MCU15/0031 & OPW15/0057 - Decision Notice

of 1

Text shows just the words. Original shows the document exactly as it was published.

Officer:	Jack Lewis
Direct Telephone:	07 53296236
Our Reference:	MCU15/0031
Your Reference:	N/a

15 June 2015

Gateway Noosa P/L Tte
C/- RG Strategic
PO Box 1363
NOOSA HEADS  QLD  4567

Dear Sir

Decision Notice
Sustainable Planning Act 2009
I refer to your application and advise that on 12 June 2015, Council decided to approve the application in full subject to conditions.
Details of the decision are as follows:
application details
Application No:	MCU15/0031 & OPW15/0057
Street Address:	32 Gateway Drive Noosaville  QLD  4566
Real Property Description:	Lot 11 SP 170295
Planning Scheme:	The Noosa Plan (16 September 2013)
Decision details
The following type of approval has been issued:
Development Permit for Material Change of Use of Premises - Industrial Business Type 2 - Production, alteration, repackaging and repairing (Cabinet making business)
Development Permit for Operational Works
Relevant period of approval
The relevant period for this development approval is 4 years starting the day that this development approval takes effect.
The relevant period for the Development Permit for Operational Works is 2 years starting the day that this development approval takes effect

assessment manager conditions
Material Change of Use – Industrial Business Type 2 – Production, alteration, repackaging and repairing (Cabinet making business)
PLANNING
When Conditions must be Complied With
Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to the use commencing, and then compliance maintained at all times while the use continues.
Approved Plans
Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions.
Plan No.	Rev.	Plan/Document Name	Date
100.0	E	Proposed Site Plan drawn by di henshall interior design	25/05/2015
100.1	E	Proposed Ground Floor Plan ~ Uses drawn by di henshall interior design	25/05/2015
100.2	E	Proposed Upper Floor Plan ~ Uses drawn by di henshall interior design	25/05/2015
200.0		Elevations drawn by di henshall interior design	09/05/2015
Development authorised by this approval must be undertaken generally in accordance with the Approved Plans listed within this Decision Notice.
Amenity
The development must not create detrimental impacts on the amenity of the area due to the creation of excessive noise, odour nuisance or other emissions.
Nature and Extent of Approved Use
Any display and retail sale of goods must remain an ancillary component to the approved use and must not exceed 20%.
Building Design
The development must be finished with subdued external building colours.
Any fencing to the road frontage must be set back at least 1 metre from the street boundary, and must have a minimum average setback of 2 metres to the street boundary. All land between the fence and the front property boundary must be densely landscaped.
All air conditioning units or other mechanical equipment must be fully enclosed or screened such that they are not visible from the street frontages.
Building Height
The maximum height of the development must not exceed 10 metres above the finished ground level and the natural ground level.
Performance Bond
Security in the form of a cash bond or trading bank guarantee to the sum of $10,000 must be submitted to Council, to secure performance of all conditions of this approval, prior to the issue of a Development Permit for Building Works or the Operational Works prestart meeting (whichever is the sooner). The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. Council reserves the right to call upon the bond or guaranteed sum to effect compliance with conditions.
Water & Sewer Connections
An underground connection to reticulated water and sewerage must be provided to the development site in accordance with the standards and requirements of Northern SEQ Distributor–Retailer Authority (Unitywater).
A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority (Unitywater) must be submitted to Council that certifies an underground connection to reticulated water and sewerage has been provided to the development site.
Landscaping
All landscape works must be maintained generally in accordance with the approved design for the life of the development.
All landscape works must be established and maintained in accordance with the approved design for the life of the development, and in a manner that ensures healthy, sustained and vigorous plant growth.  All plant material must be allowed to grow to full form and be refurbished when its life expectancy is reached.
Waste
The developer must provide waste storage and disposal facilities in accordance with Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings and Commercial and Industrial Premises”, including an external imperviously paved area correctly sized for all refuse and recycling containers and suitably screened from public places and neighbouring properties. A bin wash area is required with a cold-water tap, hose and drain outlet connected to sewer, via a bucket trap. The drain outlet is to be designed to prevent storm water entry to the sewerage system and this can be achieved with a nib wall 50mm high and up to 700mm x 700mm wide (max 0.5m²). The bin wash area shall be located outside of the approved landscape areas.
