Original source · versioned page text
Decision Notice - Approved by Delegation of Authority MCU22 0048
Officer: Lisa Pienaar Direct Telephone: 07 53296514 Our Reference: MCU22/0048 & OPW22/0089 Your Reference: 21280 24 November 2022 Noosa River Enterprises Pty Ltd Jetty 222 Gympie Tce NOOSAVILLE QLD 4566 [email protected] Dear Sir/Madam, Decision Notice Planning Act 2016 I refer to your application and advise that on 17 November 2022, Council decided to approve the application subject to conditions. Details of the decision are as follows: APPLICATION details Application No: MCU22/0048 & OPW22/0089 Street address: Jetty 222 Gympie Tce Noosaville Qld 4566 Real property description: Lot 160 CP 908649 Planning Scheme: Noosa Plan 2020 (25 September 2020) Decision details The following type of approval has been issued: Development Permit for Material Change of Use of Premises – Landing – Commercial Development Permit for Operational Works – Jetty and Pontoon currency period of approval The Currency Period for this development approval is stated in the conditions below. assessment manager conditions PLANNING When Conditions must be Complied With Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to the use commencing, and then compliance maintained at all times while the use continues. Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date 34680-01 0 Cover Page, prepared by The Jetty Specialist 2/11/2021 34680-02 A Existing Structures Plan, prepared by The Jetty Specialist 13/10/2021 34680-03 A Existing Structures Plan, prepared by The Jetty Specialist 13/10/2021 34680-04 A New Site Plan, prepared by The Jetty Specialist 13/10/2021 34680-05 D Vessel Mooring Site Plan, prepared by The Jetty Specialist 13/10/2021 34680-06 A Pontoon Layout Details, prepared by The Jetty Specialist 13/10/2021 34680-07 A Elevations, prepared by The Jetty Specialist 13/10/2021 34680-08 A Pile Setout, prepared by The Jetty Specialist 13/10/2021 34680-P1B-1 0 Pontoon P1B, Construction Details, prepared by The Jetty Specialist 2/11/2021 34680-P1B-2 0 Pontoon P1B, Foam Details, prepared by The Jetty Specialist 2/11/2021 34680-P2A-1 0 Pontoon P2A & P1A, Construction Details, prepared by The Jetty Specialist 2/11/2021 34680-P2A-2 0 Pontoon P2A – 2 Foam Details, prepared by The Jetty Specialist 2/11/2021 34680-P2B-1 0 Pontoon P2B Construction Details, prepared by The Jetty Specialist 2/11/2021 34680-P2B-2 0 Pontoon P2B – 2 Foam Details, prepared by The Jetty Specialist 2/11/2021 34680-P3A-1 0 Pontoon P3A-1 Construction Details, prepared by The Jetty Specialist 2/11/2021 34680-P3A-2 0 Pontoon P3A Foam Details, prepared by The Jetty Specialist 2/11/2021 34680-P3B-1 0 Pontoon P3B-1 Construction Details, prepared by The Jetty Specialist 2/11/2021 34680-P3B-2 0 Pontoon P3B Foam Details, prepared by The Jetty Specialist 2/11/2021 34680-P3C-1 0 Pontoon P3C Construction Details, prepared by The Jetty Specialist 2/11/2021 34680-P3C-2 0 Pontoon P3C Foam Details, prepared by The Jetty Specialist 2/11/2021 34680-P3D-1 0 Pontoon P3D Construction Details, prepared by The Jetty Specialist 2/11/2021 34680-P3D-2 0 Pontoon P3D Foam Details, prepared by The Jetty Specialist 2/11/2021 34680-P3E-1 0 Pontoon P3E Construction Details, prepared by The Jetty Specialist 2/11/2021 34680-P3D-2 0 Pontoon P3A Foam Details, prepared by The Jetty Specialist 2/11/2021 34680-B1-1 0 Pile Bracket B1 General Arrangement, prepared by The Jetty Specialist 2/11/2021 34680-B1-2 0 Pile Bracket B1 Corner Bracket, prepared by The Jetty Specialist 2/11/2021 34680-B1-3 0 Pile Bracket B1 Corner Bracket 2, prepared by The Jetty Specialist 2/11/2021 34680-B1-4 0 Pile Bracket B1 6mm Chequer Plate, prepared by The Jetty Specialist 2/11/2021 34680-B2-1 0 Inboard Pile Bracket B2 General Arrangement, prepared by The Jetty Specialist 2/11/2021 34680-B2-2 0 Inboard Pile Bracket B2 Exposed Bracket, prepared by The Jetty Specialist 2/11/2021 34680-B2-3 0 Inboard Pile Bracket B2 UA Bracket, prepared by The Jetty Specialist 2/11/2021 34680-SJ-3 0 Starter Jetty Platform 2, prepared by The Jetty Specialist 2/11/2021 34680-SJ-1 0 Starter Jetty Headstock, prepared by The Jetty Specialist 2/11/2021 34680-SJ-2 0 Starter Jetty Platform 1, prepared by The Jetty Specialist 2/11/2021 34680-GW-1 0 4m Gangway 1 Construction Detail, prepared by The Jetty Specialist 2/11/2021 Certification of piles condition The installation of the