PLANNING AND ENVIRONMENT COURT
QUEENSLAND

    
   

21 JUN 2019

 

In the Planning and Environment
Court

__.__.Held at: Brisbane

Between: | THOMCO (NO. 2087) PTY LTD (ACN Appellant
2 106 723 488)
as
=2! And: NOOSA SHIRE COUNCIL Respondent
a
And: PEREGIAN BEACH COMMUNITY Co-Respondent
ASSOCIATION INC. by Election
JUDGMENT

Before His Honour Judge Jones
Date of Hearing: 21/06/2019

Date of Judgment: 21/06/2019

THIS MATTER HAVING on the 28" and 29% days of May 2018, the 1%, 4,
5" and 6" days of June 2018, the 15", 16", 17" and 18% days of October
2018 and the 21% day of June 2019, come on for hearing by way of an
appeal against the Respondent’s refusal of the Appellant’s development
application, as amended by the changes considered by this Honourable Court
on 29 May 2018, 18 October 2018 and 21 June 2019, for a development

permit for the reconfiguration of a lot (1 lot into 3 lots) and a development

 

. Judgment — ~ CONNOR O’MEARA -
Filed on behalf of the Appellant Solicitors
Form No PEC-7 Level 4, 10 Eagle Street

BRISBANE 4000

Phonez82213033

Fax” 3221 66
ff >; /

  

Page 1 of 46

ZEUL

Appeal No. 4066 of 2017

 
Full text of the other 45 pages

Page 2

Page 2 of 46


[OCR of page images]
permit for a material change of use of premises for visitor accommodation (52
x Type 4 conventional units), in respect of land situated at 215 David Low
Way, Peregian Beach, formerly described as Lot 77 on SP 231615 (now Lot 1

on SP286680) (“the Development Application”)

AND UPON the Court being satisfied that the changes to the Development
Application considered by the Court on 29 May 2018, 18 October 2018 and
21 June 2019 are minor changes for the purpose of section 46(3) of the

Planning and Environment Court Act 2016

AND UPON HEARING the Solicitor for the Appellant, Counsel for the

Respondent and Counsel for the Co-Respondent by Election

IT IS ORDERED THAT:

flee The appeal is allowed.

2. The Development Application is approved subject to the conditions in
the development approval package attached hereto as “Annexure A”

pages 1 to 43.

3. Each party bear its own costs of the appeal.

Filed on 1/06/2019

Filed by: Connor O'Meara Solicitors

Service Address: Level 5, 370 Queen Street, Brisbane 4000
Telephone: (07) 3221 3033

Facsimile: (07) 3221 6661

Email: [email protected]

Page 2 of 46

Page 3

Page 3 of 46


[OCR of page images]
Registrar

Page 3 of 46

Page 4

                                          Annexure A
1        APPLICATION DETAILS

    Application No:                     MCU16/0153 REC16/0041

    Street Address:                     215 David Low Way Peregian Beach

    Real Property Description:          Lot 1 SP 286680

    Planning Scheme:                    The Noosa Plan (28 October 2016)

2        TYPE OF DEVELOPMENT

        Development Permit for Material Change of Use of Premises - 19 x 3+ bedrooms Visitor
         accommodation Type 4 dwelling units, 1 x manager’s unit and a Visitor accommodation
         Type 4 motel building containing 10 x 2 bedrooms dwelling units and 22 x 1 bedroom
         accommodation units

        Development Permit to Reconfigure a Lot - 1 Lot into 3 Lots
3.       CONDITIONS

         When Conditions must be Complied With
1.       Unless otherwise stated, all conditions of this Decision Notice must be complied with
         prior to the use commencing, and then compliance maintained at all times while the use
         continues.
         Approved Plans
2.       Development undertaken in accordance with this approval must generally comply with
         the approved plans of development. The approved plans are listed in the following table:
             Plan No.            Rev.         Plan / Document Name                   Date
          180082 SD-02            4       Location/Site Plan prepared by Red      16 April 2019
                                          Door Architecture
          180082 SD-03            4       Site/Rufous Street Overlay prepared     16 April 2019
                                          by Red Door Architecture

          180082 SD-04            4       Site/Floor Plan prepared by Red         16 April 2019
                                          Door Architecture

          180082 SD-05            4       Site/First Floor Plan prepared by Red   16 April 2019
                                          Door Architecture

          180082 SD-06            4       Site/Roof Plan prepared by Red Door     16 April 2019
                                          Architecture

          180082 SD-07            4       Site/Unit Building Roof Plan prepared   16 April 2019
                                          by Red Door Architecture

          16003 SD-08             G       Kamala Plans prepared by Sprout         24 May 2018
                                          Architects

          16003 SD-09             G       Kamala Elevations      prepared   by    24 May 2018
                                          Sprout Architects




                                                 Page 4 of 46

Page 5

      16003 SD-10        G     Marram Plans prepared by Sprout             24 May 2018
                               Architects

      16003 SD-11        G     Marram Elevations    prepared   by          24 May 2018
                               Sprout Architects

      16003 SD-12        G     Saltbush House Plans prepared by            24 May 2018
                               Sprout Architects

      16003 SD-13        G     Saltbush House Plans prepared by            24 May 2018
                               Sprout Architects

      16003 SD-14        G     Saltbush House Elevations prepared          24 May 2018
                               by Sprout Architects

      16003 SD-15        G     Saltbush House Elevations prepared          24 May 2018
                               by Sprout Architects

      16003 SD-16        G     Lily House Plans prepared by Sprout         24 May 2018
                               Architects

      16003 SD-17        G     Lily House Plans prepared by Sprout         24 May 2018
                               Architects

      16003 SD-18        G     Lily House Elevations prepared by           24 May 2018
                               Sprout Architects

      16003 SD-19        G     Wallum House Plans prepared by              24 May 2018
                               Sprout Architects

      16003 SD-20        G     Wallum House Elevations prepared            24 May 2018
                               by Sprout Architects

      180082 SD-21       5     Floor Plans prepared by Red Door        16 April 2019
                               Architecture

      180082 SD-22       5     Floor Plans prepared by Red Door        16 April 2019
                               Architecture

      180082 SD-23       5     Elevations prepared by Red Door         16 April 2019
                               Architecture

      180082 SD-29       4     Staging Plan prepared by Red Door       16 April 2019
                               Architecture

      1108-155C-01-      C     Simmonds & Bristow Drawing             13 January 2012
      02

      Figure SW-1              re Bioretention Basin, Detention              undated
                               Basin and No-Bioretention Basin

     The approved plans may be further amended by the conditions herein.
     Staging of Development
3.   The development may be staged in accordance with the approved staging plan. The
     first stage must include the following:
     (a)   All required bushfire management measures




                                     Page 5 of 46

Page 6

      (b)   All required acoustic fencing and screening
      (c)   A 2m wide concrete pedestrian pathway between the motel building and the
            adjacent IGA shopping centre
      Nature and Extent of Approved Use
4.    The approval is for 19 x 3+ bedrooms Visitor accommodation Type 4 dwelling units, 1 x
      manager’s unit and a Visitor accommodation Type 4 motel building which contains 10 x
      2 bedrooms dwelling units and 22 x 1 bedroom accommodation units.
5.    The manager’s unit is for permanent occupation by the manager of the approved Visitor
      accommodation Type 4 dwelling units.
6.    The approved units must be used for short term visitors only. The approved units must
      not be occupied by persons for continuous occupation in excess of 90 days for each
      calendar year. A register of occupation must be kept by the body corporate and made
      available to Council upon request. The requirements of this condition must be included
      in the Community Management Statement for any body corporate for the subject site. If
      the development is to be staged the motel must be built in the first stage.
7.    Non-residential uses on the premises must not operate outside the hours of:
      (a)   7am to 10pm Monday to Thursday
      (b)   7am to 11pm Friday and Saturday
      (c)   9am to 10pm Sunday or any public holiday
      The requirements of this condition must be included in the Community Management
      Statement for any body corporate for the subject site.
8.    Service vehicle movements associated with non-residential uses on the premises
      (including loading and unloading) must not occur outside the hours of 7am to 6pm
      Monday to Saturday and not at all on Sundays or public holidays. The requirements of
      this condition must be included in the Community Management Statement for any body
      corporate for the subject site.
      Building Height
9.    The maximum height of the 19 Visitor accommodation Type 4 dwelling units and the
      managers unit must not exceed 8 metres above the finished ground level and the natural
      ground level, other than in respect of dwelling units 1, 8 and 9 which have a maximum
      height as follows:
      (a)   Dwelling Unit 1: 9.056m above natural ground level
      (b)   Dwelling Unit 8: 8.602m above natural ground level
      (c)   Dwelling Unit 9: 9.106m above natural ground level
10.   The height of the Visitor accommodation Type 4 motel building must be in accordance
      with the approved plans.
11.   Certification must be submitted to Council from a Licensed Surveyor which certifies that
      the buildings do not exceed the maximum height requirement of this Decision Notice.
      Building Appearance
12.   All air conditioning units or other mechanical equipment must be located at ground level,
      or otherwise fully enclosed or screened such that they are not visible from the street
      frontages nor adjoining properties.
13.   All deck and balcony areas above ground floor must not be enclosed by permanent
      fixtures such as shutters, louvres, glass panelling or the like, except where required to
      satisfy any privacy condition of this Decision Notice.




                                         Page 6 of 46

Page 7

14.   All buildings shall be finished in natural, muted tones and include a mix of materials as
      depicted on the Approved Plans.
15.   Any advertising sign or device is to comply with Council’s policies on advertising.
      Access and Driveways
16.   A sealed access must be provided from Sandpiper Court to all parking and manoeuvring
      areas of the development. The works must be undertaken in accordance with an
      Operational Works approval and must include in particular:
      (a)   improvements to the existing access to Sandpiper Court. The improvements must
            be sufficient to cater for the existing commercial use and the additional traffic and
            vehicle types (passenger, service, refuse and emergency services) generated by
            the proposed development
      (b)   internal access roads that are generally in accordance with the approved plans
      (c)   driveways to each residence that are in accordance with Council’s Standard
            Drawings RS-049, RS-050 and any associated addendums
      (d)   a driveway to the multi-unit building that is in accordance with Council’s Standard
            Drawing RS-051 and any associated addendums
      (e)   suitable safety measures, including warning signage, to improve driver awareness
            of pedestrians and enhance safety. Warning signage must be provided near the
            exit from the development site to warn motorists of pedestrian movements and
            other vehicles at the Sandpiper Court entrance
      (f)   clearly visible signage must be erected at the threshold of the internal road, which
            clearly indicates to motorists and pedestrians that they are entering a private road
            system
17.   If the development is to be staged a temporary sealed turnaround facility must be
      constructed at the end of each road left temporarily incomplete as a result of the
      development staging. The temporary turnaround facility must be in accordance with an
      Operational Works approval and must be of sufficient size to accommodate the 3-point
      turn manoeuvre of a refuse collection vehicle
      Car Parking
18.   Car parking spaces must be provided in accordance with the approved plans and
      marked on the site and made available and accessible at all times while the use is
      operating. The works must be undertaken in accordance with an Operational Works
      approval.
      Service Vehicles
19.   Service vehicle parking, manoeuvring and standing spaces must be provided for the
      Visitor accommodation Type 4 motel building on the site in accordance with the
      approved plans. The works must be undertaken in accordance with an Operational
      Works approval.
      Pedestrian Facilities
20.   Pedestrian facilities must be provided for the development. The works must be
      undertaken in accordance with an Operational Works approval and must include in
      particular:
      (a)   the internal pathway network generally in accordance with the approved plans
      (b)   a 2m wide pathway connection to the existing pathway network located in the
            reserve to the north of the site