All bins shall be stored within the building and only be placed out for collection within the driveway areas on the day of pickup.
The development must allow refuse-loading areas to be located off street.  All vehicles associated with the collection of waste/recyclables, shall enter and leave the site in a forward direction.
ENGINEERING
External Works
Gateway Drive must be upgraded for the full length of the frontage to the subject site. The works must include in particular:
construction of a pedestrian footpath in accordance with the conditions of this Decision Notice.
removal of any redundant property accesses, stormwater outlets and reinstatement of the kerb, footpath and verge area to match the balance of the site frontage, including the provision of topsoil and turf where the existing verge is grassed.
removal of any redundant vegetation.
This condition is imposed pursuant to s665 of the Sustainable Planning Act 2009 being non-trunk infrastructure.
Site Access and Driveways
Sealed access driveways must be provided from Gateway Drive to all parking and manoeuvring areas of the development. The works must include in particular driveway crossovers in accordance with IPWEAQ standard drawing SEQ R-051.
The southern driveway must be constructed, sign posted and linemarked as an “entry” and “exit” driveway.
The northern driveway may be constructed as an “entry” and “exit” driveway provided that suitable sight lines as described in AS/NZS2890.1:2004 can be achieved to the north. Prior to the construction of the northern driveway plans prepared by an RPEQ demonstrating the sight lines must be submitted to Council for approval. The applicant must undertake any necessary clearing of vegetation in the Gateway Drive road reserve at their cost.
Car Parking
A minimum of 17 car parking spaces must be provided on the site.  The works must include in particular:
4 visitor parking spaces within the total, which are clearly marked for that purpose and accessible at all times for visitor use.
crossfalls, gradients and dimensions in accordance with Australian Standard AS2890: Parking Facilities.
Pedestrian and Bicycle Facilities
Pedestrian and bicycle facilities must be provided for the development.  The works must include in particular a 2.0 metre wide concrete footpath within the road verge for the entire length of the site’s frontage to Gateway Drive. The path must join smoothly with any existing path and the final alignment must be determined on-site in conjunction with Council’s Engineering Officer.
This condition is imposed pursuant to s665 of the Sustainable Planning Act 2009 being non-trunk infrastructure.
Stormwater Drainage
The site must be provided with a stormwater drainage system connecting to a lawful point of discharge.  The works must include in particular:
collection and discharge of stormwater to Council’s drainage system in Gateway Drive
the use of gravity stormwater drainage.
Easements
Unless otherwise agreed in writing by the relevant service provider, any public or third party infrastructure located on the subject site must be placed within an easement registered against the title of the property.
All easements must be designed in accordance with the planning scheme and granted at no cost to the Grantee.  Where the Grantee is Council or a service authority, the easement documentation must be in accordance with the Grantee’s standard easement terms.  Draft easement documentation must be submitted to Council for endorsement.
All works must be kept clear of any existing or proposed easements on the subject land, unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
All fill and associated batters must be contained entirely within the subject site unless written permission from the respective landowner(s) is provided to Council.  All earthworks must be undertaken in accordance with the provisions of Australian Standard AS3798: Guidelines on Earthworks for Commercial and Residential Developments.
Where the development involves excavation or filling over, or adjacent to, drainage, water supply or sewerage infrastructure, all access chamber surface levels must be adjusted to provide a freeboard of 100mm above the finished ground surface level.
Development of the site must not cause additional ponding of stormwater on any adjoining property or discharge or direct runoff onto any adjoining property.
Damage to Services and Assets
Any damage caused to existing services and assets as a result of the development works must be repaired at no cost to the asset owner at the following times:
where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or
where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval.
Development Permit for Operational Works
Approved Plans
Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions.