piles must be supervised by a licensed cadastral surveyor. Certification of the location of the installed piles prepared by a licensed cadastral surveyor must be provided to Council. The certification must: State that the location of the piles is in accordance with the approved plans and Be submitted to Council prior to the installation/construction of any other elements of the approved works. Currency This approval lapses where the construction of the jetty extension and pontoons have not commenced within 17 November 2028, unless application is made and approved by Council for an extension. Nature and extent of Use All vessels, kayaks and SUPs for hire and all equipment associated with the marine use of the facility must wholly moored/stored within the approved lease area, with a maximum of 31 vessels at any one time. All structures must be constructed wholly within the approved commercial lease area as per the approve plans. All commercial activities including, the loading and unloading of passengers and boat docking is confined to the commercial lease areas of the respective commercial operation. Structures All structures must use materials, natural finishes and colours that blend with the surrounding natural landscape. Structures must be designed and constructed such that they are free standing within the waterway and are not connected to or behind the revetment wall or rock wall. Structures must be designed and constructed such that they do not place additional vertical or lateral loads onto the existing revetment wall that may compromise the long term stability and/or durability of the wall. Upon completion of works, a certification by RPEQ must be provided to Council in this regard. All structures must have no detrimental effects on stormwater drains and/or easements. No boatlifting devices are to be attached or moored at the structures for the purpose of elevating a vessel above the water without Council approval. The jetty and deck areas must be constructed in a manner to render the underside area vermin proof. There must be no electrical reticulation system carrying electricity in excess of 24 volts beyond the revetment wall unless all switches and power outlets are positioned above the 1% AEP flood level. Lighting associated with the use must be designed, installed, operated, and maintained in accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor Lighting. Wastewater and sullage must only be disposed of at approved pump out facilities. The mooring facility must not be utilised for live-aboard purposes. Any construction and post construction activity must not to impact on the condition of the waterway and is to be conducted so as not to breach the Environmental Protection Act EPA (1994) and the Environmental Protection (Water) Policy 2009. Certification by a Registered Professional Engineer of Queensland that states that the jetty extension and pontoons are constructed in accordance with best practice methods and are structurally sound must be submitted to Council. This certification must be submitted to Council within three (3) months of the completion of the works. A final inspection and approval of the structure by Council’s Inspector is also required. Please contact Council’s Planning Assessment Section to arrange the inspection. After completion, the proposed works must be maintained in a sound state of repair in accordance with the approved plans. All necessary State government approvals relating to this development must be obtained prior to any works commencing on the site. Environment To ensure the safety of persons accessing the approved works and to prevent environmental harm, a safety audit of the on-site fuel storage tanks, bowsers and associate pipework, valves, vents and systems shall be conducted by a suitably qualified professional and submitted to Council for approval prior to the use of the new works (pontoon/jetty extensions). The audit shall demonstrate that the fuel systems are in a safe and serviceable condition or, where necessary, identify repair and rectification requirements to meet the relevant Australian Standards and industry best practice environmental management. Any repair works must be completed, with certification submitted by the auditor to Council, prior to the use of the new works (pontoon/jetty extensions). reasons for approval Find the following matters relevant to the assessment