                                         Page 7 of 46

Page 8

      (c)   a 2m wide pathway connection to the existing commercial development in the
            southern part of the subject site
      Stormwater Drainage
21.   The site must be provided with a stormwater drainage system connecting to a lawful
      point of discharge. The works must be undertaken in accordance with an Operational
      Works approval.
22.   A Stormwater Management Plan must be submitted for approval as part of an
      Operational Works application. The plan must address the management of stormwater
      quantity and quality and must be generally in accordance with the Stormwater
      Management Plan (SLR, 23 March 2018) being exhibit 64 in appeal 4066 of 2017 with
      the following specific modifications.
      (a)   The development shall include a 3kL tank to be provided to collect and reuse roof
            runoff from each unit, and a 200kL tank must be provided to collect and reuse
            runoff from the motel.
      (b)   The detention tanks must be sized to ensure no increase in peak discharge from
            the site for all events from 63% AEP to 1% AEP inclusive.
      (c)   The first application for Operational works for the development must include a
            Music Model prepared in accordance with the Water by Design Music Modelling
            Guidelines, and which demonstrates that the development layout proposed in the
            Operational Works application will achieve the State Planning Policy Water Quality
            Objectives of 80% Reduction in Total Suspended Solids, 60% Reduction in total
            Phosphorous, and 45% reduction in Total Nitrogen. The results of the MUSIC
            modelling must also demonstrate that the developed site will discharge less annual
            loads of Total Nitrogen, Phosphorous and Total Suspended Soils respectively
            compared to the pre-development scenario.
      (d)   The pervious percentage of the development must be consistent with the pervious
            percentage derived from attached Simmonds & Bristow Drawing 1108-155C-01-
            02 Rev C (13 January 2012). RPEQ certification must be submitted to Council
            that states the pervious percentage of the final development is consistent with that
            derived from the Simmonds & Bristow Drawing.
      (e)   The configuration of the stormwater quantity and quality components of the
            stormwater management system must be generally in accordance with Figure
            SW-1 (attached) unless otherwise agreed by Council.
      (f)   The bioretention system must be formed with batters and not walls and include a
            minimum width of 5 metres.
      (g)   Unless directed otherwise by Council, the detention tank will be covered.
      (h)   The plan shall include detailed information in relation to the following aspects of
            the design of the bio-retention system:
            (i)     calculations of underdrainage requirements for the bio-retention system;
            (ii)    filter media composition requirements;
            (iii)   a schedule which details how the construction, establishment, certification
                    and various inspections associated with each treatment measure relate to
                    other civil works;
            (iv)    Where bioretention basins are used for stormwater quality treatment, the
                    design must be consistent with all aspects of the Water by Design (2014)
                    Bioretention Technical Design Guidelines Version 1.1) Healthy Waterways
                    Ltd Brisbane, including for free draining outlets to and from the bioretention
                    basins, and include completed copies of the design check and




                                           Page 8 of 46

Page 9

                  summary contained within that document to confirm free draining outlets,
                  within reasonable construction tolerance capabilities are achieved; and
            (v)   presentation of groundwater testing results which demonstrate that all parts
                  of the treatment measures are located above seasonal high groundwater
                  levels.
            A copy of the detailed civil drawings for the bio-retention system must be included
            as an appendix to the plan.
      (i)   The plan must include a comprehensive Maintenance Plan for the detention tank
            and the bioretention system including the frequency of cleanout, methods of
            cleanout, and general maintenance. The plan will include the requirement for
            regular inspections and the keeping of records (to be maintained and made
            available to Council upon request). The plan is also to stipulate that all necessary
            improvements are required to be made immediately upon awareness of any
            deficiencies in the treatment measure/s. The detention tank is to be capped and
            trafficable.
      (j)   The plan shall include details of the costs of maintenance (including periodic
            replacement of filter media) over the life of the asset.
23.   The Maintenance Plan (including costing) must be included in any Community
      Management Statement for the site.
24.   The Body Corporate for the site must enter into a contract with a suitably qualified
      contractor(s) for the maintenance of the stormwater quantity and quality devices and
      provide evidence of both the contract and execution of the contract upon request by
      Council.
25.   Prior to the commencement of use, certification is to be submitted to Council from a
      suitably qualified stormwater quality specialist to verify that the bioretention works have
      been constructed generally in accordance with the approved civil works plans,
      conditions of approval and relevant sections of the Construction and Establishment
      Guidelines: Swales, Bioretention Systems and Wetlands (SEQ Healthy Waterways
      Partnership). Council approval of the constructed stormwater management system is
      required prior to commencement of use.
26.   Certification is required to include all relevant items noted in Construction and
      Establishment Guidelines: Swales, Bioretention Systems and Wetlands (SEQ Healthy
      Waterways Partnership) including completed and signed forms.
      Acid Sulfate Soils
27.   The application for operation works must include an Acid Sulfate Soil and Groundwater
      Management Plan for the development prepared by a suitably qualified person and in
      accordance with relevant State Government Policy and Guidance material to prevent
      any impact to the receiving environment as a result of development within actual or
      potential acid sulfate soils, and associated groundwater impacts. Detail design plans
      provided with the application for operation works approval must demonstrate how the
      bedding surrounding underground pipework will be managed to prevent continual
      dewatering of groundwaters along it to the receiving environment, and how any impacts
      to groundwater from proposed filling on potential or actual acid sulfate soils will be
      managed.
      Easements
28.   Unless otherwise agreed in writing by the relevant service provider, any public or third
      party infrastructure located on the subject site must be placed within an easement
      registered against the title of the property.




                                          Page 9 of 46

Page 10

29.   All easements for public or third party infrastructure must be in accordance with the
      planning scheme and granted at no cost to the Grantee. Where the Grantee is Council
      or a service authority, the easement documentation must be in accordance with the
      Grantee’s standard easement terms. Draft easement documentation must be submitted
      to Council for endorsement.
30.   All works must be kept clear of any existing or proposed easements for public or third
      party infrastructure on the subject land, unless agreed otherwise in writing by the
      Grantee.
      Earthworks and Retaining Walls
31.   All earthworks and associated retaining structures/batters must be undertaken in
      accordance with an Operational Works approval, and contained entirely within the
      subject site unless written permission from the respective landowner(s) is provided to
      Council.
32.   Earthworks carried out on site must not affect the structural integrity of any of the existing
      buildings and/or services and/or structures and/or lands that border the development
      site.
      Damage to Services and Assets
33.   Any damage caused to existing services and assets as a result of the development
      works must be repaired at no cost to the asset owner at the following times:
      (a)   where the damage would cause a hazard to pedestrian or vehicle safety,
            immediately; or
      (b)   where otherwise, upon completion of the works associated with the development.
      Any repair work which proposes to alter the alignment or level of existing services and
      assets must first be referred to the relevant service authority for approval.
      Outdoor Lighting
34.   Any outdoor lighting with the potential to affect surrounding residential premises shall be
      designed, installed, operated and maintained in accordance with AS4282 “The Control
      of the Obtrusive effects of Outdoor Lighting”.
      Fencing and Walls
35.   Any street fencing to David Low way or Sandpiper Court must be set back an average
      of 1 metre from the front property boundary. Any fencing on the front boundary must
      either:
      (a)   not exceed a maximum height of 1.2m;
      (b)   be of open construction..
      Street Identification
36.   The street address of the development must be clearly visible and discernible from the
      primary frontage of the site by the provision of a street number and, where appropriate,
      the building name.
      Clothes Drying Areas
37.   Each dwelling unit in Stage 2 must be provided with access to an outdoor clothes line
      which is screened from public view.




                                          Page 10 of 46

Page 11

      Performance Bond
38.   Security in the form of a cash bond or trading bank guarantee to the sum of $50,000 for
      stage 1 and $50,000 for stage 2 must be submitted to Council, to secure performance
      of all conditions of this approval, prior to the issue of a Development Permit for
      Operational Works. The cash bond or trading bank guarantee will be returned on
      performance of the conditions of approval less any costs incurred by Council in respect
      of enforcing performance of this permit. Council reserves the right to call upon the bond
      or guaranteed sum to effect compliance with conditions.
      Community Management Statement
39.   Any proposed Community Management Statement required for the development
      pursuant to the Body Corporate and Community Management Act 1997 must be
      submitted to Council for endorsement at the same time as submission of the Building
      Format Plan (or similar) to Council for compliance assessment.
      Sunset Clause for Completion of Approved Development
40.   Pursuant to s88(1) of the Planning Act 2016, the aspects of this development approval
      which have not been completed within 8 years of the date the development approval
      takes effect, lapse.
      Fauna Management
41.   Vegetation must only be removed or disturbed in accordance with a Fauna Management
      Plan (or part thereof) prepared by a qualified person* and endorsed through an
      Operational Works approval and include the following items:
      (a)   The Fauna Management Plan must address and demonstrate compliance with the
            requirements of Schedule 11 Part 2 Section 7 of the Planning Regulation 2017.
      (b)   Identify all koala habitat trees on plan
      *(Refer to Advisory Note)
      Landscaping Works
42.   The development site must be landscaped in accordance with a Council endorsed
      landscape package prepared by a qualified person*. The works must be undertaken in
      accordance with an Operational Works approval, Planning Scheme Policy 3 Landscape
      Plants and Guidelines and must include in particular:
      (a)   Clear integration of the Bushfire requirements for the site, including landscaping
            treatment to the western building setback area using low threat vegetation.
      (b)   Landscaping adjacent to the northern boundary of the subject land within the
            Rufous Street reserve and Rufous laneway to provide a visual buffer to the
            development.
      (c)   3m wide landscaping in the northern building setback area from Rufous Street and
            Rufous Lane to the dwelling units, such landscaping to comprise a combination of
            lawn and vegetation to facilitate a usable “backyard” space.
      (d)   Landscaping to the Rufous Street pedestrian link between dwelling units 13 and
            14.
      (e)   Landscaping to the eastern boundary adjacent the adjoining hotel boundary
      (f)   Landscaping to the Visitor accommodation Type 4 motel building and all other
            Visitor accommodation Type 4 dwelling units.
      (g)   Landscaping to the park areas in the north east and north west portions of the site
      (h)   Details of water quality treatment device plantings




                                         Page 11 of 46

Page 12

      (i)   Details of the landscaping treatment to the western portion of the site between the
            road and the reserve.
      (j)   Details of any fencing and gates, including acoustic fencing, the fencing to the
            shopping centre and the Rufous Street and Rufous Lane and any fencing to the
            western reserve.
      (k)   Details of protection methods to be engaged to protect trees located on the
            northern and southern boundaries.
      (l)   the western boundary of the IGA supermarket development, within that
            development site.
      (m)   Native trees of a minimum bag size of 100L to replace existing trees to be removed
            from the site, at the rate of 1 replacement tree for every tree removed that has a
            diameter greater than 200mm measured at 1.2 metres from ground surface level.
43.   All landscape works must be established and maintained in accordance with the
      approved design for the life of the development, and in a manner that ensures healthy,
      sustained and vigorous plant growth. All plant material must be allowed to grow to full
      form and be refurbished when its life expectancy is reached.
44.   All landscape works must be maintained generally in accordance with the approved
      design for the life of the development.
      Bushfire
45.   All works must be carried out in accordance with a Bushfire Management Plan prepared
      by a qualified person* and endorsed through an Operational Works approval which
      includes:
      (a)   Details in accordance with the Final Negotiated Agreement for Bushfire, dated 18
            October 2018, for Appeal 4066 of 2017 including:
            (i)     Amended drawings demonstrating functional bitumen or concrete one-way
                    4.0 metre wide access for motor vehicles between the western boundary of
                    the IGA site and the eastern landscape edge of the Visitor accommodation
                    Type 4 motel building to Sandpiper Court generally in accordance with
                    Annexure A to the agreement.
            (ii)    Motel Emergency and Evacuation Plan including a Bushfire Preparedness
                    Manual prepared for the annual use of the Body Corporate. This manual
                    must include an evacuation plan that has a training schedule when any fire
                    season reaches “extreme” and a requirement that in the event of a bushfire
                    the motel carpark will be locked preventing guests evacuating by vehicle.
            (iii)   Landholder Information Kit for residential dwellings, which detail landscape
                    treatments, safe egress routes and general bushfire safety
      *(Refer to Advisory Note)
      (b)   Pedestrian emergency access out to the north.
      (c)   Provision of 4 Fire hydrants will be provided along the western access edge. These
            must have both urban and rural fittings suitable for Fire Brigades.
      (d)   Provision of information regarding the functionality of the Bushfire Management
            Plan, if the development is staged.
46.   A copy of the Bushfire Management Plan for the development must be provided to the
      nearest fire authority.




