Council Decision - Changes - old apps - 005.1994.00001375.002 [As Published] · 51994.1375.02

of 3

Text shows just the words. Original shows the document exactly as it was published.

Landscaping

2.    The open space and setback areas shall be landscaped generally in accordance with
      the approved landscape plan; Drawing No. 07 prepared by Chris Clout Design, dated 14
      October 2009. In this regard screening vegetation shall be planted to the northern and
      southern boundaries and shall be planted in accordance with Council’s Policy on
      Landscaping Plants and Guidelines PSP3.

3.    Existing trees on the site and within road reserves shall be retained, except where
      required to be removed due to building operations or the conduct of the approved use.

Security Bond

4.    Security in the form of a cash bond or trading bank guarantee to the sum of $2000 must
      be submitted, to secure performance of all conditions of this approval, prior to the issue
      of a Development Permit for building works. The cash bond or trading bank guarantee
      will be returned on performance of the conditions of approval less any costs incurred by
      Council in respect of enforcing performance of this permit.

Building Height

5.    The building height shall not exceed 8.0 metres above the natural ground level, finished
      ground level and 2 storey.

Sediment and Erosion Control

6.    Any person acting on this permit must prevent erosion and sediment export from leaving
      the site. Site control measures such as and not limited to silt fencing must be used
      around exposed area and to secure material stockpiles where necessary.

General

7.    Any deck or balcony areas shall not to be enclosed with shutters, glass panelling or the
      like, thus remain as open structures.

8.    The development shall be undertaken and operated in a manner that causes no
      detrimental effect upon the amenity of the neighbourhood by reason of the creation of
      excessive noise, lighting nuisance or other emissions.

9.    The transportation of all materials to and from the site must be undertaken in a manner
      such that no particle matter escapes onto a public road. All vehicles carrying materials
      either to or from the site must be covered to prevent materials including dust being
      windblown from the vehicle.

10.   The design of the stormwater disposal system, carparking and access shall be in
      accordance with Council’s Planning Scheme Policy PSP05 – Engineering Design
      Standards – Roads, Drainage and Earthworks. To avoid conflict with underground
      pipes or services, all existing and proposed services required by the development shall
      be shown on the building plans.

11.   Any damage caused to any public utility during the course of construction shall be
      repaired to Council’s standards and at no cost to Council.

12.   Any alteration of any public utility or other facilities necessitated by the development of
      the land or associated construction works external to the site shall be at no cost to
      Council.

Used in these records

About this file

File size
11 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Council Decision - Changes - old apps - 005.1994.00001375.002 [As Published].pdf · 11 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.