and sufficient reason to approve the application: Although there is a proposed net increase of pontoons which increases site cover within the lease area, the proposal: will ensure the vessels are moored wholly within the existing lease area of the marine facility; and maintains the character of the site as a marine facility which is compatible with surrounding marine activities. referral agencies Referral Status Referral Agency and Address Referral Trigger Concurrence SARA at DILGP SARA at DILGP Via MyDAS2 at https://prod2.dev-assess.qld.gov.au/suite/ (for assistance, contact DILGP at 5352 9701 or email:[email protected] Schedule 10, Part 17, Division 1 – Tidal Works or work in a Coastal Management District advisory notes Infrastructure Charges All developments and/or changes to existing developments may require payment of “Infrastructure 1. Charges” (as applicable) in accordance with Council’s “Charges Resolution” made pursuant to the planning legislation and regulations current at the time of issue. For further information, please refer to https://www.noosa.qld.gov.au/planning-development/development-tools-guidelines/infrastructure-charges property notes Not applicable variation approval details Not applicable. further development permits required Type of Development Permit Required Subject of the required Development Permit Development Permit for Building Works All Building Works submissions Not applicable. rights of appeal You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given. other details If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices. Yours faithfully, Patrick Murphy Acting Manager, Development Assessment Enc: Appeal Rights Referral Agency Response List of Submitters Approved Plans/Documents cc. [email protected] Referral Agency Response PLANNING ACT 2016 & PLANNING REGULATION 2017 List of Submitters PLANNING ACT 2016 & PLANNING REGULATION 2017 Name Email Address Jeanette Gentle [email protected] 3 Laburnum Crescent Noosaville 4566 Mary Hayden [email protected] 21 Cloudsley Street Noosaville 456 Appeal Rights PLANNING ACT 2016 & PLANNING REGULATION 2017 Chapter 6 Dispute resolution Part 1 Appeal rights 229 Appeals to tribunal or P&E Court (1) Schedule 1 of the Planning Act 2016 states – (a) Matters that may be appealed to – (i) either a tribunal or the P&E Court; or (ii) only a tribunal; or (iii) only the P&E Court; and (b) The person- (i) who may appeal a matter (the appellant); and (ii) who is a respondent in an appeal of the matter; and (iii) who is a co-respondent in an appeal of the matter; and (iv) who may elect to be a co-respondent in an appeal of the matter. (2) An appellant may start an appeal within the appeal period. (3) The appeal period is – (a) for an appeal by a building advisory agency – 10 business days after a decision notice for the decision is given to the agency; or (b) for an appeal against a deemed refusal – at any time after the deemed refusal happens; or (c) for an appeal against a decision of the Minister, under chapter 7, part 4, to register premises or to renew the registration of premises – 20 business days after a notice us published under section 269(3)(a) or (4); or (d) for an appeal against an infrastructure charges notice – 20 business days after the infrastructure charges notice is given to the person; or (e) for an appeal about a deemed approval of a development application for which a decision notice has not been given – 30 business days after the applicant gives the deemed approval notice to the assessment manager; or (f) for any other appeal – 20 business days after a notice of the decision for the matter, including an enforcement notice, is given to the person. Note – See the P&E Court Act for the court’s power to extend the appeal period. (4) Each respondent and co-respondent for an appeal may be heard in the appeal. (5) If an appeal is only about a referral agency’s response, the assessment manager may apply to the tribunal or P&E Court to withdraw from the appeal. (6) To remove any doubt. It is declared that an appeal against an infrastructure charges notice must not be about- (a) the adopted charge itself; or (b) for a decision about an offset or refund- (i) the establishment cost of trunk infrastructure identified in a LGIP; or (ii) the cost of infrastructure decided using the method included in the local government’s charges resolution. 