                                          Page 12 of 46

Page 13

47.   Certification must be submitted to Council from a qualified person* prior to
      commencement of the use which certifies that the development has been constructed
      in accordance with the bushfire management conditions of this Decision Notice.
      *(Refer to Advisory Note)
      Environmental Management Plan
48.   An Environmental Management Plan (EMP) for the Site shall be prepared and
      implemented by persons holding appropriate environmental qualifications and proven
      expertise in the preparation and implementation of EMPs, to ensure that the impact on
      the environment of the construction and operation of the Development is minimised, the
      Environmental Values of the Site are protected and enhanced and the Development is
      ecologically sustainable.
49.   The EMP shall be cognisant of the following:-
      (a)   The EMP shall demonstrate a high level of environmental care and responsibility
            and be consistent with best practice for developments of this type in similar
            environments.
      (b)   The EMP shall detail the Developer’s environmental policy and the proposed
            environmental management system for the Site.
      (c)   The EMP shall specify:
            (i)     the performance targets, including those derived from the Conditions and
                    other requirements arising from legislation and other approvals;
            (ii)    how the performance targets are to be achieved;
            (iii)   who is responsible;
            (iv)    when the performance targets will be satisfied;
            (v)     how performance will be monitored;
            (vi)    corrective actions and contingency measures;
            (vii) reporting arrangements;
            (viii) auditing arrangements;
            (ix)    how the requirements are to be incorporated into construction and works
                    contracts;
            (x)     how the Developer’s employees, contractors and the contractor’s employees
                    will be informed and trained with respect to the environmental protection
                    requirements; and
            (xi)    enforcement and penalties for non-compliance.
      (d)   In particular, but without limitation, the EMP shall address the following issues in
            relation to the construction phase:
            (i)     legislative compliance;
            (ii)    soil erosion and sediment control;
            (iii)   vegetation protection;
            (iv)    fauna and fauna habitat protection;
            (v)     weed and pest control;
            (vi)    water quality protection;
            (vii) ground water protection;




                                             Page 13 of 46

Page 14

            (viii) air quality protection;
            (ix)    storage and handling of hazardous substances;
            (x)     noise and vibration management;
            (xi)    waste management;
            (xii) cultural heritage management;
            (xiii) visual amenity protection;
      (e)   In particular, but without limitation, the EMP shall address the following issues in
            relation to the operational phase:
            (i)     legislative compliance;
            (ii)    water conservation;
            (iii)   water quality protection;
            (iv)    maintenance of Stormwater Quality Improvement Devices
            (v)     vegetation protection;
            (vi)    fauna protection;
            (vii) bushfire control;
            (viii) weed and pest control;
            (ix)    biting insects management
            (x)     waste management.
50.   The EMP shall be submitted to Council prior to or in conjunction with the lodgement of
      any development applications for Operational Works for the Site. Operational Works
      approval shall not be granted until the EMP is approved by the Coordinator of
      Environment and Landscape. The Developer shall comply with the requirements of the
      EMP.
Building Demolition/Removal/Relocation
51.   Where the development involves the removal, relocation or demolition of a building, a
      Waste Management Plan (construction and demolition) shall be submitted and approved
      by Council’s Environmental Health Officer prior to issue of a development permit for
      operational works for demolition, removal or relocation of any building other than a shed.
      The purpose of the Waste Management Plan is to facilitate the segregation of waste for
      the effective reuse and recycling of such materials. Segregated wastes attract
      significantly reduced disposal fees at the landfill with some items free. Higher gate fees
      are charged for mixed waste.
      Waste Management Plans (construction and demolition) are required to be submitted in
      accordance with Planning Scheme Policy 11, Waste Management Plans.
      Waste storage areas are to provide for adequate separation of all reusable, recyclable
      and waste materials. These shall be located so that they are convenient and safe to use.
      The Plan shall contain the following information:
      (a)   The site area for the storage and separation of waste is to be shown on the plan
            drawings accompanying the application.
      (b)   A waste management table as indicated below is to be completed showing how
            waste material is to be segregated - recycled – reused or disposed.
      (c)   Table – Waste Management Table.




                                             Page 14 of 46

Page 15

        MATERIALS ON-SITE                                          DESTINATION
                                                      Re-use and Recycling                    Disposal
        Expected waste       Estimated      On-site              Off-site                *specify contractor
        materials            volume(m³)     *specify proposed *specify contractor        and landfill site or
                                            re-use or on-site and recycling outlet       other disposal site
                                            recycling methods
        Excavation
        material
        Green waste
        Bricks
        Concrete
        Timber-please
        specify
        Plasterboard
        Metals - please
        specify
        Asbestos
        Other - please
        specify
      Note * If a demolition contractor is undertaking works, then the Waste Management table is to be
      completed by the demolition contractor.
Waste Storage
52.   The developer must provide waste storage and disposal facilities in accordance with
      Planning Scheme Policy 9, Waste Management, including an external imperviously
      paved area correctly sized for all refuse and recycling containers and suitably screened
      from public places and neighbouring properties.
53.   A bin wash area is required with a cold-water tap, hose and drain outlet connected to
      sewer, via a bucket trap. The drain outlet is to be designed to prevent storm water entry
      to the sewerage system which can be achieved by a bunded area, with a nib wall height
      of 100mm maximum, enclosing a wash area of 700mm x 700mm minimum (max 0.7m²).
      Alternatively, the waste area can be roofed, or any other appropriate design approved
      by Council.
Noise
54.   Upgraded building envelope constructions and the provision of mechanical
      ventilation/air conditioning which achieves the ventilation requirements of the Building
      Code of Australia, in accordance with the Second Joint Report of Experts in Noise (30
      May 2018) for Planning and Environment Court Appeal 4066 of 2017, including:
      (a)   the facades of the Visitor accommodation Type 4 motel building facing towards
            the IGA building and IGA carparking area;
      (b)   the facades of the Visitor accommodation Type 4 dwelling units facing towards the
            IGA building; and
      (c)   the facades of the Visitor accommodation Type 4 dwelling units facing towards the
            hotel building, drive-through access road and drive-through bottleshop, and
            carparking areas.
55.   Prior to the commencement of use written certification is required from a suitably
      qualified person confirming that upgrades to the building facades and provision of
      mechanical ventilation/air conditioning comply with the recommendations of the Second
      Joint Report of Experts in Noise (30 May 2018) for Planning and Environment Court
      Appeal 4066 of 2017.




                                           Page 15 of 46

Page 16

56.   Prior to the commencement of any use or sealing of Plan of Survey, whichever occurs
      first, an acoustic screen must be constructed around the IGA rooftop mechanical plant
      to a height of 3.0 metres above the roof level plant deck, as shown on Figure 4 and
      described in Section 4.6 of the Second Joint Report of Experts in Noise (30 May 2018)
      for Planning and Environment Court Appeal 4066 of 2017.
57.   Prior to the commencement of use of the Visitor accommodation Type 4 dwelling units
      an acoustic barrier along the common boundary of the development site with the
      Peregian Beach Hotel must be constructed. The barrier shall be constructed of materials
      to achieve a minimum surface density 12.5 kg/m2 and a height 2.5 metres above the
      hotel pavement level along the boundary of the site and adjacent to the hotel drive-
      through lane and carparking areas, as shown on Figure 4 and described in Section 4.8
      of the Second Joint Report of Experts in Noise (30 May 2018) for Planning and
      Environment Court Appeal 4066 of 2017.
58.   Written certification is required from a suitably qualified person confirming that sound
      pressure levels from all mechanical plant and equipment within the development site
      comply with the following when measured at the façade of any habitable room or formal
      outdoor area of the Visitor accommodation Type 4 motel building or the Visitor
      accommodation Type 4 dwelling units. Noise levels to be measured as LAeq adj 15min
      where adjustments refer to tonality or impulsivity, in accordance with the most recent
      edition of the Queensland Noise Measurement Manual:
      (a)   Air-conditioning and Refrigeration
            (i)     7am to 10pm: Maximum level allowable = background + 5dB(A)
            (ii)    10pm to 7am: Maximum level allowable = background + 3dB(A)
      (b)   Pumps
            (i)     7am to 7pm: Maximum level allowable = background + 5dB(A)
            (ii)    7pm to 10pm: Maximum level allowable = background + 3dB(A)
            (iii)   10pm to 7am: No audible noise.
      The certification must be submitted to Council prior to commencement of the use, which
      certifies that operational noise from any fixed plant and equipment complies with the
      requirements of this Decision Notice.
59.   Written certification is required from a suitably qualified person confirming that sound
      pressure levels from all mechanical plant and equipment from the existing IGA shopping
      centre comply with the following when measured at the boundary of the newly created
      lot. Noise levels to be measured as LAeq adj 15min where adjustments refer to tonality
      or impulsivity, in accordance with the most recent edition of the Queensland Noise
      Measurement Manual:
      (a)   Air-conditioning and Refrigeration
            (i)     7am to 10pm: Maximum level allowable = background + 5dB(A)
            (ii)    10pm to 7am: Maximum level allowable = background + 3dB(A)
      (b)   Pumps
            (i)     7am to 7pm: Maximum level allowable = background + 5dB(A)
            (ii)    7pm to 10pm: Maximum level allowable = background + 3dB(A)
            (iii)   10pm to 7am: No audible noise.
      The certification must be submitted to Council, which certifies that operational noise from
      any fixed plant and equipment complies with the requirements of this Decision Notice.
      The certification must be provided prior to sealing of the plan of survey or
      commencement of use of the Visitor accommodation Type 4 motel building, whichever
      occurs first.




                                         Page 16 of 46

Page 17

60.   When requested by Noosa Council, a Noise Impact Assessment Report (NIAR) showing
      monitoring and recording of noise levels must be undertaken to investigate any non-
      vexatious complaint caused by noise emissions from operations at the premises. Such
      monitoring must be undertaken and completed within a reasonable and practicable
      timeframe as nominated by Council and be performed by a suitably qualified and
      experienced person.
61.   The NIAR is to be submitted to Council detailing the results of such monitoring and
      recommendations for any measures to achieve compliance with noise emission limits
      set out in Conditions 58 and 59.
RECONFIGURATION OF A LOT
      Approved Plans
62.   Development undertaken in accordance with this approval must generally comply with
      the approved plan listed in the following table unless otherwise amended by these
      conditions.