Plan No.	Rev.	Plan/Document Name	Date
25107-SW1	C	Site Stormwater Management prepared by SCG Consulting	29 May 2015
25107-SW2	B	Site Stormwater Management prepared by SCG Consulting	29 May 2015
25107-OW1	A	Operational Works prepared by SCG Consulting	22 May 2015
25107-OW2	A	Operational Works prepared by SCG Consulting	22 May 2015
25107-C1		Driveway Levels prepared by SCG Consulting	May 2015
ED15142OPW 01 – 1 of 3	C	OPW Landscape Plans drawn by Element design	25/05/2015
ED15142OPW 01 – 2 of 3	C	Landscape Documentation drawn by Element design	25/05/2015
ED15142OPW 01 – 3 of 3	C	Landscape Documentation drawn by Element design	25/05/2015
Prior to Commencement of Works
Council must be contacted at least 5 working days prior to any works commencing to organise a prestart.  The contact number to arrange a pre-start meeting is 5329 6244. The pre-start meeting must include the relevant parties for the following aspects of the works:
Civil engineering works;
Erosion and sediment control works
A Construction Management Plan must be submitted to Council prior to the pre-start meeting and must specifically address the following:
Traffic Management during all aspects of the construct phase including:
A Traffic Management Control Plan in accordance with Manual of Uniform Traffic Control Devices (MUTCD) detailing all temporary signage and traffic control measures prior to construction
Maintenance of safe pedestrian access across the frontage of the site both during daily construction and after daily construction has ceased
Proposed fencing to the site during the construction phase of the development
Adequate parking arrangements for construction workers
Maintenance and protection of water quality and existing drainage lines through the construction site through the implementation of appropriate erosion and sediment control measures
Works programme identifying key components of the works and their respective durations
Establishment of a communication protocol with the general public, adjoining owners, emergency services and local businesses to advise of agreed construction times, impacts on traffic and services and other relevant issues
Any conflict between the development and an existing or proposed service must be referred to the relevant service authority for determination prior to commencement of works.
Design Amendments - Bioretention Basins
Bioretention basins must be surrounded by 1:4 batters that provide for even drainage of water from surrounding surfaces into the filter media. Batters must be suitably stabilised with rocks of a diameter deemed suitable by the supervising RPEQ.

A 100mm transition layer of 2mm coarse grained sand must be installed between the base of the filter media and the upper surface of the drainage layer.

Extended detention depth between the surface of the filter media and the overflow elevation must be 200mm.

Underdrainage pipes must include cleanout points in accordance with the Construction and Establishment Guidelines: Swales, Bioretention Systems and Wetlands (Water by Design, 2009).
During Construction
The developer must meet any costs to repair damage to any Council asset during construction, where damage is a result of the development works. Damage to assets must be repaired immediately where it creates a hazard to the community. In circumstances where the damage does not create a hazard to the community, it must be repaired immediately on completion of the works associated with the development. A condition report including photographs of the frontage of the site should be completed and submitted to Council at the prestart meeting.
All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ) who is independent of the Developer and Principal Contractor, and they must certify that all works conform to the Operational Works permit. Where municipal works are involved, such confirmation must be submitted for the respective hold points prior to any site inspection by Council Officers.
All works must be constructed and work procedure undertaken in accordance with:
The approved plans/documents and conditions detailed in this Decision Notice
All relevant Noosa Council Planning Scheme Policies, standard drawings, standard specifications and guidelines
The latest version of the Healthy Waterways document “Water Sensitive Urban Design Technical Design Guidelines for South East Queensland” for all water quality devices to be constructed on site
Bioretention Basins - Construction
During construction and establishment of the bioretention devices, the site RPEQ must certify that the device was constructed in accordance with Construction and Establishment Guidelines: Swales, Bioretention Systems and Wetlands (Water by Design, 2009) and that the forms contained in section 3.15 of the guidelines, including the associated supporting information and data, are completed.  These forms and certification must be submitted to council prior to commencement of use.