230 Notice of appeal (1) An appellant starts an appeal by lodging, with the registrar of the tribunal or P&E Court, a notice of appeal that- (a) is in the approved form; and (b) succinctly states the grounds of the appeal. (2) The notice of appeal must be accompanied by the required fee. (3) The appellant or, for an appeal to a tribunal, the registrar must, within the service period, give a copy of the notice of appeal to – (a) the respondent for the appeal; and (b) each co-respondent for the appeal; and (c) for an appeal about a development application under schedule 1, table 1, item 1 – each principal submitter for the development application; and (d) for and appeal about a change application under schedule 1, table 1, item 2 – each principal submitter for the change application; and (e) each person who may elect to become a co-respondent for the appeal, other than an eligible submitter who is not a principal submitter in an appeal under paragraph (c) or (d); and (f) for an appeal to the P&E Court – the chief executive; and (g) for an appeal to a tribunal under another Act – any other person who the registrar considers appropriate. (4) The service period is – (a) if a submitter or advice agency started the appeal in the P&E Court – 2 business days after the appeal has started; or (b) otherwise – 10 business days after the appeal is started. (5) A notice of appeal given to a person who may elect to be a co-respondent must state the effect of subsection (6). (6) A person elects to be a co-respondent by filing a notice of election, in the approved form, within 10 business days after the notice of appeal is given to the person. 231 Other appeals (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless the Supreme Court decides a decision or other matter under this Act is affected by jurisdictional error, the decision or matter is non-appealable. (2) The Judicial Review Act 1991, part 5 applies to the decision or matter to the extent it is affected by jurisdictional error. (3) A person who, but for subsection (1) could have made an application under the Judicial Review Act 1991 in relation to the decision or matter, may apply under part 4 of that Act for a statement of reasons in relation to the decision or matter. (4) In this section – decision includes- (a) conduct engaged in for the purpose of making a decision; and (b) other conduct that relates to the making of a decision; and (c) the making of a decision or failure to make a decision; and (d) a purported decision; and (e) a deemed refusal. non-appealable, for a decision or matter, means the decision or matter- (a) is final and conclusive; and (b) may not be challenged, appealed against, reviewed, quashed, set aside or called into question in any other way under the Judicial Review Act 1991 or otherwise, whether by the Supreme Court, another court, a tribunal or another entity; and (c) is not subject to any declaratory, injunctive or other order of the Supreme Court, another court, a tribunal or another entity on any ground. 232 Rules of the P&E Court (1) A person who is appealing to the P&E Court must comply with the rules of the court that apply to the appeal. (2) However, the P&E Court may hear and decide an appeal even if the person has not complied with the rules of the P&E Court [word/footer1.xml] Page 4 of 4 [word/footer2.xml] PO Box 141 P. (07) 5329 6500 [email protected] TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au Page 1 of 4 [Attachment: image12.png (image text)] 3 August 2016 Semen Enquies te: Sharpe, Mar Nato Retores and Mines Telephone: (07)64612215 ‘RECORDING ADVICE - NEW DOCUMENT (Case: 20151004477 _Acfon:1 Lease Renewal Senice Cen: Nambour Lease fora Term of Yours No.239294 commenced on 20 July 2016. Previous Tenure 40011892 "Lease for@ Term of Years Other detals rel ing tothe new tenure areas follows: “Tie Reference: 40072475 Lat tan 160 CPo086«@ ‘Area (ha): 0.1858 (ha) Surveyed Term of ease: 30 years Tenancy: TRUSTEE — NOOSA RIVER ENTERPRISES PTY LTD AGN 110500715 AS TRUSTEE UNDER INSTRUMENT | rosi21382 ‘Tenant Corespondont Me Brad Gray Comrespondence Adress; ¢/-O Boat Hire £222 Gympie Terrace Noosavile OLD 4566 Conditions: ‘A131 specie CONDTIONS FOR: Lane for 8 Term of Years PURPOSE: Marne cy ‘aTuTon conorions Sto ons wt rs rary inl ate ance nc ch 1 tame neh ese mtn ond yah pen wh a nase 2. Duty of car: Thanscta ne esooaiy fr ty fae oan rt Lan Ae 1098 Fortean