        Plan No.            Rev.    Plan/Document Name                            Date

        7254 prop sub       C       Proposed Subdivision Plan                     28   February
                                                                                  2019

63.   An underground connection to reticulated water and sewerage must be provided to each
      lot in accordance with the standards and requirements of Northern SEQ Distributor–
      Retailer Authority (Unitywater).
64.   A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
      (Unitywater) must be submitted to Council that certifies an underground connection to
      reticulated water and sewerage has been provided to each lot.
65.   Prior to sealing of the plan of survey the following works must be completed to the
      reasonable satisfaction of Council:
      (a)   The required noise attenuation works to the existing IGA building.
      (b)   All driveway accesses to each lot.
      (c)   All pedestrian pathways.
66.   Any future subdivision of the Visitor accommodation – Type 4 development within Stage
      2 on the approved plans must be a community title scheme building format plan with:
      (a)   the twenty (20) separate lots in the format plan being defined by the footprint of
            each dwelling unit building
      (b)   the balance area of that part of the subject land being included in relevant common
            property, and
      (c)   the curtilage of each of the particular dwelling units being allocated to that dwelling
            unit as exclusive use area.
      Easements
67.   Easement for the purposes of:
      (a)   All stormwater quality treatment devices;
      (b)   Bushfire access;
      (c)   Pedestrian access from the motel (lot 2) to connect to the IGA Shopping Centre
            through lot 3; and
      (d)   Driveway vehicle access to each lot,




                                          Page 17 of 46

Page 18

      must be registered against the titles of the properties in favour of the relevant authority
      and/or property over the land area on the subject site.
68.   Unless otherwise agreed in writing by the relevant service provider, any public or third
      party infrastructure located on the subject site must be placed within an easement
      registered against the title of the property.
69.   All easements must be designed in accordance with the planning scheme and granted
      at no cost to the Grantee. Where the Grantee is Council or a service authority, the
      easement documentation must be in accordance with the Grantee’s standard easement
      terms. Draft easement documentation must be submitted to Council for endorsement.
      Electricity and Telecommunication Services
70.   Reticulated electricity and telecommunication services must be provided to each lot in
      accordance with the standards and requirements of the relevant service provider.
71.   Unless otherwise stipulated by telecommunications legislation at the time of
      construction, the development must be provided with all necessary conduits, pits and
      pipes to accommodate the future connection of optic fibre technology
      telecommunications.
72.   Certification must be submitted to Council from all relevant service providers which
      certifies that the development has met the requirements of this Decision Notice and all
      applicable legislation at the time of construction.


ADVISORY NOTES:
      Building and Construction Industry (Portable Long Service Leave) Levy
73.   The QLeave levy must be paid prior to the issue of a development permit where it is
      required. Council will not be able to issue a Decision Notice without receipt of details
      that the Levy has been paid. QLeave contact: 1800 803 481 (free call) or (07) 3212
      6855.
      Co-ordination of Operational Works Assessment
74.   Additional application fees apply to Operational Work applications where the different
      aspects of the works are lodged separately. Significant savings in application fees will
      result if all works are lodged in a single application.
      Preparation of a Preliminary Construction Management Plan
75.   A preliminary Construction Management Plan must be submitted with the Operational
      Works application and must address the following:
      (a)   traffic management during all aspects of the construction phase including:
            (i)     a Traffic Management Control Plan in accordance with the Manual of
                    Uniform Traffic Control Devices (MUTCD) detailing all temporary signage
                    and traffic control measures prior to construction.
            (ii)    maintenance of safe pedestrian access for the areas affected by the works
                    during and after daily construction has ceased.
            (iii)   proposed fencing to the site during the construction phase of the
                    development.
            (iv)    approval of the Traffic Management Control Plan by the Department of
                    Transport and Main Roads (DTMR) for any works on State controlled roads.
            (v)     provision for worker car parking.




                                          Page 18 of 46

Page 19

      (d)   maintenance and protection of water quality and existing drainage lines through
            the construction site, through the implementation of appropriate erosion and
            sediment control measures.
      (e)   works programme identifying key components of the works and their respective
            durations.
      (f)   establishment of a communication protocol with the general public, adjoining
            owners, emergency services and local businesses to advise of agreed
            construction times, impacts on traffic, services and other relevant issues.
      (g)   identification of complaint management procedures including:
            (i)    contact details for the on-site manager;
            (ii)   dispute resolution procedures.
      (h)   details on the location of external fill sites/sources, the haulage route, type of
            vehicle to be utilised during filling operations and frequency of usage. NB any
            damage to the existing road system as a result of haulage operations shall be fully
            repaired at the applicant’s expense.
      (i)   it is acknowledged that the preliminary Construction Management Plan will be a
            draft document requiring finalisation upon appointment of the Principal Contractor
            employed to construct the works and a final document will be required to be
            submitted at the Pre-Start Meeting for the project.
      Private Infrastructure
76.   All private infrastructure for the development must be designed to meet the planning
      scheme requirements unless otherwise agreed by the relevant authority.
77.   For the purpose of preparing a Landscape Plan, a qualified person is considered to be
      a landscape architect, landscape designer and/or horticulturist with a minimum of 3
      years current experience in the field of landscape design.
78.   For the purpose of preparing a Fauna Management Plan, a qualified person is
      considered to be an ecologist with a minimum of 3 years current experience in the field
      of fauna assessment and management.
79.   For the purpose of preparing a Bushfire Management Plan, and for certifying compliance
      with the bushfire requirements of this Decision Notice, a qualified person is considered
      to be an ecologist with a minimum of 3 years current experience in the field of bushfire
      assessment and management.
80.   For the purpose of preparing a Hydrological plan, and for certifying compliance with the
      hydrological requirements of this Decision Notice, a qualified person is considered to be
      a hydrologist with a minimum of 3 years current experience in the field of hydrological
      assessment and management.
      Infrastructure Charges
81.   This Development Permit will not trigger an “Infrastructure Charge Notice” to be issued
      in accordance with Council’s “Charges Resolution” made pursuant to the planning
      legislation and regulations current at the time of issue.
ENVIRONMENTAL HEALTH ADVICE
      Building Works
82.   Noise from residential building works shall comply with the following:
      (a)   Limited to between 6:30am to 6:30pm Monday to Saturday.
      (b)   All reasonable measures are taken to minimise noise emissions




                                         Page 19 of 46

Page 20

      (c)   Not permitted on Sunday or public holidays.
      Measurement of Noise
83.   Measurement of sound pressure levels (adjusted for tonality and impulse) must be in
      accordance with either:
      (a)   Australian Standard AS1055.1 “Acoustics–Description and measurement of
            environmental noise – General procedures”, or
      (b)   The relevant “Noise Measurement Manual” as provided by the Department of
            Environment and Heritage Protection.
84.   A qualified person is considered to be either:
      (a)   a Registered Professional Engineer of Queensland, or;
      (b)   an environmental consultant with a minimum of 3 years current experience in the
            field of acoustics.
      Environmental Protection
85.   The development should be undertaken in a manner that causes no unlawful
      environmental nuisance under the Environmental Protection Act 1994 by the creation of
      excessive noise, lighting, waste, atmospheric pollutants (including dust or odours) or
      other releases to the environment.
86.   In accordance with the Environmental Protection Act 1994, all sand, silt, mud, paint,
      cement, concrete, builder’s waste or other prescribed contaminants should not to be
      released to or be placed where it could reasonably be expected to move into a roadside
      gutter, storm water drain or a watercourse. On the spot fines apply for such offences.




                                        Page 20 of 46

Page 21

Page 21 of 46


[OCR of page images]
RUFUS STREET ~- eS 2 c\emy —_ oO
PUBLIC PRECINCT ecru

Ha rie

PEREGIAN VILLAGE MARKETS =

be} pbb

 

YD preppoos soanien®)

REVISION 4 16.04.19 REVIEW ISSUE
WWW.RDARCH.COM.AU 180082 sae 431000 APRIL '19 PAL ENA N Assn \e NTS tee ste Syd LOCATION / SITE PLAN

       
   

    
 
  

Page 21 of 46

Page 22

Page 22 of 46


[OCR of page images]
TWh

PUBLIC AMENETIES Vp steel ee

y — es Vistas 5 ro
RUFOUS LANE VEHICULAR & Wa ; r

= FEDESTMNETWORG iy SIDENTIAL

ea!

 

om oon RUFOUS STREET

aon: PUBLIC PRECINCT * ¢

aS oe .
OCKET |< STING CHILDCARE
ARKING ~ TOREMAI

“a
» 2m WIDE CONCRETE PATH TO
PEDESTRIAN LINK TO LANEWA
& THROUGH TO

HIGH ACOUSTIC

he 5

AN LINK |
(US ST PRECINCT |

PEREGIAN BEA

Po fe ) ee ! oe | |

REVISION 4 16.04.19 REVIEW ISSUE
WWW,RDARCH.COM.AU 180082 seatt 4: 500 dt a] 245 DAVID LOW WAY, PEREGIAN BEACH tal (e eda Ala (ea Shik} SU ame Ng

 

  

       

Page 22 of 46

Page 23

Page 23 of 46


[OCR of page images]
~visible from the ror —— ——

 

3000

        
          
    
 
 
  
   

 
 
 
    

 
   
    
     
  

4 =. ~ “Not visible from the north’
= = . |Al = “ : = " =
Ss ; Ss w 2 s ==
4000
- Wallum (BY
\ at
I ,
le -
S|
2
2)
1g 1
3 \
pms
eg
\ ‘2m Wide Concrete , = At 4 is
\ \ \ to Pedestrian link to fi oS pa k Ne
Rufous St precinct for units 14-16 :
|<—_——2500mm HIGH
ACOUSTIC FENCE

 
  

bins bins

   
 
 
 

 
 

Zz.
Ss
a

INTERNAL
PRIVATE
ROAD

 
  
   
 
           

 

 

     

     

  

 
 
       
 
 
 

  
 
    
   
 
  
 
  

(ey
a.
ps
INTERNAL {Dd
_\ private (2
I ROAD _VIS. Cars
“Ss
A——Screened 10x ua 7}
AIC condensers 2m Wide Concrete i ——— — |
Path Pedestrian r eal |
MERGENCY EGRESS pte ros | |
Sale ROAD
Cir oakidtr og) SPECIALTY SHOPS |
2S wa cassie |
IGA —__—— = |
|
|
|
|
A CARPARK r of
{ |
/
|
|
SHOPPING CENTRE
ii soe PEREGIAN VILLAGE MARKETS | |
—— (
/ 7, O

    

16.04.19 REVIEW ISSUE

 

REVISION
Sit) SITE / FLOOR PLAN

   
           

Access and service easement
ESSENCE OF PEREGIAN BEACH

    

Pa VA Nase

( I ) R scanlon ®
Ko f | E D 7 group
Page 23 of 46

WWW.RDARCH.COM,AU

   

APRIL '19

   

SE)

 

7d

        

Page 24

Page 24 of 46


[OCR of page images]
 

WWW,RDARCH.COM,AU

{ jal

180082

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
  

 

  
 
 

 

 

 

 

 

 

‘Screened

 

   

Easement

 

 

 

 

AJC condensers

Easement

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  
 

 

IGA

PEREGIAN VILLAGE MARKETS

 

 

 
  

215 DAVID LOW WAY, PEREGIAN BEACH

Page 24 of 46

hse ec aaa

 

 

 

SPECIALTY SHOPS

16.04.19 REVIEW ISSUE
SUMS cele)

REVISION

 

Page 25

Page 25 of 46


[OCR of page images]
CY preo

 

  

WWW.RDARCH,COM.AU

scanlon (4
group

180082

 

 

 

ea

 

 

 

 

 

 

 

 

 

 

 

 

APRIL '19

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Easemert

 

 

 

 

 

Screened
AIC condensers

215 DAVID LOW WAY, PEREGIAN BEACH
Page 25 of 46

    

‘shir.