A construction hold point with a council delegate must be established once the bioretention device underdrainage pipe work is installed.  At the time of inspection, a sample of the drainage layer, transition layer, and filtration media materials must be stockpiled onsite accompanied by laboratory results that demonstrate that the media complies with the specifications contained in the latest version of the Guidelines for Soil Filter Media in Bioretention Systems (Facility for Advancing Water Biofiltration).  The drainage layer, transition layer, and filtration media materials shall not be installed until the catchment draining to the bioretention device has 70% groundcover as determined by council’s delegate.

Where the bioretention filter media interfaces with stormwater pits and retaining walls, nonwoven geotextile shall be fixed to the pit/retaining wall and extend 300mm out into the filter media generally in accordance with IPWEAQ Standard Drawing WSUD-001 to prevent tunnelling of water along the interface.
Bioretention Basins - Landscaping
Landscape plans must include a mixture of at least five of the following species for planting in the bioretention basin surface at a minimum density of 8 plants/m2:
Carex appressa.
Carex fascicularis.
Ficinia nodosa.
Juncus usitatis.
Lomandra longifolia.
Ghania sieberiana.

Where landscaping/garden beds are proposed adjacent to the bioretention basin, a 900mm deep root barrier must be installed to the interface between the landscape/garden area and the bioretention basin.
Landscaping
Landscaping must be located in a position that will not adversely affect Council infrastructure or access. Landscape works must not interfere with vehicle and pedestrian sight distances.

All landscaping to be planted and maintained in accordance with Planning Scheme Policy 3 – Landscaping Plants and Guidelines.

Grassed areas must be:
rolled, top dressed and joined smoothly with adjoining surfaces.
of species sustainable for local and design conditions and do not require irrigation.
free of disease, pest, weeds, rock and debris.
New street tree planting must:
meet NATSPEC Guidelines: Specifying Trees requirements for quality.
be pruned in accordance with AS 4373, Pruning of Amenity Trees.
be of the approved plan species.
be pest and disease free.

Prior to felling or pruning, all trees are to be checked for wildlife. If wildlife is present, the tree must not be felled or pruned until the wildlife has left the tree.

Vegetation removal or pruning must be undertaken in an environmentally sensitive manner to avoid damaging surrounding vegetation, trees and habitat.  Removed vegetation is to be processed by one of the following methods:
Processing through a wood-chipper.
Disposed of in a council approved refuse tip.
Used for landscaping purposes.
Works Within Road Reserve/Reinstatement
Safe pedestrian access on all streets in the vicinity of the development must be maintained at all times. Should footpath/road closures be necessary to carry out construction works, Council’s Engineering Officer must be notified prior to the proposed closure and all requirements complied with.

All frontage works must match neatly with existing road and verge/footpath features. Additional works beyond the frontage may be required to provide an acceptable transition to existing road and verge/footpath profiles.
Pathways
All pathways must be constructed in accordance with the following requirements:
All footpath/cycleway must comply with Council’s Standard Drawing SEQ R-065.
All paths must have a slip resistant surface
Expansion and contraction joints must provide a flush finish. Installation of joints by saw cutting is preferred to ensure a smooth ride for cyclists
The required work includes any modifications to ensure the footpath finishes flush with all existing service covers and the like, or alternatively these services are raised or altered, so as not to create a pedestrian safety hazard

Pathways must:
terminate in a manner that ensures smooth transition to existing surfaces for public safety
be designed and constructed to comply with the Disability Discrimination Act (DDA), Access to Premises Standard, Austroads and relevant sections of AS1428 Design for access and mobility
Site Access and Driveways
Any existing unnecessary or redundant property accesses must be removed, and the kerb, footpath and verge area reinstated to match the existing footpath and/or verge treatments. Grassed verge areas to be reinstated must be provided with 100 mm topsoil and grass seed or turf, and must be maintained by the developer until established.

The following must be complied with during the construction of the required crossovers/driveways:
The driveway must be constructed so as not to concentrate stormwater runoff onto neighbouring properties or cause ponding of water within the road reserve
Earthworks
The finished surface levels of the site must be graded and shaped to ensure that all surface runoff is directed to the proposed drainage system and Gateway Drive and not directed on to any adjoining property.

