DocuSign Envelope ID: 69D49415-881C-4D35-BC9B-DE8DA1B3BB93


                   BIO RETENTION BASIN CONSTRUCTION SEQUENCE NOTES:                                                                            BIO RETENTION INSTALLATION NOTES:
                   THE CONSTRUCTION AND ESTABLISHMENT OF BIO RETENTION BASINS IS TO BE STAGED AS FOLLOWS:                                      THE PLACEMENT OF DRAINAGE, TRANSITION AND FILTER MEDIA
                   1. FUNCTIONAL INSTALLATION - ONCE THE MAJORITY OF THE SUBDIVISION WORKS ARE COMPLETE, THE BASIN                             LAYERS MUST BE UNDERTAKEN CAREFULLY TO ENSURE CORRECT                                            C.I. CAP. EXTEND CAP TO
                       CONSTRUCTION INCLUDING EARTHWORKS, INLETS, OUTLET STRUCTURES, SUBSOIL DRAINAGE, TRANSITION                              DEPTH, SLOPE AND COMPACTION:                                                                    APPROX. 50-100mm ABOVE
                       LAYERS, FILTER MATERIAL, PROTECTIVE LAYERS AND EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE                          DEPTH: FILTER MEDIA SHOULD BE INSTALLED AND COMPACTED IN TWO                                                                                       200m W x 150m D CONCRETE                              EPOXY SADDLE JOINT
                                                                                                                                                                                                                                         BIORETENTION SURFACE. SCREW
                       UNDERTAKEN BY THE CIVIL CONTRACTOR. THE FILTER MEDIA WITHIN THE BIO RETENTION BASIN IS TO BE                            LIFTS FOR DEPTHS OVER 500mm.                                                                                                                       SURROUND TO CLEANOUT RISER                            TO TRUNK MAIN                     FILTER MEDIA LOAM -
                                                                                                                                                                                                                                             CAP FIXED USING 3 SCREWS
                       COVERED WITH A PROTECTIVE GEOFABRIC LAYER (BIDIM A12 OR EQUIVALENT), THEN COVERED WITH 75mm OF                          SLOPE: THE TOP SURFACE OF THE DRAINAGE LAYER, TRANSITION                                                                                                                                                                                   400mm DEPTH CONSISTENT WITH
                       TOPSOIL AND TURFED OR GRASS SEEDED TO THE SATISFACTION OF COUNCIL. SILT FENCES ARE TO BE ERECTED                        LAYER AND FILTER MEDIA LAYER SHOULD BE FLAT. A SPREADER BAR                                                                                                                                                                                CURRENT FAWB SPECIFICATIONS.
                       AROUND THE OUTSIDE OF THE BASIN. ACCEPTANCE OF THE COMPLETED SUBDIVISION WORKS ON AND OFF                               SHOULD LEVEL THE SURFACE OF EACH LAYER.                                               150Ø SUBSOIL DRAIN CLEANOUT                                                                                                                          FILTER MEDIAN PARTICLE DIA
                       MAINTENANCE BY COUNCIL IS TO EXCLUDE THE PROTECTIVE LAYERS WITHIN THE BIO BASINS.                                       COMPACTION: THE FILTER MEDIA MUST BE LIGHTLY COMPACTED                                 - PVC PIPE (NON SLOTTED) AND                                                                                                                        0.45m MIN. HYDRAULIC
                   2. BUILDING CONSTRUCTION - THE PROTECTIVE GEOFABRIC AND GRASS LAYER AND THE EROSION AND SEDIMENT                            DURING INSTALLATION TO PREVENT THE MIGRATION OF FINE                                CONNECTOR CLEANOUTS AT HEAD                                                                                                                            CONDUCTIVITY 200mm/hr
                       CONTROL MEASURES ARE TO REMAIN IN PLACE DURING THE BUILDING CONSTRUCTION PHASE. THE BUILDING                            PARTICLES. THIS CAN BE ACHIEVED WITH A SINGLE PASS OF A LIGHT                              OF SUBSOIL DRAIN AND AS
                       CONSTRUCTION PHASE IS TO BE THE TIME FOR COMPLETION OF 80% OF THE BUILDING CONSTRUCTION AND SITE                        ROLLER SUCH AS A DRUM LAWN ROLLER. A VIBRATING PLATE CAN                                             SHOWN ON PLAN
                       ESTABLISHMENT WORKS ON ALLOTMENTS OR 12 MONTHS FOLLOWING COMPLETION OF THE SUBDIVISION WORKS,                           ALSO BE USED TO COMPACT SMALL BIO RETENTION SYSTEMS OR                                                                                                                                                                                         COARSE SAND TRANSITION
                       WHICHEVER IS SHORTER. THE MAINTENANCE OF THE BASINS INCLUDING INLETS, OUTLETS AND EROSION AND                           'POZITRACK' BOBCATS CAN BE USED FOR LARGE SYSTEMS. ENSURE                                GRAVEL DRAINAGE LAYER                                                                                                                                 LAYER - 100mm DEPTH
                       SEDIMENT CONTROL MEASURES IS TO BE UNDERTAKEN BY THE CIVIL CONTRACTOR FOR THE DURATION OF THE                           ONLY ONE COMPACTING PASS IS MADE OVER THE MEDIA FOR LIGHT                               - DEPTH 200mm. (NO FINES)                                                                                                                              (1mm PARTICLE DIA.)