 

 

 

 

 

 

 

 

 

 

Easement

SS) ea dase ale

 

 

 

REVISION
$006

 

   
  

         

4
Sale a ae

 

 

eS fe,

16.04.19 REVIEW ISSUE

22

  

    

 

Page 26

Page 26 of 46


[OCR of page images]
 

 

 

 

 

{Bs

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Easement

 

 

 

 

 

 

Lit Over run

 

 

 

|
|
|
|

Easement

—

 

 

WWW.RDARCH,COM,AU

 

 

 

 

215 DAVID LOW WAY, PEREGIAN BEACH

 

Page 26 of 46

 

 

s

16.04.19 REVIEW ISSUE

eC le SITE / UNIT BUILDING ROOF PLAN

Page 27

Page 27 of 46


[OCR of page images]
SETBACKS VARY ACROSS THE SITE IN
RESPONS= ~O LOT SHAPE AND SIZ=

©

|

|

|

!
=
a

|

|

|

|

 

 

 

 

  
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

| | |
| | |
Mi Me ESM nity | Aj i ,
i | | + |
| | + |
' ° \ °
\ | | |
' if ff i
i 7 1 |
| Pye 1 |
i | 1 oat \ |
1
i 5 Ay }
1 | toma }
-_ | oy
; Wa \
:  y \
t | Fell }
Qo 1! =—- po!
I —
| —
! -
—
| —
= ==
|
|
|

 

 

 

LEVEL 1
FLOOR AREA - 69m?

Scale 1:100

GROUND FLOOR PLAN ROOF
FLOOR AREA (inc, garage}-100m’Scale 1:100 Scale 1:100
COURTYARD -10m?

Perneter 40000m
600mm Overhang — 38600m = 84%

 

No Overnarg 6400m = 16%

KAMALA

MATERIAL CHANGE OF USE DEVELOPMENT

Page 27 of 46

APPLICATION DRAWINGS

67-7

REV CESCRP TION DRM DATE
A ISSUE FOR MCU DA APPROVAL DOT 2012.16
B ISSUE FOR INFORMATION DDT 07.03.17

C ISSUE FOR RFi RESPONSE DDT 22.03.17
D ISSUE FOR MCU DA APPROVAL REVISIONS DDT 07.03.18
E ISSUE FOR MCU DA APPROVAL REV, DDT 11,05.18
F PRELIMINARY ISSUE FOR INFORMATION DDT 18.05.18
G ISSUE FOR MCU DA APPROVAL REVISIONS DDT 24.05.18

Y

scanion group

ESsEnce

of peregian beach

 

architects

SUNCOAST RESORT BUSINESS CENTRE

SUITE 2 CNR GARDAK ST & SURF RD
ALEXANDRA HEADLAND: Qld 4572
PO BOX 6232 MAROOCHYDORE BC Qld 4558
PH : 07 5443 5028 FAX.07 5479 2380
ABN ‘23423 917 724
MAR admin@sproutarch,com.au

project

ESSENCE OF PEREGIAN BEACH
DEVELOPMENT

for

THOMCO (NO 2087) PTY LTD

Lots 1 on SP286680
215 DAVID LOW WAY

PEREGIAN BEACH
——
drawing

KAMALA PLANS

AS SHOWN
@A3

drawing ne. 16003 SDOBrevsion G

date 24/05/2018 drawn DDT scale

Lrgoagt of Oe dacawrt arsuna te enihane
4 SPNOUT ARLESTECTS ET LID
23.123 017 Ta4,

Coeds ne to wants arenes above
sie poe to commencing. Repad al decrepancses fo
tha Arch tact. Use tgured dmansiona m prferenca

‘oscalod,

Page 28

Page 28 of 46


[OCR of page images]
 

a

5

oa

qy

a

3

q

4

¥ Ground RL.0.000 fd

te J
(3 ELEVATION
Yo

4

Celling RL.5.400

8

a vertical cladding =
g

a First RL, 3.000

q ¥ First AL. 3.

3

Do

feature ertry
gate rouse
J Vv Gourd AL 3.0

 

Scale 1:100

Scale 1:100

C) TELEVATION

KAMALA

MATERIAL

CHANGE

oO

F

 
 
 

 

 

  

 

 

 

 

 

U

Ss

  

E

feaiure window
metal hoods

aluminium ‘ramed
glazing

feature render lo
back of house

 
 

feature
metal

 

DEVELOPMENT

 
 
 

6900 Builcing Height

 

EY DEBCRPRON

A ISSUE FOR MCU DA APPROVAL
B ISSUE FOR INFORMATION

C ISSUE FOR RFIRESPONSE

D ISSUE FOR MCU DA APPROVAL REVISIONS DDT
E ISSUE FOR MCU DA APPROVAL REV, DDT 11,05.18
FE PRELIMINARY [SSUE FOR INFORMATION DDT 18.05.18
G ISSUE FOR MCU DA APPROVAL REVISIONS DDT 24.05.18

  

feature window
metal hoods

 

 

 
 
 
  

  

 

 

WUT | |

TTT pSemISn group

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Ceiling AL. 5.40

    
 
 
  
  

aluminium ‘ramed
glazing

 

 

 

Sssence

covered courtyard of peregian beach

  

 

Ground ALLY
iy

(4 ELEVATION
Kg Scale 1:100
ae aluminium framed

6900 Building Heian

 

 

  
  
 

glazing Scale 1:100

Ceiling RL.6.400.

  

rendered fibre
cement sheet

 
 
 

Frrst RL. 8,000

 
  
  
  

architects

SUNCOAST RESORT BUSINESS CENTRE
SUITE 2 CNR GARDAK ST & SURF RD

    

 

feature render to ALEXANDRA HEADLAND : eF 4572
‘ PO Bi MAROOCHYDORE Bi 4558
back of house FAX.07 6479 2380

  
 
  
  

PH ; 07 6443 5028
ABN 23.123 917 724
EMAII [email protected]

tt

project
ESSENCE OF PEREGIAN BEACH
DEVELOPMENT

for

THOMCO (NO 2087) PTY LTD

“\ 2 ELEVATION m
AG Scale 1:100 Lots 1 on SP286680

= 215 DAVID LOW WAY
PEREGIAN BEACH

drawing

KAMALA ELEVATIONS

 

AS SHOWN
date 24/05/2018 drawn DDT scale — @A3

drawing ne. 16003 SDOQrevisen G
i F

Canyig of wa mens cemnars ti exch
‘propery of SPROUT ARCHITECTS PTY LTD.
‘ABN 23 123 947 724,

Cotrmtene we ta oarty a bee ences eters et
{fe poot to commencing. Repoa all xcrepancies 10

the Archiecl. Use fgurad dmonsions in prolaronce,

lescaled,

APPLICATION DRAWINGS

Page 28 of 46

Page 29

Page 29 of 46


[OCR of page images]
nev beBCHI TION OnM DATE

    
 
  

 

 

  

 

 

     
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

eee oes 4
A ISSUE FOR MCU DA APPROVAL ODT 20.12.06
B ISSUE FOR INFORMATION DOT 07.03.17
C ISSUE FOR RFIRESPONSE DDT 22.03.17
D ISSUE FOR MCU DA APPROVAL REVISIONS DDT 07.03.18
E ISSUE FOR MCU DA APPROVAL REV, ODT 11.05.18
4 G ISSUE FORHCU DA APPROVAL REVISIONSODT Seas
SETBACKS VARY AGROSS THE SITE IN
RESPONSE 7O LOT SHAPE AND SIZE & & ®
I I scanlon group
| | - -
a... | |
| oo 6 T | |
& Fal ; :
ae 82 —s | |
b
( pt | esoonce
i 4 tr Ae | |
a . : i
| a WE oon | | of peregian beach
Dining ee |
ae — | | | j
) | Rate | | |
u CPD rear ty Ge © '
pee enees 4 |
, is 1 Beep Bath | f
L | : to0d a |
fe cpa ! |
¢) ir Robe { ; ;
f al |
il & j Bedroom 2 - b=
i: | 8 I |
a | & i $ |
7 }
{\ com . | |
iN tl : ff i,
— — ‘ | | ETE S
= —— - == ‘ : -
(a I | |

 

 

 

{ joa er pl J ee re _..th ap ehieecie

RESORT BUSINESS — CENTRE
SUITE 2 CNR GARDAK ST & SURF RD
ALEXANORA HEADLAND QId 4572

PO BOX 6232 MAROOCHYDORE BC Qid 4558

PH: 07 5443 5028 FAX:07 5479 2380
ABN (73123 917 724
EMAIL: [email protected]
SS
GROUND FLOOR PLAN LEVEL 1 ROOF projet
FLOOR AREA (inc, garage)-97m? Scale 1:100 FLOOR AREA - 74m? Scale 1:100 Scale 1:100 ESSENCE OF PEREGIAN BEACH
COURTYARD -1 1m? DEVELOPMENT
SITE AREA -160m? ‘er

THOMCO (NO 2087) PTY LTD
Permeter 41820m m4
600mm Overhang §— 33010m = 79% Lots 1 on SP286680

215 DAVID LOW WAY
ee = No Overrarg 8810m = 21% PEREGIAN BEACH

 _
drewing

MARRAM PLANS

AS SHOWN
date 24/05/2018 drawn DDT scale  @A3
i |

Cheprept of tox serena weraing te exits
property of SPROUT ARCHITECTS PTY LTD.
ABN 23 123 917 724.

Cortentors a tn wet a8 cavemtaary wr hove or
Speen escoepaniae te

lntyriaseueeepacee 7) /”
MATERIAL CHANGE OF USE DEVELOPMENT APPLICATION DRAWINGS = LG
Page 29 of 46

Page 30

Page 30 of 46


[OCR of page images]
Catling RL, 6.400

aluminiaeny
framed winoo:

2406

2,

First AL

6554 Buildine Height

aluminium
=] lramec win

rendered fibre

 

C 3 ELEVATION

Scale 1:100

‘Ceiling RL. 5.400_.
fibre cement sheet
with cover battens

ont

vertical lightweight cladding 4

Hi

irs

First RL. 3,000

 

6554 Bi

aluminium
framed windows

rendered fibre
cernen: sheeting

Ground RL. 0,

1 ELEVATION __
\ Scale 1:100

 

 

 

winciew hood

   

 

 

6554 Building Height

 

(__\4 ELEVATION
ae Scale 1:100

 

Ne
Ceiling RL.5.400__
alumni
tamed
£ br
a
a
: iii | Ss
a
NI :
tH THEE ‘g
bs
cles
cen NM
se

 

3 2 ELEVATION

MARRAM

MATERIAL

CHANGE OF USE

atv ceScRPTION RN DATE
A ISSUE FOR MCU DA APPROVAL DDT 20.12.16
B ISSUE FOR INFORMATION DDT 07.03.17
C ISSUE FOR RFI RESPONSE DDT 22.03.17

D ISSUE FOR MCU DA APPROVAL REVISIONS DDT 07.03.18
E ISSUE FOR MCU DA APPROVAL REV. DDT 11.05.18
F PRELIMINARY ISSUE FOR INFORMATION DDT 18.05.18
G ISSUE FOR MCU DA APPROVAL REVISIONS DDT 24.05.18

 

 

 

Scale 1:100

DEVELOPMENT

Page 30 of 46

scanion group

 

 

 

 

 

 

 

 

 

 

essence

of peregian beach

Scale 1:100

 

 

 

 

 

5 croak architects

— SUNCOAST RESORT BUSINESS CENTRE
SUITE 2 CNR GARDAK ST & SURF RD

= ALEXANDRA HEADLAND Qld as72

PO BOX 6232 MAROOCHYDORE BC Qid 4558

oe PH OF 5449 6025 FAXOT S479 2300
23123 917 724
[email protected],au

 

 

=— + ABN
— EMAIL

2 project
a ESSENCE OF PEREGIAN BEACH
DEVELOPMENT

fer
THOMCO (NO 2087) PTY LTD

Lots 1 on SP286680

215 DAVID LOW WAY

PEREGIAN BEACH
————_

drawing

MARRAM ELEVATIONS

AS SHOWN
date 24/05/2018 drawn DDT scale  @A3

srawing °.16003 SDLArevisen GE

ya act imme ie
rapey werner sacimecre en

Sed erro

Cami wo vay Seon reo
Soprorosma nope aGrecmate CY =
rekeniod Untgreicrmsectipatone “5
DRAWINGS a

APPLIC AT I‘O.N

Page 31

Page 31 of 46


[OCR of page images]
AFY CESCRPTION fie ATE

——
A ISSUE FOR MCU DA APPROVAL ODT 20.42.98
B ISSUE FOR INFORMATION DDT 07.03.17
¢ ISSUE FOR RFI RESPONSE DDT 22.03.17

D ISSUE FOR MCU DA APPROVAL REVISIONS DDT 07.03.18
E ISSUE FOR MCU DA APPROVAL REV, DDT 11.05.18
F PRELIMINARY ISSUE FOR INFORMATION DDT 18.05.18
G ISSUE FOR MCU DA APPROVAL REVISIONS DDT 24.05.18

g )

scanlon group

SETBACKS VARY ACROSS THE SITE IN
RESPONSE TO LOT SHAPE AND SIZE

Entry Gatehouse
& Letertox

Bi a €SSENCE

| } fh of peregian beach
i =, —— | | = f n

  

 

 

 

 

 

Driveway

 

 

Kitcher|

 

 

 

 

Ne —

ae eee Se

oroperty boundary —
architects
SUNCOAST RESORT BUSINESS _ CENTRE
Ground Level Floor Plan SUITE 2 CNR GARDAK ST & SURF RD
LOOR AREA {inc. garage)-147m? Scale 1:100
COURTYARD & VERANDAHS-26m?