All earthworks shall be undertaken in accordance with the provisions of AS 3798 Guidelines on Earthworks for Commercial and Residential Development. Certification  must be provided by an RPEQ and submitted to Council the issue of the Certificate of Classification for the building.
Service Conduits under Existing Road Features
Electrical conduits or other services proposed to be installed under existing sealed carriageways, concrete pathways or concrete/sealed driveways must be installed by boring. Trenching is not permitted, unless specifically approved by Council.
Erosion and Sediment Control
E&SC measures must be installed and maintained to ensure any waters discharged from the earthworks site up to and including a 85%ile 5 day rain event (or 46mm rainfall event) contain less than 50mg Total Suspended Solids per litre. All reasonable and practical measures must be installed to minimise the amount of sediment leaving the site in rainfall events that exceed 85%ile 5 day or 46mm. Please refer to Advisory Notes for the minimum reasonable and practical measures to minimise the amount of sediment leaving the site.
Any temporary drainage works to manage stormwater flows during the construction phase of development must be designed by the supervising RPEQ to convey a 1 in 2-year ARI event without resulting in visible scour within flow paths.
A construction hold point with Council’s delegated erosion and sediment control officer must be established prior to commencement of each stage of earthworks. The hold point must be held as soon as reasonably practical following initial tree clearing and/or removal of soil stabilising material for each stage. At the hold point inspection, all drains and bunds required to divert waters away from disturbed soil as well as sediment basins and/or sediment control measures to remove sediment from runoff on disturbed areas must be installed. All areas that will not require earthworks in the imminent cut to fill operation must be stabilised to prevent entrainment of sediments into receiving waters. Earthworks must not commence until after the Council’s delegated erosion and sediment control officer has provided written confirmation that this condition has been completed.
Prior to the completion of the development, and prior to forecast rain events exceeding the capacity of sediment removal measures (i.e. sediment basins), all exposed soils surfaces must be effectively stabilised and protected from soil loss to receiving waters. For the purpose of this condition, an effectively stabilised surface is defined as one that does not, or is not likely to result in visible evidence of soil loss caused by sheet, rill or gully erosion or lead to sedimentation, or lead to water contamination.
Public roads and kerb and channels must be kept free of prescribed water contaminants including dirt, mud, sand, silt soil and clay.
Supervision/Certification
Upon completion of the work a certificate must be issued by an RPEQ certifying that the works have been constructed in accordance with the Operational Works permit.
All municipal works must be accepted ‘On Maintenance’ by Council in accordance with Council’s relevant Planning Scheme Policy prior to the commencement of the use. To achieve ‘On Maintenance’, the supervising RPEQ must submit to council:
certification that all works have been undertaken and completed in accordance with the requirements of this Permit
As Constructed details in accordance with Council’s Planning Scheme Policy
Maintenance and operational manuals for all proprietary devices

