Skip to the record
Search everything, all in one place.

Original source · versioned page text

C&T_Letter_TempAccomm_SWtreatment

of 1

Page text shows just the words. Original shows the document exactly as it was published.

Callaghan & Toth Consulting Engineers Pty Ltd
Callaghan & Toth Consulting Engineers Pty Ltd
ABN No. 45140292324
ACN No. 140292324
1.16/90
6/41
P.O
P.OBox
        Goodchap
     Sunshine
     Box2035
              BeachStreet
         2305Noosa
               NoosaHeads
                          Noosaville
                    Road Noosa
                           4567
                       Heads
                                     4566
                                Junction
                             4567
                                                                                                           Callaghan & Toth
www.callaghanandtoth.com.au
www.callaghanandtoth.com.au                                                             Civil, Environmental & Hydraulic Engineers
Ph:
Ph:07
    0754749081
       5474 9081FaxE:07 54749041
                      [email protected]

             th
          25 August 2021                                                                                                        File No.: 1714 OPW



          Peter Middap
          Carramar (Noosacare Inc)


          Dear Peter,

          RE:                    Stormwater Treatment Assessment for proposed Temporary Staff
                                 Accommodation at Carramar Submission for Preparation of OPW Design Plans
                                 associated with Interlot Drainage Through No.18 Carramar Street

          Noosa Care Inc. have proposed to locate two Temporary Dongas as emergency staff accommodation at
          the end of the new western carpark located on Lot 19 RP162486.

          The proposed units will be about 7.2m x 3.6m each and the rooves of each unit will be attached to a
          rainwater tank.

          Callaghan and Toth ran the existing development MUSIC model with the addition of the new temporary
          accommodation buildings plus a 5000 litre rainwater tank, and the stormwater quality targets are
          achievable, as required by the State Planning Policy 2017 (Appendix 2: Table B).

          If you require any further information please contact me on 5474 9081.

          Yours faithfully,
          Callaghan & Toth




          Jane Davissen BE (Env)
          Senior Environmental Engineer




          Please view www.callaghanandtoth.com.au for all information on our company profile and terms and conditions for services rendered




          X:\JOBS\CT Projects in progress\1714 Carramar final stage\Correspondence\IWMP\C&T_Letter_TempAccomm_SWtreatment.doc
Log in to download the original file

C&T_Letter_TempAccomm_SWtreatment.pdf · 28 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.