RY

   

ALEXANDRA HEADLAND Qld 4572
PO BOX 6232 MAROOCHYDORE BC _ Qld 4558
PH: 07 8443 5028 FAX.07 $479 2380
“347m? ABN 23.123 917 724
SHEARER St my (COT.20) EMAL [email protected]
project
ESSENCE OF PEREGIAN BEACH
DEVELOPMENT

THOMCO (NO 2087) PTY LTD

Lots 1 on SP286680
215 DAVID LOW WAY
PEREGIAN BEACH

 

drawing

SALTBUSH HOUSE PLANS

AS SHOWN

date 24/05/2018 drawn DDT scale @A3
S T i U S i drawing 0.16003 SDA2revsien GE
A\ See

tat war vend Ihe auc
frorety ct SPROUT ARCHITESTS PY UTD
ABN 23.123 917 724,

Eamamces 909 sot) brewer

MATERIAL CHANGE © F USE DEVELOP MEN TF APPLICATION DRAWINGS a 1g
Page 31 of 46

Page 32

Page 32 of 46


[OCR of page images]
ABV SescRPnON OnM CATE
A ISSUE FOR MCU DA APPROVAL DDT 20.12.10

. . _ B ISSUE FOR INFORMATION DDT 07.03.17

property boundary — ab C ISSUE FOR RFI RESPONSE DOT 22.03.17

sa a ee ee me a oper ng rece 9 pein es acto SE SS SS Fe Se 5 + Se + Seg coe eS Se eS es ep D ISSUE FOR MCU DA APPROVAL REVISIONS DDT 07.03.18
E ISSUE FOR MCU DA APPROVAL REV, DDT 11.05.18

F PRELIMINARY ISSUE FOR INFORMATION DDT 18.05.18

G {SSUE FOR MCU DA APPROVAL REVISIONS DDT 24.05.18

fe Sa eh ee se oe

 

 

 

 

 

 

. | »)
|

| scanlon group

—_=
Fall

1 essence

of peregian beach

|
|
|
|
|

 

 

 

 

 

| |

|

|
|
| @|
i !
|
|

{ ey \ Roof Plan property boundary. = > Perimeter 69480
Scale 1:100
weeeeeee 600mm Overhang  46160m = 78%

eeeecen= No Overhang 13320m = 22%
property boundary
| | Scale 1:100

| | TT eee...

  

 

 

| Nt il 15 — 5 i | |
i i % . !
|

  

 

 

 

architects

SUNCOAST RESORT BUSINESS CENTRE

SUITE 2 CNR GARDAK ST & SURF RD
ALEXANDRA HEADLAND Qld 4572
PO BOX 6232 MAROOCHYDORE BC Qld 4558
PH : 07 5443 5028 FAX.07 5479 2380
ABN 29123917 128
‘EMAIL: admin@sproutarch,com.au

 

 

 

project
ESSENCE OF PEREGIAN BEACH
DEVELOPMENT

tor

THOMCO (NO 2087) PTY LTD

property boundary <> PEREGIAN BEACH

|

|

|

]

|

|

]
J Se i
ge gp geen SER

drawing

SALTBUSH HOUSE PLANS

( : Level 1 Floor Plan
FLOOR AREA -108m? Scale 1:100
BALCONIES - 9m dete 24/05/2018 drawn DDT scale gan”

G

| T B U S ml drawing 2.16003  SDAZreviswoa
$A
perenne ad
33 123 907 78

Cintas a0 90 504') Beever ed Rh or
ste proto commencing Repon aascrepences fo

the Arch ac. Use Sgure manson in pretorence oY
tovcald,

MATERIAL CHANGE OF USE DEVELOPMENT APPLICATION DRAWINGS
Page 32 of 46

Page 33

Page 33 of 46


[OCR of page images]
    

Metal sheet roofing =

Patrontel ligntweigh:

W oiwery A
20400

idx screen

  

"rendered block wall
fo boundary

1 ELEVATION

CO 4 ELEVATION E }
Scale 1:100

~

mt

REY DESCRIPTION OWW OAT
A ISSUE FOR MCU DA APPROVAL DDT 20.12.16
B ISSUE FOR INFORMATION DDT 07.03.17
C ISSUE FOR RFI RESPONSE DDT 22.03.17

D ISSUE FOR MCU DA APPROVAL REVISIONS DDT 07.03.18
E ISSUE FOR MCU DA APPROVAL REV, DDT 11.05.18
F PRELIMINARY ISSUE FOR INFORMATION DDT 18.05.18
ay G ISSUE FOR MCU DA APPROVAL REVISIONS DDT 24.05.18

V
scanlon group

icad llahtweight
aing

 

na

 

 

 

al Boren

essence

of peregian beach
i rendered block wall
to boundary

\ OPTION FACADE LOTS 19 & 17

Scale 1:100

 

 

miatal sheet rootin

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

metal sheet soofing

Scale 1:100

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

¥ Joinery a
20400,

ry
ean Eh

  

Perit atest
ior batians

 

 

 

 

 

SRUMINLeN frat
gi

Scale 1:100

( 5 2 ELEVATION

SALTBUSH

MATERIAL CHANGE OF USE DEVELOPMENT

Page 33 of 46

 

fibre Serie
iesneeting

a

SUNCOAST RESORT BUSINESS CENTRE

SUITE 2 CNR GARDAK ST & SURF RD
ALEXANDRA HEADLAND Qld 4572
PO BOX 6232 MAROOCHYDORE BC Qld 4558
PH : 07 5443 5028 FAX:07 5479 2380
ABN 23123 907 124
EMAIL [email protected]

_ Aluminium traned
glazog

project
ESSENCE OF PEREGIAN BEACH
DEVELOPMENT

for
THOMCO (NO 2087) PTY LTD

Lots 1 on SP286680
215 DAVID LOW WAY
PEREGIAN BEACH

drawing

SALTBUSH HOUSE ELEVATIONS

AS SHOWN
date 24/05/2048 drawn DDT scale @A3

drawing nc. 16003 SD14revision G

appara Yee doctowert reraia fue auctor
sugety od tomo acHIMeeTE Sy LTD
MPC AN WAT 24,

Gases ou tony Mi crremn thoi oe
ree o commencing. Report a discrepancies to

APPLICATION DRAWINGS — 30

Page 34

Page 34 of 46


[OCR of page images]
al sreeat mating

 

 

 

 

 

 

 

 

 

_
| ae Camant sheet
'¥ Janery AL nim hee bailens
20400
lL i a NM ned
HI hte ‘
v:
wamed
K- rendered fibre
Go rb Shanna
el
bl
3 ELEVATION
Scale 1:100

   
  

horizontal lightweight

hi Df
metal sheet roofing cladding

   
 
 
 
 
 
   
 
  
  
 

 

metal sheet roofing

framed

sheet
cover beliens

fibre
sneeting

aluminium traned
glazrg

 
   

___ aluminium framed
glaz-g

f 4 ELEVATION

 

SALTBUSH

MATERIAL CHANGE OF USE DEVELOPMENT

Page 34 of 46

CATION

AP PE! DRAWINGS

Ary NCECRIFTOW ORY DATE
A ISSUE FOR MCU DA APPROVAL DDT 20.12.16
B ISSUE FOR INFORMATION ODT 07.03.17
C ISSUE FOR RFI RESPONSE DDT 22.03.17

D ISSUE FOR MCU DA APPROVAL REVISIONS DDT 07.03.18
E ISSUE FOR MCU DA APPROVAL REV. DDT 11,05,48
F PRELIMINARY ISSUE FOR INFORMATION DDT 18.05.18
G ISSUE FOR MCU DA APPROVAL REVISIONS DDT 24.05.18

scanion group

ESSENCE

of peregian beach

Scale 1:100

 

architects
SUNCOAST
SUITE 2 CNR GARDAK ST & SURF ROD

RESORT BUSINESS CENTRE

ALEXANDRA HEADLAND Qld 4572

PO BOX 6232 MAROOCHYDORE BC Qld 4558

PH: 07 5443 5028 FAX.07 $479 2380

NaN 29 028 gN7 724

EMAIL, [email protected]
Project

ESSENCE OF PEREGIAN BEACH
DEVELOPMENT

for
THOMCO (NO 2087) PTY LTD

Lots 1 on SP286680
215 DAVID LOW WAY
PEREGIAN BEACH

drawing

SALTBUSH HOUSE ELEVATIONS

 

AS SHOWN
date 24/05/2018 drawn DDT scale @A3

drawing 0.16003 SD15revsion G

agape ft ovewert wremes fee euikutier
Fegaey of SPROUT ANSITECTS PTY LID.
M813 120 WT Tae,

Canta bss outa we) aera wa ath
Ste poor fo commencing. Report ak discrepancies 10s
the Archit Use fred dmansions in protrace
toa

Page 35

Page 35 of 46


[OCR of page images]
ATV DEBCRPTION ORM. NATE

eo tt
A ISSUE FOR MCU DA APPROVAL DDT 20.12.16
B ISSUE FOR INFORMATION DDT 07.03.17
C ISSUE FOR RFI RESPONSE DDT 22.03.17

D ISSUE FOR MCU DA APPROVAL REVISIONS DDT 07,03,18
E ISSUE FOR MCU DA APPROVAL REV, DDT 11.05.19
F PRELIMINARY ISSUE FORINFORMATION DDT 18.05.19

G ISSUE FOR MCU DA APPROVAL REVISIONS DDT 24.05.18
SETBACKS VARY ACROSS THE SIT= IN
RESPONSE TO LOT SHAPE AND SIZE prooe+y boundary

Baa SS cae! cima? Y

scanlon group

 

 

 

 

 

 

| ESSENCE

q a] ! of peregian beach

==

robe

vv

7

pees ini

 

iy th E | Scale 1:100

   

 

YP ; oe F ! architects

rs — aa eee SUNCOAST RESORT BUSINESS CENTRE
Ny SUITE 2 CNR GARDAK ST & SURF RD
properly boundary ALEXANDRA HEADLAND Qld 4572

PO BOX 6232 MAROOCHYDORE BC Qld 4558

PH: 07 5443 6028 FAX:07 5479 2380
ABN 23123 a17 ra.
<> EMAIL: [email protected]
—————— +
GROUND FLOOR PLAN project
FLOOR AREA (inc, garage)-134m*Scale 1:100 ESSENCE OF PEREGIAN BEACH
COURTYARD -22m?