Following Construction - As Constructed Plans
Prior to acceptance of civil works to become Council assets “On Maintenance”, the lodgement of satisfactory “As Constructed” records must be submitted to Council. The “As Constructed” information must include:
Drawings and data certified by a qualified experienced Civil Engineer (RPEQ) for design intent, and certified by a Licensed Surveyor in regard to the cadastre and the location, level and type of all services and structures.
The data must be in accordance with Council’s (Noosa Plan) – Planning Scheme Policy 5 – Engineering Design Standards – Roads, Drainage and Earthworks, and fully detail levels for all engineering works including but not limited to drainage structures, finished ground levels and pavement surface levels.
The data must be submitted in hardcopy form and digital format (Asset Design and As Constructed (ADAC)) in GDA94 Zone 56 coordinate values. Guidelines on the use of ADAC are available at www.adac.com.au
Bioretention Basins - Maintenance
Prior to issuing of a final compliance certificate, the Community Management Statement for the development must be provided to Council and include a requirement for ongoing maintenance of the bioretention basins.
The bioretention basins must be maintained in accordance with the Maintaining Vegetated Stormwater Assets, Version 1 (Water by Design, 2009). Records of all maintenance activities undertaken must be kept and made available to council upon request.
referral agencies
Not Applicable.
Advisory notes
The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions:
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Unit on 07 3247 6212 to discuss any obligations under the ACH Act.
Equitable Access and Facilities
The plans for the proposed building work have NOT been assessed for compliance with the requirements of the National Construction Code - Building Code of Australia (Volume 1) as they relate to people with disabilities.  Your attention is also directed to the fact that in addition to the requirements of the National Construction Code as they relate to people with disabilities, one or more of the following may impact on the proposed building work:
the Disability Discrimination Act 1992 (Commonwealth);
the Anti-Discrimination Act 1991 (Queensland); and
the Disability (Access to Premises – Buildings) Standards.
Development Compliance Inspection
Prior to the commencement of the use, please contact Council's Development Audit & Response Unit to arrange a Development Compliance Inspection.
Infrastructure Charges
This Development Permit will trigger an “Infrastructure Charge Notice” to be issued in accordance with Council’s “Adopted Infrastructure Charges Resolution” under the State Planning Regulatory Provision (Adopted Charges) and the Sustainable Planning Act 2009.
property notes
Not Applicable
preliminary approval overriding planning scheme
Not Applicable
further development permits required
Development Permit for Building Work
self assessable codes
The following codes for self-assessable development related to the development approval issued under this Decision Notice must be complied with.
Advertising Devices Code
submissions
Not Applicable
reasons/grounds for approval
Not Applicable
RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Sustainable Planning Act 2009 is attached.
During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice” may be given. Taking this step will defer your appeal period, which will commence again from the start the day after you receive a “negotiated decision notice”. (Refer to Part 8 “Dealing with decision notices and approvals” - Division 1 “Changing decision notices and approvals during applicant’s appeal period” of the Sustainable Planning Act 2009.)
OTHER DETAILS
If you wish to obtain more information about Council’s decision, electronic copies are available on line at www.noosa.qld.gov.au, or at Council Offices.
Yours faithfully

Jack Lewis
Development Planner

cc	Unitywater

Enc:	Adopted Infrastructure Charge Notice
Approved Plans/Documents
Appeal Rights

	Appeal Rights SUSTAINABLE PLANNING ACT 2009 & SUSTAINABLE PLANNING REGULATION 2009

The following is an extract from the Sustainable Planning Act 2009  (Chapter 7).
MATERIAL CHANGE OF USE, RECONFIGURING A LOT & OPERATIONAL WORKS

Division 8 	Appeals to court relating to development applications and approvals

461 	Appeals by applicants
(1) 	An applicant for a development application may appeal to the court against any of the following—
(a) 	the refusal, or the refusal in part, of the development application;
(b) 	any condition of a development approval, another matter stated in a development approval and the identification or inclusion of a code under section 242;
(c) 	the decision to give a preliminary approval when a development permit was applied for;
(d) 	the length of a period mentioned in section 341;
(e) 	a deemed refusal of the development application.
(2) 	An appeal under subsection (1)(a), (b), (c) or (d) must be started within 20 business days (the applicant’s appeal period) after—
(a) 	if a decision notice or negotiated decision notice is given—the day the decision notice or negotiated decision notice is given to the applicant; or
(b) 	otherwise—the day a decision notice was required to be given to the applicant.
(3) 	An appeal under subsection (1)(e) may be started at any time after the last day a decision on the matter should have been made.

462 	Appeals by submitters—general
(1) 	A submitter for a development application may appeal to the court only against—
(a) 	the part of the approval relating to the assessment manager’s decision about any part of the application requiring impact assessment under section 314; or
(b) 	the part of the approval relating to the assessment manager’s decision under section 327.
(2) 	To the extent an appeal may be made under subsection (1), the appeal may be against 1 or more of the following—
(a) 	the giving of a development approval;
(b) 	any provision of the approval including—
(i) 	a condition of, or lack of condition for, the approval; or
(ii) 	the length of a period mentioned in section 341 for the approval.
(3) 	However, a submitter may not appeal if the submitter—
(a) 	withdraws the submission before the application is decided; or
(b) 	has given the assessment manager a notice under section 339(1)(b)(ii).
(4) 	The appeal must be started within 20 business days (the submitter’s appeal period) after the decision notice or negotiated decision notice is given to the submitter.