on how rivets detained oro te departments web a [Attachment: image13.png (image text)] oxi plant: Ts eee mt ep oicur pnt on and ner corel te ese ds net SER tc ain ay acne sinc owner ‘efron t Miniter: Te eee mit ve ne Mins adres ie Land Ae 194 nomaton he Moura eroboute ere oie for ngrovemants No money or rrevanen pyaly he Sat era ‘rcp cesar bert he marvenets cat re epee essay Felice eer fe noorens Catatonia gees morae abe ce ‘groves nt rosa at sued rpreanre the depurnent regres ye ise ‘Teese my ony amore thxe woven slows ave rm esses he eae oe oteeacnae ter bo ‘REGULATORY CoNTONS! Anil condition alter esa, acardoce wth te Lana Repton 1+ Indemnity: The ses inden ar gree hep ndennl he Mi ad Sc ‘ang a opener ay cm Bocas eer yay ipo od Siphon c's ous) Cea) rng raed 1 eco ®t nd station a he pana sy rng cess adeno opty danage ox connect We te iS aps sorndpotmeneeonptomsr) became onena ‘etn ty nnd are cry te nein ates ‘rer ror sepa wr posure. mare conan francs) ago ‘The se rd ocnaton be ae. “otha xe eit yom: rat, te Sate of vend a tae Rares vit SESSA an sel tne Gop rota creas ans Sainurares ker {Comronseit or fae murs na ery wine Kr poe ih ‘Shoe gron statin reer se sna tomy wees ees crt a ‘Sis By on ordanage any epary anna my Ing Sea) ry aa a {Steyn eatin saa ay ran nn dnt a cn pocna sus cage, rd genes wacom negeee Sa ‘ey ma ‘befor anal en nat lon ear $20 60.600 0) an ave opr ret Scherr ham bi oy ney ce SS marane rates naib carry of eleace. an pon city ant {Src been rnd es ha ie rn oc th Tine ma ate paca nm ttn a ge any ea a Sarr thauer ote iy amas eave srs od Sretpnentscncamng be Sam . ‘Trelsie nustenen such poly heleee expenea,each er Curing te carey ie ae. “he condone ese a ee he Sf Cuando a ay aunty eg or ‘eerie nena Gover neuaren ans ans ered nd corner be mae ye ‘Sierra Cmramert rcs Pan ‘Th aon i sae Ieee whe Commons of usa try axon) ogo renters Gators inreos Pt ss tre and anaes aed by aman 2 Agee Te vnc et rr ac sist a wr repr te | Survey Coots: ne ands be seyret nse mut oe at a oe cot Snr Suva wong mcr he! 003 Th save Ban musts ape elon SY Poaezotd [Attachment: image14.png (image text)] itn espe ine {5 Jian: Teles uso Lan At 194s al oer ean Guersant and ESmmonecut eps ©. Complanc wth Laws The kate must cory win lia recurmen eager ; iy oprah QveretndoConmenwantgovernats (ncsng he deprent SGhotaetng he fan acta uery ost Pree Panty an owt iia Be derma unt and ocanen be and m repro oe, ecsn or ‘Srcopment ath on improvements development ono othe and 1. Thetesce mua efi ay scale ter racer excaaton nroenents 0 en bette spl ef e eprten ansehen tat an ry ea ey, vig ben rar cntanes ‘Mocrcners on na nainsgsodane sare sect na 2 Th epee monroe th provements neat ate he stain of eth oii ote (ane 0” Fone ante! mnt of etre edie sori Lan Ste a tenor to grevomers andi heey autores do ‘Se rere ease a ocr Te Sapa ay esto ees ot 5 Ppt mit ttn te tr in De Land At 194 Sas 6, The ree mas pel ated nd tom arson ante sch wos 5 conned ess 7. The eee must ene tb desler an ba fe mats wee Paring Shane, Lot [opera eau ot Noosa Ste Coane, barge mane Maintenance of andsape and benuticaton program 1. as na caring ou wat ayer ae staal'o he ese ay mean ‘erie ise mnt are expan ete lean omc an he ‘Shama con ars runs tenure he bay ees ro estan el be Me ‘Sister eta tt 2. luo cnr ono righ races ansab ah ae mak ii edd mt ar, sustalabity an protection of tend , 1. helene must ndeate 268 mse lsu per cenmencomert af ar xcs edge ‘tokaanray he rter sng Larch T08on Gace ta aba oh 2. hay penn aura by ae ma tal res lg ta wmf ne ae, tae fae anges 108 aac ay pron aoe wate mansgeso ot nore pen. 3. The ase must en ro pert sb kalo ered on hela ny mato anger Tesi esSin en ies Sates bess an reuse apse we econ ah ‘geo ch erave eacmping tn eey espe 4 The lessee mus ene Bu 80 an ey acy andeaten ne a chase pol aka snr cant Cred oa scr amame oe peor eke xg [Attachment: image15.png (image text)] 5. Te neon must tt nzas expense noe selon nd eauemars lth Depateano (Siocon bi tara yor ek er ass nian fon von maya ened ‘nt vera sy tents conan erm sine roa wc sonra my oe rou shore Sad eco satan wenazecaleion 6. Tarn matt nzoes expanse manne of wal whine an stro aow ‘Monts ssbesy rege th reps dap sal sage tne coy he ane he essa ‘is lees sn roma sno ay ssn be eased oman cn Go ae tote lwesce'mat a telseer expense, be espa 9 ang be on say sora ‘Sou part cong ow of sur espn and epost eae ok 1. Tin tnt