DEVELOPMENT
SITE AREA -308m? (LOT 9) for

THOMCO (NO 2087) PTY LTD

 

 

 

 

 

 

Lots 1 on SP286680
215 DAVID LOW WAY
PEREGIAN BEACH
drawing

LILY HOUSE PLANS

 

AS SHOWN
date 24/05/2018 drawn DDT scale  @A3

drawing no. 16003 SD1AGrewsicn G
|}
uve

Copy ata dacenes vera te

property of SPROUT ARCIATECTS PTY 11D.

ABN 23 123 917 724,

Cee nts op to ver allcivera'cas wet bole
‘ke prc to-contmencing. Repo all kscrepaneses 0.
the Ach tact Uso figured d mensions in preference

MATERIAL CHANGE © F USE DEVELOPMENT APPLICATION DRAWINGS “ a:
Page 35 of 46

Page 36

Page 36 of 46


[OCR of page images]
 

_>\ FIRST FLOOR PLAN
FLOOR AREA - 68m? Scale 4:100

LILY

MATERIAL CHANGE

@ F

U

Ss

E

ROOF PLAN
Scale 1:100

DEVELOPMENT
Page 36 of 46

@

 

©

Perneter 44700

eee eeee 600mm Overharng —41800m = 94%
weeeeee= No Overrarg 2900m = 6%
APPLICATION DRAW

EY OScurTON BRR GATE
A ISSUE FOR MCU DA APPROVAL ODT 20.12.16
B ISSUE FOR INFORMATION DDT 07.03.17
C ISSUE FOR RFI RESPONSE DOT 22.03.17

D ISSUE FOR MCU DA APPROVAL REVISIONS DDT 07.03.18
E ISSUE FOR MCU DA APPROVAL REV. DOT 11.05.18
F PRELIMINARY ISSUE FORINFORMATION DDT 18.05.18
G ISSUE FOR MCU DA APPROVAL REVISIONS DDT 24,05.18

{ »)

scanlon group

ESSENCE

of peregian beach

Scale 1:100

 

architects
——“SUNCOAST RESORT BUSINESS CENTRE
SUITE 2 CNR GARDAK ST & SURF RD

ALEXANDRA HEADLAND Qld 4572
PO BOX 6232 MAROOCHYDORE BC _ Qld 4558
PH: 07 5443 5028 FAX.07 5479 2380
29129997 724
EMAIL: [email protected]
Project
ESSENCE OF PEREGIAN BEACH
DEVELOPMENT
few

THOMCO (NO 2087) PTY LTD

Lots 1 on SP286680
215 DAVID LOW WAY
PEREGIAN BEACH

 

drawing

LILY HOUSE PLANS

AS SHOWN
date 24/05/2018 drawn DDT scale  @A3

drawing ne. 16003 SDA7revsien G

Copmrege of Bu dncriel mean he exctann
Faapedy of SPROUE AACRATECTS PTYLTD.
PN ED AD) OT 2M,

Conerncsien io te iefy fl orereung an devel rt
Se phar to commencing. Rapor ell Gscrepancies 10
the Arch tot. Use tgurad dmentione in preference

INGS =a

Page 37

Page 37 of 46


[OCR of page images]
Hey SescurnON RN DATE

ot
A ISSUE FOR MCU DA APPROVAL DOT 20,197.16
B ISSUE FOR INFORMATION DDT 07.03.17
C iSSUE FOR RF] RESPONSE DDT 22.03.17

D ISSUE FOR MCU DA APPROVAL REVISIONS DDT 07.03.18
E ISSUE FOR MCU DA APPROVAL REV. DOT 11.05.48
F PRELIMINARY ISSUE FOR INFORMATION DDT 18.05.18

 

 

   

 

 

 

 

 

 

 

 

 

 

 

Sy weS2<%) — GISSUE FOR MCU DA APPROVAL REVISIONS DOT 24.05.48,
- rendered flors'
cement {
- vary 3 ' ~#
3 wy
cd vera a canlon group
= pee bit i EET i Sisk} cladding
Nar i Joinery RL.
a feature battat,
s
“I
F; TAT | :
) SSENCE
ca %
i :
a ! ; > of peregian beach
a
| i i Ground. : “fy
| 2 0.000 all ~
aluminium framed aluminium framed
glazing glazing

Zz 3 ELEVATION

\ Scale 1:100

Scale 1:100

C } 4 ELEVATION

   

  
 
 

  
  

feature batien
Screen

hoszontal lightweight

cladding Scale 1:100

   
  

   

7 Janery AL
sluminnga

Joinery 5.450

    

     
   

architects

| SSUNCOAST RESORT BUSINESS _ CENTRE
|SUITE 2 CNR GARDAK ST & SURF RD

/198 Building Heiaht

e ALEXANDRA HEADLAND Qld 4572
fire 2 PO BOX 6232 MAROOCHYDORE BC Qld 4558

A PH : 07 5443 5028 FAX:07 5479 2380
cement sheeting ABN 23.123 GIT 124
. EMAIL: [email protected]

 

 
 

SLE project
ee ees = ESSENCE OF PEREGIAN BEACH
DEVELOPMENT

aluminium framed rencered block wall for

giazirg to boundary THOMCO (NO 2087) PTY LTD

(2 ELEVATION “
Scale 1:100 Ki Scale 1:100 Lots 1 on SP286680
— 215 DAVID LOW WAY
PEREGIAN BEACH

drawing

LILY HOUSE ELEVATIONS

 

 

 

   

 
  

vertical Ightweignt cladding aluminium framed glazing

 

(-} ELEVATION

 

AS SHOWN
date 24/05/2018 drawn DDT scale  @A3

drawing 0.16003 SDAGrevsion G
eo
Capyngh tna dene coninn te exikeve

‘property of SPROUT ARCHITECTS PTY L110,
‘ABN 23 125.917 724.

Covwractorn ws to wok all rennin ora ve wot
se press comrancing Raper daurepnies

MATERIAL CHANGE O F USE DEVELOPMENT APPEL te AST k ON DRAWINGS = 34
Page 37 of 46

Page 38

Page 38 of 46


[OCR of page images]
SETBAC<S VARY ACROSS THE SITE IN
RESPONSE TO LOT SHAPE AND SIZE

 

 

 

 

@

Window hood over

glazirg below

cal

 

 

Typic.

 

 

 

 

 

 

 

 

 

 

 

Lp

 

 

 

 

 

1 1000

 

 

GROUND FLOOR PLAN
FLOOR AREA (inc. garage)-83m? Scale 1:100
excl PWD

SITE AREA -170m?

WALLUM

MATERIAL

CHANGE

 

 

 

 

 

 

Dining

 

 

 

 

 

 

 

 

 

edroom 1

icoefing)

LEVEL 1
FLOOR AREA - 128m?

DEVELOPMENT APPLICATION
Page 38 of 46

 

Scale 1:100

| Window hooo over
; glazing below

‘@ Feoperly bourtary

o- sere

 

 

 

 

 

 

 

APY CESCRINON MN OAT

teehfheh
A ISSUE FOR MCU DA APPROVAL DDT 20.12.16
B ISSUE FOR INFORMATION DDT 07.03.17
C ISSUE FOR RFI RESPONSE DDT 22.03.17

D ISSUE FOR MCU DA APPROVAL REVISIONS DDT 07.03.18
E ISSUE FOR MCU DA APPROVAL REV, DDT 11.05.18
F PRELIMINARY ISSUE FOR INFORMATION DDT 18.05.18
G ISSUE FOR MCU DA APPROVAL REVISIONS DDT 24.05.18

scanlon group

7 Y
|

 

Pessence

of peregian beach

 

 

 

Scale 1:100

 

 

architects

 

 

 

 

ROOF
Scale 1:100

Permeter 51000m
asaeeeee= GOOmm Overhang  34500m = 68%
seeeeee= No Overnang *6500m = 32%

DRAWINGS

SUNCOAST RESORT BUSINESS CENTRE
SUITE 2 CNR GARDAK ST & SURF RD
ALEXANDRA HEADLAND

Qld 4572

PO BOX 6232 MAROOCHYDORE BC Qld 4558
PH: 07 8443 5028 FAX.07 8479 2380
ABN 23.123. 907 T24
EMA: [email protected]

project

ESSENCE OF PEREGIAN BEACH

DEVELOPMENT

tor

THOMCO (NO 2087) PTY LTD

“

Lots 1 on SP286680
215 DAVID LOW WAY
PEREGIAN BEACH

drawing

WALLUM HOUSE PLANS

 

AS SHOWN
date 24/05/2018 drawn DDT scale  @A3

drawing 0.16003 SD1Qrevision G

Coparaet ne rearee mara oe echine
(oroperty co STAGHT ANCEATECPE PTY U1
BPA ET 120.017 PA.

Confomctann me bo veel ofl Seemtom araltats ot

‘Ske prot io commencing. Report all asctepancies 10

the Arch tocL Use Sgured dimensions in preleronce
‘scaled,

Page 39

Page 39 of 46


[OCR of page images]
vertical lightweight cladding

window hood

¥ Ceiling RL 5.1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

_ window
| hood

"jt

NEY peScMrTON ORM BATE
A ISSUE FOR MCU DA APPROVAL DOF 20.12.16
B ISSUE FOR INFORMATION DDT 07.03.17

C ISSUE FOR RFI RESPONSE

DDT 22.03.17

D ISSUE FOR MCU DA APPROVAL REVISIONS DDT 07.03.18
E ISSUE FOR MCU DA APPROVAL REV. DDT 11.05.18
F PRELIMINARY ISSUE FORINFORMATION DDT 18.05.18
G ISSUE FOR MCU DA APPROVAL REVISIONS DDT 24.05.18

scanlon group

 

   

aluminium
framen winooyws

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ssSence

of peregian beach

6923 Buildinc Height

aluniniurn

lranec wv feature aby aroour —

feature

Grek

 

 

 

 

 
 
  

She . may
~\ 3 ELEVATION (_\4 ELEVATION
7 Scale 1:100 KS Scale 1:100
aluminium
framed
a vertical lightweight cladding windows
vertical lightweght Scale 1:100
cladging Ea LL

 
 
 
 

Catling RL. 6.400. Coling RL. 5.400. “

  

alueniihin

fore cement sheet frome wag

with cover oaltens

  
 

rendered fibre
cement sheeting
First RL. 3.000 ——=
architects
SUNCOAST RESORT BUSINESS CENTRE
SUITE 2 CNR GARDAK ST & SURF RD
ALEXANORA HEADLAND Qld 4572
PO BOX 6232 MAROOCHYDORE BC Qld 4558
PH: 07 5443 5028 FAX:07 5479 2380

ABN 29 123897 724
EMAR- [email protected]

6923 Building Height

 
 
 
 
 
 
 
 
 
 
 

feature wall batten

 

   

project
ESSENCE OF PEREGIAN BEACH
DEVELOPMENT

for

THOMCO (NO 2087) PTY LTD

CO 4 ELEVATION (2 ELEvATION __ ss “
Scale 1:100 Scale 1:100 Lots 1 on SP286680
— 215 DAVID LOW WAY

PEREGIAN BEACH
drawing

WALLUM HOUSE ELEVATIONS

 

 

 

AS SHOWN
date 24/05/2018 drawn DDT scale @A3

drawing 0.16003 SD2Orevision G

WALLUM a

serene shan
‘roperty of SPROUT ARCHITECTS PTY LTD,
ABN 23.123 817 724,

Coractore me ta wt a Orereone end ats oe

ta pcr = sane ning) tort eB carvearcien Se

Pe Bechet Une hed fmraiins ri prwterance a

~~ 36

MATERIAL CHANGE © oF USE DEVELOPMENT APPLICATION DRAWINGS
Page 39 of 46

Page 40

Page 40 of 46


[OCR of page images]
_ \ |
\ |

\\

   

