Council Decision - Changes - old apps - 005.1994.00001375.002 [As Published] · 51994.1375.02
Landscaping
2. The open space and setback areas shall be landscaped generally in accordance with
the approved landscape plan; Drawing No. 07 prepared by Chris Clout Design, dated 14
October 2009. In this regard screening vegetation shall be planted to the northern and
southern boundaries and shall be planted in accordance with Council’s Policy on
Landscaping Plants and Guidelines PSP3.
3. Existing trees on the site and within road reserves shall be retained, except where
required to be removed due to building operations or the conduct of the approved use.
Security Bond
4. Security in the form of a cash bond or trading bank guarantee to the sum of $2000 must
be submitted, to secure performance of all conditions of this approval, prior to the issue
of a Development Permit for building works. The cash bond or trading bank guarantee
will be returned on performance of the conditions of approval less any costs incurred by
Council in respect of enforcing performance of this permit.
Building Height
5. The building height shall not exceed 8.0 metres above the natural ground level, finished
ground level and 2 storey.
Sediment and Erosion Control
6. Any person acting on this permit must prevent erosion and sediment export from leaving
the site. Site control measures such as and not limited to silt fencing must be used
around exposed area and to secure material stockpiles where necessary.
General
7. Any deck or balcony areas shall not to be enclosed with shutters, glass panelling or the
like, thus remain as open structures.
8. The development shall be undertaken and operated in a manner that causes no
detrimental effect upon the amenity of the neighbourhood by reason of the creation of
excessive noise, lighting nuisance or other emissions.
9. The transportation of all materials to and from the site must be undertaken in a manner
such that no particle matter escapes onto a public road. All vehicles carrying materials
either to or from the site must be covered to prevent materials including dust being
windblown from the vehicle.
10. The design of the stormwater disposal system, carparking and access shall be in
accordance with Council’s Planning Scheme Policy PSP05 – Engineering Design
Standards – Roads, Drainage and Earthworks. To avoid conflict with underground
pipes or services, all existing and proposed services required by the development shall
be shown on the building plans.
11. Any damage caused to any public utility during the course of construction shall be
repaired to Council’s standards and at no cost to Council.
12. Any alteration of any public utility or other facilities necessitated by the development of
the land or associated construction works external to the site shall be at no cost to
Council.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Council Decision - Changes - old apps - 005.1994.00001375.002 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11 KB (small file)
- File type
No other editions are linked here.