awe an eon nin fi enna 1. Telesee musts ay ny tere wih ay nagaten mar ght eid ane ar, > Ty tan sds ic ex ena Ca citane Noster tne Sapper ett aero Raise ey mana orate argent 2. The esses must sg ntl ard aint eons expaen, any ravine uy ahs (i weary oon sh Bapumertl repr anal Roos como aces |. icons nen, oe, ough soe an ow Nghia win and meso Imarines na good ans sineares swt oar 5 Teleaee murat at ies neh nacasr secon ase hat a ight ono above he an ae ‘Nadetepeset gue orton whic ay eae hse nangatan sured tras © “nteaansoeengymert a pepzra eres 6. These mustot alow ay vss moot wiin te lobe use a. pemaner 9a fr human ‘Mbraton tet tr apa oe inate agri ee Aa Te 7 Thelesge mus ke escste son ene Pat a ean taco mons win be ‘sss atv and mat mond wy wanna Bocas anda sch venel n pats ‘tet mate oneesdh beyond toss ihe ‘omer conten he Mitr considers appropiate 1 Thetne muri cary cu on eerie out ey olen. pastor my ecaston ‘tSee apne ol asda eh Emonmon recon he 18 2 To atu acaece win he ons of seen 240 of he Nae Tl Act 199 (Cn ‘Tecra nan 0 ot hae a A 195 evar enangushmer pon spas. [Attachment: image16.png (image text)] bin itl 908643 908649 peplgatorn 21 SVS606 nas ‘aiaaaov 58 10N Ti WW GAIVRIT WO O30%0 ¥ @aTTOw Be A¥H mV Ome ‘eroe0s RUE eeeun [Emme ee [|e an oF an WEB Lot 160 |couwry ne ae we SOU EST lanomus Lt Stn 008786 pwrrecarsa nt See | 100 [eee] aezae | onowm nn908649 [Attachment: image17.png (image text)] [ie Retrocs] oor 908649 yo ca eum scan mia 75= De te fetta 1096 cnn ene Pot Fes SSF NIG Pen 95 WON ‘eAONM rian 908649] erse0s [Attachment: image18.png (image text)] ee) NOOSA COUNCIL [Attachment: image3.png (image text)] eerste Soreement ‘Apleantetrece: 21280, ‘26 May2022 chit Exeoutve Offer Noosa Shite Counei PO Box 144 Tewantn Old 4565 [email protected] gov. ‘Atenion: Lisa Pienaar Dear Ms Pienaar SARA response—222 Gympie Terrace, Noosaville (reer ageny respane en vce econ 6 tie Ping At 201) “The development appction desorbed below was confimed as properly refered by the State ‘Assessment and Referral Agency (SARA) on 20 Ape 2022. Response Oiteome Feral agency response wih condeons Date of response: 28 May 2022 Condens: “The conditions in Attachment 1 must be ataches to any development approval ‘Aaviee ‘Acvice tothe appicart isn Atachment 2 Reasons: “The reason forthe referal agency response are in Attachment 3 Development details, Desertion: Development emt Operational work for preserbes ti! works ateral change of use fora lnsing (commersa SARA roe: Referal agency SARA tigger ‘Schedule 10, Part 17, Dison 3. Table 1 (Panning Reguaton 2017) [Attachment: image4.png (image text)] ‘Tidal works or workin a coastal management tet ‘Schedule 10, Part 17, Division 3, Table 2 (Planning Reguaton 2017) ‘Tidal works or workin a coastal management tet SARA reference 7204-28387 SRA ‘Assessment Manager’ Noosa Shie Cound ‘Steet adress 222 Gympie Terace, Noosavle Real propery desrpton: Lt 160 0n CPO08649 ‘ppcantrame: Noosa River Enterprises Ply Ltd ACN 110803718 As Trustee Under Instrument 708121082 ‘Appicant contact detais: Cl Project Uban (Tish Bet) PO Box 6260 Maroocnyeore BC OLD 4858 ‘rsh [email protected] au Representations “Bn appicant may make represeriatons to a concuTence agency, a any Une before he application ‘cided, about changing a matter inthe refeal agency response (s-30 Development Assessment Rules) ‘Copies ofthe relevant provsions ae in Atachment &- ‘Acopy ofthis response has been sent tothe applicant for their informaton, Fer further information please contact Carine Plank, Principal Planning Ofer, on (07) 5362 8708 or via ‘email SEQNochSARA@dsdigp a gov au who wi be pleased to asst. ‘Yours snosrely = Nooea River Enerrees ty Lis ACN 110595715 Ae Truce Under nsant 708121982, Project ran, nen nooperaprojecturoan com au ‘ene Ataenment 1 - eter ageney conten ‘taonment 2" aan tobe sotean, ‘Ataonment 3 Reason or refers agaoy responce ‘Atcrmert 4 Represeratone powers ‘Atacnment §- approves pane an speaeaons [Attachment: image5.png (image text)] Attachment 1—Referral agency conditions ‘Gnder econ SV) of he Panng Ac 2076 the olowng conn MUsTDE SHSENEG any GER. ‘sopra reatng ios aplcaton (Coles ofthe plans ana epecteaton referenced Deu are ound a Atnownant Wo. Conditions Condition timing Operational work Planning Reguation 2017, Schedule 10, Par 17, Division 3, Table | —Tidal wars or workin a coastal management davct—The chet xecutve asmristerng