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

aeatanice _
a
sR aseeeee
16400, / lie
[ pasties
ae Wc 4
ont i Pip
| / Ppetisemanapittates tt]
Screenéfl 10x 1 USP AARALEEEE
~ AC condensers / | i ae -
| ( Oeep ide:
| SERED EAE
| + ‘
|
__ EMERGENCY EGRESS | |
ROAD! i
|
| Toieat
| ee
|
| | i ait
| eieiiage
| 1H eles
1 | 1 tas
. | |
eres ‘Shopping Ce Y
planted to batter sr cnt | | . |
basin | |
mee - Screened A/C
ae Condenkers
be locked off in stita (| =
Bushfire, 16 ti =
i Ht 5 |
i e0 pi | & |
’ |
| E+ Line on ROOF
I q ABOVE
15 | |
Screened taiapas | i
hardstand bin . ss
collection 3X4100L Oat |
loise noise. f
' iW |
| |
.< es | |
7 ie |
fi esa ba |
10811 12 13 (A |
f ! A |
SAA ts | |
eh Sg ae
25 feaang sede =s
|
iS
HET et| oie Mi
= 4 | r
——————S—— aa | |
4 OUND FLOOR |
250@A3 i
REVISION 5 16.04.19 REVIEW ISSUE SF

      

 

 

      
  

Seas S74 el ae

   

WWW.RDARCH.COM.AU 180082 seed : 250 2019 Pa NR sac la \e|

Page 40 of 46

        

Page 41

Page 41 of 46


[OCR of page images]
     

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

yuswesey

5

—_——— is ae! d

——<——— : ; = = —— ——— NY a

TTT : \ >

~ . \ a

— = +f \

| | | cm
= TY 2
— | S
: 3 o
-—e = ||! WNT TTT TE = 2

     

 

 

 

|
I

 

 

a

tthe ttre

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

£2 \\_ROOF PLAN - BLANK

\p0287T : 250@A3

ES tet e a PAV

      

 

 

 

 

 

 

 

 

 

 

S
S
é
es
(ze
4
us
oa Ke)
ry
—— a
mo
o w i +
ze Sa ca Oo
— — — — — — — — — —_ ~~ 38 _ Ba — — — —— ! ae
2 ws as
SS wousseg SS E
AS Sa cS)
i
=
| = Se E
a
fem »| \ tc]
\ =
\ q

 

 

3) L 4 Ssupyaerettt \

1324
31
r

NURAEHULOT \

 

~

N

= aa

A eee rt

bse Pane |
ng
1]

|
|
|
|
|

 

 

 

 

 

 

 

___| Ba ‘S Es Ee oe: | Be

     

ght)

a eet
a
=

16400
16400

WWW.RDARCH,COM.AU

BRED

 

SSS

 

Page 42

Page 42 of 46


[OCR of page images]
 

[3300 [2700 Lana |

 

|, 3300 [2700 Lasoo |

 

 

 

 

12.0m HEIGHT LINE — == METAL ROOF SHEETING

ABOVE NGL ————— as —— a

  
 
 
  
 
  

 

 

 

 
 
 
 
 
 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

    
 
 
 

 

 

 

 

y —_ a V. IS assis
oo a ALUMINIUM FRAMED GLAZING
_s CEILING TE aS = = iS
& tever2 __FEATURESOREENNG—s- : READERS MAS
s mm ALUMINIUM FRAMED ———
N . GLAZING
go mena - cqntumoune
s UMINIUM -
GLAZING —SCREENED SECURE CAR PARK
SOW _srowno FLoon _ a
440
[EST ELEVATION
t cow 250@A3 MAIN RECEPTION —-AUTOMATIC ENTRY GATE
CONFERENCE ROOM/ LANIA
12.0m HEIGHT LINE
Penne Vy 12,0m HEIGHT LINE gee aD
pres er =<—— METAL ROOF ABOVE NGL- oF
OO SR er nee a rt SHEETING 2 SS oe ee
a ——1 ee ee: eg ng eee =
CEILING ——— r T ToL Tl PIT a : oo _ ae! = ~
YD —— ares k—
— RENDERED Sco ao ne ALUMINIUM FRAMED RENDERED MASONRY 2
uever2 MASONRY BS LIKE ea Rl GLAZING Sy
10400 co : 2 ‘co. = =
: ! : ; -RENDERED MASONRY ALUMINIUM FRAME 3
X GLAZING 5
e-— -— - i . UN +
RENDERED oF Tr WT CONFERENCE ROOM — SCREENED SECURE §
MASONRY Ba ; CAR PARK
GROUND FLOOR y' ry a nie
“4400 —————— a x
(2 NORTH ELEVATION C4s0uTH ELEVATION
\_/1 5 250@A3 1: 250@A3
12.0m HEIGHT LINE
ABOVE NGL-
/ = 8 i aig net SS Seas eS te ie ee Se ee
A Te a= STI ROOF SHEETING
FEATURE CLADDING-——4 ———
= I << FEATURE CLADDING
CEILING z are ra i
“8 RENDERED MASONRY RENDERED MASONRY
LEVEL2 ee ig
io400 CORPORATE SIGNAGE
Levelt a _
(me
SCREENED SECURE
CARPARKING SCREENED AIC
GROUND FLGOR, ONDENSORS
SROUNDETOOR oa Sere eenaie

 

EAST ELEVATION

CH 250004;

1
5 16.04.19 REVIEW ISSUE 4

   

REVISION

WWW.RDARCH.COM.AU 180082 ioe 4) 2019 215 DAVID LOW WAY, PEREGIAN BEACH Ns tee StS te $023 ae)

   

Page 42 of 46

    
 

Page 43

Page 43 of 46


[OCR of page images]
 

 

 

 

 

 

 

 

 

 

 

 

 

\
\
\
\
\
a
\
\
\
\
\
\ 4
\ !
\ |
\
~ BREDOO0R scanion®
group REVISION 4 16.04.19 REVIEW ISSUE 0
WWW.RDARCH.COM.AU 180082 seated : 650 APRIL "19 215 DAVID LOW WAY, PEREGIAN BEACH TS ee ale $029 Be (eg

 

Page 43 of 46

Page 44

Page 44 of 46


[OCR of page images]
 

 

BEACH SHACKS (EXAMPLE) - FOR ALL SHACKS va =
400% OF ROOF AREA CONNECTED TO z — .
3kL STORAGE TANKS WITH APPROPRIATE > ~S-
INLET ARRANGEMENTS | can) ef = J.
| ES TN : iB , | | Oo ] ‘oro seem BUILDING A
R . 100% OF ROOF AREA CONNECTED TO
eae NORTHERN CATCHMENT —==$ Jyh | { | 7 100kL STORAGE TANK WITH APPROPRIATE
NORTHERN BIORETENTION At / om | . = INLET ARRANGEMENTS.
95m? SURFACE AREA | | al | Tf
| H PWS ——
SEE DWG 1108-155C-01-04 \ ! ne
AND 1108-155C-01-05 \ BUILDING A
FOR DESIGN DETAILS \ I op a :
om f Pol OFFSITE CATCHMENT
APPROXIMATE I > ee 4 = :
DEDICATION LINE = Bead Z
oa “ =
Cen
CATCH-DRAIN TO At + \ St ae 0
= ce ads = BUILDING B
Cao | A — tet et fe Tie beak J ~— 400% OF ROOF AREA CONNECTED TO
=o #1] Bayt AT 400kL STORAGE TANK WITH APPROPRIATE
+ = ha NG ; I INLET ARRANGEMENTS,
CATCH-DRAIN TO B1 7
EXISTING WET HEATH 7
WETLAND = i
/
f Si m
-- 0 10 20 30 40 SC
MID BIORETENTION B1 on ]
81m? SURFACE AREA
HOTELICOMMERCIAL AREA
Seg Og Sa egape | 400% OF ROOF AREA CONNECTED TO
BND AUDE  SSCs01505 scl | , 400k STORAGE TANK WITH APPROPRIATE
FOR GENERAL DESIGN DETAILS i Ine ARRANGEMENTS
we \ ; ina
27 Soper
AEERORINATE CATCH-DRAIN TO Bt | iu! j i
BOUNDARY TO yy
AaTIGNAIIPARR < is A o I alee =, hal
CATCH-DRAIN TO C1b § a . =
Cm : = 1 —.
i cm |
Com | | -
Cap & as i
ra ee = CARPARK AREA
SOUTHERN BIORETENTION C1b , x:
74m? SURFACE AREA i a t * FLOW FROM OFF-SITE
SEE DWG 1108-185C-01-04 | a AREA DIRECTED TO
AND 1108-1550-01-05 i C1A BIORETENTION BASIN
FOR DESIGN DETAILS ~ |
as SOUTH CATCHMENT |
L | bs SOUTHERN BIORETENTION Cta
(STAGE 1) iF =r VARIABLE WIDTH
= f thse 63m? SURFACE AREA
o et | th 4.0 - 4.5mRL
S —< t. ‘
CATCH-DRAIN TO C1b % “Ap:

 

 

 

 

 

 

  

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

- ne

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

—Fir— 2h sa — van ro
Vag U f

T REVISION SCHEDULE ‘DATUM J, eee ee canta aren anepa! | . “DRAWING TITLE iSCALE
CONTRAST “ONS TOUTTIONS ESSENCE OF PEREG | | ; mys tac en aa ‘Simmonds & Bristow Pty. Ltd. .PROPOSED STORMWATER ' AS SH OWN
we wees ST BMW ATER MANAGEMENT ct OESKHED k arte” : "WATER & ENVIRONMENTAL ANALYSTS & TREATMENT DEVICE }

BN ERRNO CRTATRAGERERAL PORTE TAww Th capes eating) CONSULTANTS PEAS BAN ONT OS —155C

. site priet to the of wor) _

Bae INTIAL VERN Hasa— a 4 aaa FOR INFORMATION! ary

EY oATE_|_ Conners Tre pate | #a<(011379 sRelping you make good clean water ACN, 010252 418 [paramath pate voi 1108-155C-01-02,§ Co 9

Page 44 of 46

Page 45

Page 45 of 46


[OCR of page images]
 

 

 

Page 45 of 46

 

 

Figure SW-1

+)

Page 46

Page 46 of 46


[OCR of page images]
 

] T

91'44'15"
| | 125-231 | | ] T

 

  

Emit A
SP286680 \
a)

C34 | \

7814 me

“f

   

  
 
 

|
J Lil IN, | f

 

 

 

 

   

    
   

 

WAY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

a |
15-9174 |Pr9
4 Py ares |
ey L =!
900 ( Pees |
SP286680 LY
Teecad Y ‘he Te f
Sone noones ae || a
oo 1 —_— Hoabs50
| |
eh 2, 3 ! 6238me
g _38765m2 Ae
3/5
i i
. J L-Emic
on
$1 =
% Vs, bs
Sie ;
/47
NPW889

Notes:

 

 
    
 
 

~ Areas ond dimensions are subject to council approval, engineering design and survey.

 

 

 

0

Scale 1:800 - Lengths are in Metres.
ke J 4 4 4 4. at 4 4 i L i 5
to 9 © 20 30 Ba] 50 60 70 8 90 mo
ze 4 4 L 40m 5 L 1 4100 fren rl i £50 |ren
Cert: PEREGIAN VILLAGE MARKET

 

PROPOSED SUBDIVISION PLAN

Over Lot | on SP286680
21/5 David Low Way, Peregian Beach

Skyline Surveyors

 

 

 

Local Government: NOOSA SHIRE COUNCIL Locality: PEREGIAN BEACH | Same hue
69 Anenuata Drive. Sr emaeery
PlanNo: 7254 prop sub Rev C sede: J/8O00@A3 MOUNTAIN CREEK GLO 455?
E: [email protected]
Prepared By: MN Date: 28/02/19 W: www.skysurv.com.au

 

 

 

 

Page 46 of 46

 

Used in these records

About this file

File size
5.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Final Judgment - Court Order Approval MCU16_0153 REC16_0041.pdf · 5.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.