TO US BY BARLOW SHELLEY CONSULTING ENGINEER 01 CA FOR OPERATIONAL WORKS VS JB 24.08.2020
· CIVIL ENGINEERING - BARLOW SHELLEY CONSULTING ENGINEERS
EDGING
· PROVIDE SPRAY EDGE TO ALL INDIVIDUAL AND GROUPED STREET TREES AND GARDENS. REFER MATERIAL SCHEDULE
AND DETAIL.
MULCH
· ALL MULCH PROPOSED TO BE USED ON SITE SHALL BE FREE OF DELETERIOUS MATERIALS AND FOREIGN MATTER
INCLUDING ANTHROPOGENIC WASTE, ROCK, SOIL, SEDIMENT CONTAMINATION, WEEDS AND STICKS.
· MULCH GARDEN AREAS 100MM DEEP SETTLED, KEEPING 50MM CLEAR OF PLANT STEMS, TO ENSURE SITE WATER
CONSERVATION REQUIREMENTS ARE ACHIEVED.
GENERAL PLANTING
· PLANT STOCK IS TO BE APPROVED BY CONTRACTOR AND QUALIFIED ARBORIST PRIOR TO ACCEPTANCE OF DELIVERY.
· FOR PLANTING, EXCAVATE GARDEN AREAS TO A DEPTH OF 300MM, CULTIVATE SUBGRADE TO A DEPTH OF 150MM
AND TREAT AS PER SOILS TESTING RESULTS.
· INSTALL AMELIORATED SITE TOPSOIL OR SPECIFIED TOPSOIL 300MM DEEP, SETTLED, AND MULCH AS SPECIFIED.
· NO SYNTHETIC, GRANULAR BLENDED FERTILISERS TO BE USED ON SITE. SLOW RELEASE ORGANIC TREE TABLETS
SHALL BE USED AT ESTABLISHMENT.
· ALL PLANTINGS SHALL INCORPORATE THE INCLUSION OF A SLOW RELEASE NATIVE PLANT FERTILIZER (AS PER PRE - Preliminary | CA - Council Approval | T - Tender | CON - Construction
MANUFACTURERS SPECIFICATION) AND THE USE OF A SOIL MOISTURE RETENTION ADDITIVE (AS PER
MANUFACTURERS SPECIFICATION), PLACED ADJACENT THE PLANT ROOT BALL AT THE TIME OF PLANTING. DRAWING TITLE
· TREES >25 LITRE BAGS ARE TO BE CERTIFIED BY A QUALIFIED ARBORIST AS AS2013:2105 COMPLIANT PRIOR TO
DELIVERY TO SITE. QUALIFIED ARBORIST TO SELECT AS2013:2105 COMPLIANT TREES AT NURSERY AND CHECK ON GENERAL
DELIVERY TO SITE. FURNISH CERTIFICATION TO SUPERINTENDENT AND LANDSCAPE ARCHITECT PRIOR TO PRACTICAL
COMPLETION. SPECIFICATION
· DO NOT INSTALL TREES WITHIN:
- 1M OF UNDERGROUND SERVICES
- 1.5 OF SEWERS, HORIZONTALLY AND VERTICALLY DESIGN : JB NORTH
- 3M OF DRIVEWAY CROSSOVERS DOCUMENT : VS
- 4M OF STREET LIGHTS AND POWER POLES
PROJECT : 2020057
- 5M OF BUS STOPS - DEPARTURE SIDE
- 15M OF BUS STOPS - ARRIVAL SIDE
· WHERE DIFFERENT GROUNDCOVERS ARE PLANTED IN MASSES, TRIANGULARLY SPACE THEM EQUIDISTANT PER
SPECIES AND PLANT THEM IN ODD NUMBERED GROUPS OF 5, 7, AND 9 PER SPECIES
DRAWING NUMBER REVISION
2020057-LS-001 01
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.