                       BUILDING CONSTRUCTION PHASE.                                                                                            COMPACTION.                                                                                    5-7mm AGGREGATE
                   3. OPERATIONAL ESTABLISHMENT - FOLLOWING COMPLETION OF THE BUILDING CONSTRUCTION PHASE, THE TURF,                                                                                                                                                                                                                                                             PROVIDE BIDUM A12 OR
                       TOPSOIL AND PROTECTIVE GEOFABRIC IS TO BE REMOVED AND THE BASIN RE-PLANTED WITH VEGETATION AND                          ROCK ARMOURING NOTES:                                                                                                                                                                                                             EQUIVALENT TO EXTENTS
                       LANDSCAPING AS PER THE LANDSCAPE DESIGN DRAWINGS. WORKS UNDERTAKEN FOR OPERATIONAL                                      1.     ROCKS TO BE DURABLE BLUE STONE OR OTHERWISE APPROVED BY                                                                                                                                          SMOOTH WALLED SLOTTED PVC
                       ESTABLISHMENT ARE TO BE UNDERTAKEN BY OTHERS AND WILL BE SUBJECT TO A SEPARATE ACCEPTANCE BY                                   SUPERINTENDENT.                                                                                                                                                                                  PIPE- MIN 0.5% GRADE AND MAX
                       COUNCIL FOR ON AND OFF MAINTENANCE.                                                                                                                                                                                                                                        COLLECTOR PIPE
                                                                                                                                               2.     EACH ROCK SHALL BE:                                                                                                                                                                              1.5m SPACINGS
                   4. IN-SITU INFILTRATION TEST - AN IN-SITU INFILTRATION TEST WILL BE REQUIRED PRIOR TO ON-MAINTENANCE BEING                           - ANGULAR IN SHAPE (PROMOTES INTERLOCKING)
                       GRANTED BY COUNCIL. THE TEST WILL NEED TO ACHIEVE AN AVERAGE RATE OF 180mm/h INFILTRATION (WITHIN                                - FREE FROM OVERBURDEN, SPOIL, SHALE AND                                                                                        BIO RETENTION BASIN SUBSOIL DRAIN
                       APPROPRIATE TOLERANCES) WITH AT LEAST 4 SAMPLE LOCATIONS AROUND THE BASIN. ANOTHER IN-SITU
                       INFILTRATION TEST WILL BE REQUIRED FOR OFF-MAINTENANCE.
                                                                                                                                                        ORGANIC MATERIAL.                                                                                                           CLEANOUT AND FILTER MEDIA SPECIFICATIONS
                                                                                                                                               3.     NEITHER BREADTH NOR THICKNESS OF A SINGLE ROCK SHALL BE                                                                                                  SCALE: NTS
                                                                                                                                                      LESS THAN ONE HALF ITS LENGTH (ie THE ROCK SHALL BE CHUNKY
                                                                                                                                                      RATHER THAN FLAT).
                   BIO RETENTION PARTICLE SIZE DISTRIBUTION AND PROPERTIES GUIDE:                                                              4.     ROCKS TO BE PLACED AND INTERLOCKED INTO POSITION AND BUILT




                                                                                                                                                                                                                                                                                                                                            0.40m
                   SOURCE: (BIOFILTRATION MEDIA GUIDELINES (VERSION 3.01), PREPARED BY THE FACILITY FOR ADVANCING WATER                               UP TO FINAL LEVELS SHOWN, ENSURING COVERAGE OF GEOFABRIC.
                                                                                                                                                                                                                                                                       FILTER MEDIA LOAM
                   BIOFILTRATION (FAWB), JUNE 2009.) & (BIO-RETENTION TECHNICAL DESIGN GUIDELINES (VERSION 1) PREPARED BY                      5.     GAPS BETWEEN THE ROCKS ARE TO BE FILLED BY DROPPING SMALL
                   'WATER BY DESIGN' (OCTOBER 2012)                                                                                                   ROCKS INTO GAPS AND LOCKING INTO POSITION WITH A CROWBAR.