the Pinning Act 204 Diecter-General of he Department of Envronment and Science tbe the enfocement author for ‘he development to which t's development approval relates forthe adminisraton and enforcement of any matter relating to the folowing condions jBnomnates the 1 | The constuction of the fager pontoons must be caried ou generaly | For the duration of he in accordance win the follwing pans: works ‘+ Enising Structures Pian, prepare by Ege Consulting Engneers, dated 1210/21, reference 34660-03, revsion A + New Ste Pan, prepared by Eage Consulting Engineers, dated 13/1021, reference 2480-04, revsion A + Vessel Mooring ite Plan, prepared by Edge Consulting Engneers, dated 141072. reterence 94080-08revsion D ‘+ Elevations, prepare by Ege Consulting Engineer, dated TaHOZT eterence 488087, revsion A | Forthe proposed works, only use dean materials and ensure hat | For te duration ofthe the worke do nt cause contamnaton, works 3. _| Erosion and sesimant contol measures which ae inaccardance | Forte uration of he ‘with Bet Pract Erosion and Sediment Conta PESC) works {guidelines for Ausra (Itematona Erosion Contl Assciation), {eto be insted and mainiined to prevent the release of sediment fe tcal waters “F_| Should the tnger pontoons colapse, aor cherie sur "As soon a5 reasonably structural consequences which impact ter ntegntyorabity to | pracicabe subsequent ‘function a5 intended the worke most be {othe damage (a) rentatad n aocorance wth this cevelopment approval of (©) femoved and disposed of at an appropriately ieensea ‘acu | Submit"As Constructed crawings to palm@@des.dd.gov.au ormail_| Within two weeks of the completion ofthe works Department of Envronment and Science emt and Licence Management Inmplementaton and Supper Unt GPO Box 2464 Srsbane Qld 4001 3 (a) inthe event hatha works eause Gaturtance @ondeaton |) Upon diturtance ‘fac sufate sol. the afeced sol must be weated and coronation unt ‘hereater managed (unl the afected sol has been the afetes so! ‘netvased or contained) in acooréance wih the curent hasbeen (Queensland Acid Sulfate Soi Technical Manual So autre or ‘management guidelines prepared by te Deparment of contained ‘Scenes, iformaton Technology, Innovation and the Arts, | (o) At Bete the aoe {ols have been (&) Certcaton by an appropratly quad person, contming | neutralised ‘hat the afacted sou hae bean neuralzed or eontaned.n contaned _ccerdance wih (a) above i to be provides to. [Attachment: image6.png (image text)] ‘palm@des qd govau or maled we ‘Department of Envrenment and Science Permit and Licence Management Insgementaton and Supper Unt (GPO Box 2464 Brisbane Gl 4001 Note: Appropratey quate person means 2 person o persons wno has poteccenal qualteaton, waning, ils and experence eleva {tenis or Si suf sol management ang can gue auortabve Stcccoment aves and snay an Seuss sot management tinge evant protec, Sanaares,metoaso rare Planning Regulation 2017, Schedule 10, Par 17, Division 3, Table2— Tidal wars or wom in a coastal management dstct— The chit execuive administering the Planning Act 2016 nominates the Director-General of he Department of Transport and Man Roads ~ Martime Safety Queensiand to be ‘he enforcement authorty for fe Gevelopment io which tis development approval relates forthe [éministraon and enforcement ofan matter eating tthe folowing conatoons 7. ] The operatonal work must be cared aut generalyn scordance: sth the fllowing plan ‘+ Cover Page, prepared by Edge Consulting Engineers, dated ITI, reference 34680-01, revision O + Enising Stnuctures Pian, prepare by Ege Consulting Engneers, dated 1310721, reference 34080-02revion A + Engng Sinctures Pian, prepare by Edge Consulting Engneers, dated 1210/21, reference 34660-03, revsion A + New Ste Pan, prepared by Eage Consulting Engineers, dated 13/1021, reference 2480-04, evion A + Vessel Mooring Ste Plan, prepared by Edge Consulting Engineers, dated 1210721, rlerence 24080-08,revsion D ‘+ Pontoon Layout Det, prepared by Ege Consuting Engneers, dated 1410/2, relerence 24660-00fevion A ‘+ Elevations, prepare by Ege Consulting Engineer, dated Ta/OZT eterence 2488007, revsion A + Pe Setout prepares by Edge Consulting Engineer, dated 13/1021, reference 2408005, evsion A For be curation ofthe works 3. _| Alvessels, stuctores plant and equipment associed wih the constuction ofthe approved works must be imarked in accordance wih the folowing specicatons