Council archive · source document
Attachment 4 - Terrestrial Ecology Report_RACV_2022 June · MCU22/0118
Very large file (20.5 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 114, section 1. The text section number identifies this passage in the reader.
Reconfiguring a lot Table 8.2.2.3 - Criteria for assessable development (part)
Performance outcomes Acceptable outcomes Project Outcome
Reconfiguring a lot
PO2 AO2 N/A - Not for a lot reconfiguration
New lots are only created Where clearing vegetation for the purpose of Reconfiguring a Lot:
if they maintain ecological
linkages and minimise the 1. new boundaries to lots do not transect and fragment existing native
clearing of vegetation. vegetation;
2. new lots are created to allow for suitable building envelopes for future
buildings and works to be located within existing cleared areas or areas of low
ecological value;
3. building envelopes are designated for each lot; and
4. ecological linkages and ecologically important areas are secured by
environmental covenant or transferred to public ownership or through
gazettal of a nature reserve.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 4 - Terrestrial Ecology Report_RACV_2022 June.pdfRelated documentApplication case desk ↗
About this file
- File size
- 20.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.