Skip to the record
The only place to find full transcripts.

Council archive · source document

Final Judgment - Court Order Approval MCU16/0153 REC16/0041

of 46

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

      16003 SD-10        G     Marram Plans prepared by Sprout             24 May 2018
                               Architects

      16003 SD-11        G     Marram Elevations    prepared   by          24 May 2018
                               Sprout Architects

      16003 SD-12        G     Saltbush House Plans prepared by            24 May 2018
                               Sprout Architects

      16003 SD-13        G     Saltbush House Plans prepared by            24 May 2018
                               Sprout Architects

      16003 SD-14        G     Saltbush House Elevations prepared          24 May 2018
                               by Sprout Architects

      16003 SD-15        G     Saltbush House Elevations prepared          24 May 2018
                               by Sprout Architects

      16003 SD-16        G     Lily House Plans prepared by Sprout         24 May 2018
                               Architects

      16003 SD-17        G     Lily House Plans prepared by Sprout         24 May 2018
                               Architects

      16003 SD-18        G     Lily House Elevations prepared by           24 May 2018
                               Sprout Architects

      16003 SD-19        G     Wallum House Plans prepared by              24 May 2018
                               Sprout Architects

      16003 SD-20        G     Wallum House Elevations prepared            24 May 2018
                               by Sprout Architects

      180082 SD-21       5     Floor Plans prepared by Red Door        16 April 2019
                               Architecture

      180082 SD-22       5     Floor Plans prepared by Red Door        16 April 2019
                               Architecture

      180082 SD-23       5     Elevations prepared by Red Door         16 April 2019
                               Architecture

      180082 SD-29       4     Staging Plan prepared by Red Door       16 April 2019
                               Architecture

      1108-155C-01-      C     Simmonds & Bristow Drawing             13 January 2012
      02

      Figure SW-1              re Bioretention Basin, Detention              undated
                               Basin and No-Bioretention Basin

     The approved plans may be further amended by the conditions herein.
     Staging of Development
3.   The development may be staged in accordance with the approved staging plan. The
     first stage must include the following:
     (a)   All required bushfire management measures




                                     Page 5 of 46

Used in these records

About this file

File size
5.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Final Judgment - Court Order Approval MCU16_0153 REC16_0041.pdf · 5.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.