and requrements such that Undertaking the constuction works does nol cause ask fo the safe navigaton of ships: {@) any anchors deployed must be marked with yelow buoys, ‘and ted with FL yolow ight ted (b) Iigningprovced must not ebscure. isquise or otherwise intrare wi the afectvenees of avgatons ight. Vine he works ae coourng ©. _| The structure must be marke in aesordance withthe flowing specticatons, such tatit does not cause a sk othe safe navigaton of other ships: (a) pedestrian syle lighting to gang way andlor retro reflective {pe on portcen ples (b) Iignting proved must nt obscure squise or otherwise intrare wi the afectvenees of avgatons ight. Bal imes 10___| The constuction, operation or maintenance ofthe stucture and any ship moored at fis structure, must not mpede the safe navigation of tthe ship or estit safe scons oor rom neighbouring sutures aimee TH | (@) Any debris or simiarcbstucton encountered whist undertaking the work must be dsposed ofa the applicants (and Atal times | [Attachment: image8.png (image text)] Attachment 2—Advice to the applicant ‘General advice | Temns.and pirases used in bis dooument ave defined inthe Planning Act 2076s regulation, or the State Development Assessment Provisions, version 3. a werd remains undetnea t has ts ordinary meaning. [Attachment: image9.png (image text)] Attachment 3—Reasons for referral agency response [Ger unger secon S57) othe Panning Ac 2976) “The reasons for SARA's decision are: «+ The development appiation i for 3 development permit fr operational work preserbed cal works) and material change of use fo a landing (commercia) This works the refurbishment ofthe existing Doathre landing st 222 Gympie Terace, Noosavl (Lot 160 on CPGOB64®) (the subject ste) “+The subject sts inthe Noosa River and is encompassed bya seabed lease. The subject ste smmedatlyacjons public reserve land and access is through Ely Pak. ‘+The refurbishment wil not est in an increase or intensity of the existing use, however, wil ove the removal of some of the exsng inastueture and constucton of new inkastucure “+The subject sts ina tidal waterway subject to coastal processes and therefore has been assessed bby SARA aganst he State Development Assessment Provisions (SDAP). version 30, Sate code &. Coastal development and tdal works (State code 8). SARA fds that the development complies with State code 8, subject conditions te: ‘© ensure the development is cariad out generally in aocordance withthe plans of development ‘submit wih the appeaton (© ensure the development avoids or minimises adverse impacts on coastal resources and their wakes (© ensure landowners are aware they must ake responsibility for their damaged property 25. ‘they can impact on coastal resoures and publ safety ‘2 alow for compiance n reiaton to what = considered generally in accordance wit the ‘approved plans when preliminary plans ae submited withthe application. Development inconsistent wi the approval may have an impact on coastal management that was not considered n assessment ‘© ensure any disturbance to aid sulfate sole managed to prevent impact to coastal “+The subject ste is in a wateraay thats equented by commercial and private vessels. The subject ‘te is mapped as a developed marina and a hgh-isk martme development zone. The navgaton comdorisin lose poxamay the subject ste. As such the development has been assessed by ‘SARA against the SDAP, version 3.0, State cove 7: Maite safety (State code 7). SARA fs that the development complies wih State code 7, subject © conditions t: (© ensue the development is cama out generally n aocordance withthe plans of development ‘submited wih the appeaton (© ensure that tal times, aight on or above the development ste do notinterere wih safe navigaton n surounding waterways. (© ensue the safe navigaton of ether ships and unresticted access toftom neighbouring (© ansure the development does not encroach onthe navigable waterway in away that impeces the safe passage of vessels. Material used in the assessment of the application: ‘+ The development appleation materal an submited plans Planing Act 2016 “+ Planing Regulation 2017 “+ The SDAP, version 3.0, as published by the Department of State Development, Inastrucure, Local (Goverment and Planning ‘The Development Assessment Rules “+ SARADA Mapping system “+ Human Rights Act 2019
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.