Council archive · source document
RFI - proposal plans 6 may 22 · MCU21/0212
Plans and drawings: the text below has words only, no drawings.
Very large file (30.2 MB): may take a few minutes to open.
C B A
2450.000
costal setback
site boundary
2.0m setback
site boundary
RL 40.480
roof
RL39.790
1920
ngl +8m rnd01
tbs01
roof terrace
R L37.870
level 01
480
RL37.390 rnd01
3250
stn01
bal01
ground level
RL34.140
fen01
3240
lower ground
RL30.900
ngl
1 elevation north
1 : 100
DRAWN REV DATE ISSUE PROJECT CLIEN T DR AW ING N AM E PHASE DW G NO R EV PRO JECT NO 0375
LM A 6.05.22 DA RFI
66 Seaview Tce, G & C Deane building elevation 305.01 A SC ALE 1 : 100
elevation north
Sunshine Beach schem atic design
1:1 @ A3
D o not scale from draw ings. D imensions are to be checked on site prior to com m encem ent of w ork. Discrepancies to be brought to the attention of the author. A ny dim ensions not nominated m ust be referred to the A rchitect for confirma tion. The concepts and inform ation contained in this docum ent are the copyright of Architect. U se or copying of the docum ent in w hole or in part w ithout the w ritten permission of the A rchitect constitutes an infringem ent of copyright.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - proposal plans 6 may 22.pdfRelated documentApplication case desk ↗
About this file
- File size
- 30.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.