Council archive · source document
Attachment 4 - Terrestrial Ecology Report_RACV_2022 June · MCU22/0118
Very large file (20.5 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 120, section 1. The text section number identifies this passage in the reader.
Rehabilitation of ecologically important areas Table 8.2.2.3 - Criteria for assessable development (part)
Performance outcomes Acceptable outcomes Project Outcomes
Rehabilitation of ecologically important areas
PO10 AO10.1 1. As described previously, the subject land is to be
Development provides for ecologically Landscaping and rehabilitation complements and supports ecologically rehabilitated and landscaped between the villas and
important areas to be restored and enhanced important areas by: balance areas once construction is completed. Native
through:
understorey (and midstory) is absent, and the canopy
1. utilising local native species; (and groundcover) is dominated/infested with the
1. designing landscaped areas to 2. utilising suitable plant species identified in PSP2 Landscaping; creeping vine. Removal/control of this vine will generate a
complement and enhance existing 3. restoring degraded ecosystems to achieve a functional
significant ecological improvement. Landscaping and
vegetation and ecological linkages; ecosystem state that requires minimal human intervention;
2. removing species likely to displace 4. replicating adjacent remnant habitats of the same type, including rehabilitation would be expected to use locally native
native flora species or degrade fauna the understorey vegetation; species suitable to the site-specific conditions (and not
habitat; 5. creating or enhancing linkages between existing habitats; compromise bushfire concerns). A detailed
3. replanting and rehabilitating 6. avoiding the use of pest plant species listed in PSP2 - landscaping/rehabilitation plan would be expected as part
degraded habitat; Landscaping; of the development approval conditions.
4. replacing any vegetation removed 7. planting riparian zones to filter stormwater run-off, stabilise soil
with suitable local native species; and provide for wildlife habitat; and 2. It is expected that the planting of native species on the
5. providing for fauna habitat; and 8. providing ground and arboreal structures for fauna, which may project site will far exceed the number of trees removed.
6. avoiding the planting of pest plant include ground depressions, rocks, hollows, nesting boxes and in-
Creating a native understorey is a significant benefit,
species. stream habitat.
because there currently is none and the land is infested
with non-native and highly invasive species (refer also
AO10.2
Arborist Consult report regarding the frangipani vine).
Vegetation cleared is replaced with:
1. plantings of equivalent area that replicate the floristic structure
of the vegetation removed; or
2. where this is not possible due to the characteristics of the site
and the development, plantings twice the number of the
removed trees and plants.
Editor’s Note — Revegetation and rehabilitation works are to be carried out in
accordance with an approved Revegetation and Rehabilitation Management Plan, as
referred to in PSP3 Ecological assessment guidelines.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 4 - Terrestrial Ecology Report_RACV_2022 June.pdfRelated documentApplication case desk ↗
About this file
- File size
- 20.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.