463 	Additional and extended appeal rights for submitters for particular development applications
(1) 	This section applies to a development application to which chapter 9, part 7 applies.
(2) 	A submitter of a properly made submission for the application may appeal to the court about a referral agency’s response made by a prescribed concurrence agency for the application.
(3) 	However, the submitter may only appeal against a referral agency’s response to the extent it relates to—
(a) 	if the prescribed concurrence agency is the chief executive (environment)—development for an aquacultural ERA; or
(b) 	if the prescribed concurrence agency is the chief executive (fisheries)—development that is—
(i) 	a material change of use of premises for aquaculture; or
(ii) 	operational work that is the removal, damage or destruction of a marine plant.
(4) 	Despite section 462(1), the submitter may appeal against the following matters for the application even if the matters relate to code assessment—
(a) 	a decision about a matter mentioned in section 462(2) if it is a decision of the chief executive (fisheries);
(b) 	a referral agency’s response mentioned in subsection (2).

464 	Appeals by advice agency submitters
(1) 	Subsection (2) applies if an advice agency, in its response for an application, told the assessment manager to treat the response as a properly made submission.
(2) 	The advice agency may, within the limits of its jurisdiction, appeal to the court about—
(a) 	any part of the approval relating to the assessment manager’s decision about any part of the application requiring impact assessment under section 314; or
(b) 	any part of the approval relating to the assessment manager’s decision under section 327.
(3) 	The appeal must be started within 20 business days after the day the decision notice or negotiated decision notice is given to the advice agency as a submitter.
(4) 	However, if the advice agency has given the assessment manager a notice under section 339(1)(b)(ii), the advice agency may not appeal the decision.

465 	Appeals about decisions relating to extensions for approvals
(1) 	For a development approval given for a development application, a person to whom a notice is given under section 389, other than a notice for a decision under section 386(2), may appeal to the court against the decision in the notice.
(2) 	The appeal must be started within 20 business days after the day the notice of the decision is given to the person.
(3) 	Also, a person who has made a request under section 383 may appeal to the court against a deemed refusal of the request.
(4)	An appeal under subsection (3) may be started at any time after the last day the decision on the matter should have been made.

466 	Appeals about decisions relating to permissible changes
(1) 	For a development approval given for a development application, the following persons may appeal to the court against a decision on a request to make a permissible change to the approval—
(a) 	if the responsible entity for making the change is the assessment manager for the application—
(i) 	the person who made the request; or
(ii) 	an entity that gave a notice under section 373 or a pre-request response notice about the request;
(b) 	if the responsible entity for making the change is a concurrence agency for the application—the person who made the request.
(2) 	The appeal must be started within 20 business days after the day the person is given notice of the decision on the request under section 376.
(3) 	Also, a person who has made a request under section 369 may appeal to the court against a deemed refusal of the request.
(4)	An appeal under subsection (3) may be started at any time after the last day the decision on the matter should have been made.

467 	Appeals about changing or cancelling conditions imposed by assessment manager or concurrence agency
(1) 	A person to whom a notice under section 378(9)(b) giving a decision to change or cancel a condition of a development approval has been given may appeal to the court against the decision in the notice.
(2) 	The appeal must be started within 20 business days after the day the notice of the decision is given to the person.

[word/footer1.xml]
Page 15 of 15

[word/footer2.xml]
PO Box 141		P. (07) 5329 6500	[email protected]	
	TEWANTIN  QLD  4565	F. (07) 5329 6501	www.noosa.qld.gov.au
				Page 1 of 15

[word/header1.xml]
MCU15/0031

[Attachment: image4.png (image text)]
 
 
 

 
 
 

a
mm

  

NOOSA
COUNCIL

Used in these records

About this file

File size
114 KB (small file)
File type
DOCX

No other editions are linked here.

Original file

Log in to download the original file

MCU15_0031 & OPW15_0057 - Decision Notice.docx · 114 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.