Original source · versioned page text
Information Response
Looking North Looking East
• A minimum lot size of 1000m2 in Pomona is suitable where a lot can be connected to water and
sewer.
Provide advice from Unity Water that connection to water and particularly sewer is supported. If
connection to sewer is not achievable, the proposed reconfiguration will not be possible.
Attached is the letter from the Engineers (Ferg & Roeds) who are certifiers for Unitywater and confirm that the
sewer and water are supported.
• Council is concerned on how stormwater will be managed, namely on proposed lot 4.
The subject property slopes to the northwest, where the rainwater receiving environment are
residential properties. The increase of hardstand on proposed lot 4 will create an increase, in both
volume and velocity, of stormwater running onto the neighbouring properties.
No new development can create a worsening of existing drainage conditions both on the subject
property and the downstream environment.
Information Required
Provide a Stormwater Management Plan for the proposed development. The management plan
must include but not be limited to:
a. Details and location of proposed stormwater discharge outlets;
b. Be consistent with the site specific geotechnical report recommendations;
c. Demonstrate that the runoff from the site is suitably controlled to ensure that the downstream
environment is not adversely affected or destabilised;
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.