                                                                                                                                                                                                                                                                       COARSE SAND TRANSITION
                                                                                                                                               6.     ALL ROCKWORK TO BE PLACED OVER BIDIM A24 OR EQUIVALENT.
                   MATERIAL COMPOSITION RANGE GUIDE:                                                                                           7.     FOR ROCK SIZED SPECIFIED AS D50 ON THE DRAWINGS, THIS                                                            GRAVEL DRAINAGE LAYER




                                                                                                                                                                                                                                                                                                                                                    0.10m
                   CLAY AND SILT           <3%             (<0.05mm)                                                                                  CORRESPONDS TO THE MEDIAN DIAMETER OF WHICH HALF OF THE




                                                                                                                                                                                                                                                                                                                                            0.20m
                   VERY FINE SAND          5-30%           (0.05-0.15mm)                                                                              ROCK SIZES SHALL BE GREATER AND HALF OF THEM SHALL BE
                   FINE SAND               10-30%          (0.15-0.25mm)                                                                              SMALLER. THE ROCK SHALL BE WELL GRADED AND HAVE A
                   MEDIUM TO COARSE SAND 40-60%            (0.25-1.0mm)                                                                               MAXIMUM SIZE NO GREATER THAN 30% AND A MINIMUM SIZE NO
                   COARSE SAND 7           -10%            (1.0-2.0mm)                                                                                LESS THAN 30% SMALLER THAN D50. FOR EXAMPLE IF D50 = 400mm IS                                                                 CLEANOUT AND FILTER MEDIA SPECIFICATIONS
                   FINE GRAVEL             <3.0%           (2.0-3.4mm)                                                                                SPECIFIED, THE EQUIVALENT ROCK DIAMETER RANGES FROM 280 to                                                                                              SCALE: 1:20(A1)
                                                                                                                                                      520mm.
                   WHILE TOTAL CLAY AND SILT CONTENT OF 3% IS RECOMMENDED, A CLAY AND SILT CONTENT UP TO 6% IS
                   ACCEPTABLE PROVIDED:
                   · THE SATURATED HYDRAULIC CONDUCTIVITY IS BETWEEN 100mm/hr & 300mm/hr AND
                   · THE REMAINING MATERIAL MEETS THE COMPOSITION RANGE SPECIFIED ABOVE.
                                                                                                                                               TURF REINFORCED WITH ENKAMAT OR APPROVED
                   SOIL SPECIFICATIONS:                                                                                                        EQUIVALENT INSTALLATION NOTES:
                   · TOTAL NITROGEN CONTENT - <1000mg/kg                                                                                       1.     PREPARE AND COMPACT BASE SURFACE. EXCAVATE ANCHOR
                   · ORTHOPHOSPHATE CONTENT - <80mg/kg SOILS WITH TOTAL PHOSPHORUS CONCENTRATIONS >100mg/kg SHOULD                                    TRENCHES AT TOE AND SHOULDER OF BANK, TO BE BACKFILLED
                      BE TESTED FOR POTENTIAL LEACHING. WHERE PLANTS WITH MODERATE PHOSPHORUS SENSITIVITY ARE TO BE                                   AFTER LAYING TURF.
                      USED, TOTAL PHOSPHORUS CONCENTRATIONS SHOULD BE <20mg/kg)                                                                2.     LAY ENKAMAT OR APPROVED EQUIVALENT AND PIN TO
                   · ORGANIC MATTER CONTENT - AT LEAST 3% (w/w). AN ORGANIC CONTENT LOWER THAN 3% IS LIKELY TO HAVE                                   MANUFACTURERS SPECIFICATIONS.
                      TOO LOW A WATER HOLDING CAPACITY TO SUPPORT HEALTHY PLANT GROWTH. IN ORDER TO COMPLY WITH                                3.     LAY TOPSOIL AND PLACE TURF.                                                                   SAFETY FENCE TO
                      BOTH THIS AND THE TOTAL NITROGEN AND ORTHOPHOSPHATE CONTENT REQUIREMENTS, A LOW NUTRIENT                                                                                                                                      LANDSCAPE
                      ORGANIC MATTER WILL BE REQUIRED.                                                                                                                                                                                              ARCHITECTS DETAIL.                                               REFER DRG. 16-003302-3....
                   · pH - AS SPECIFIED FOR 'NATURAL SOILS AND SOIL BLENDS' 5.5-7.5 (pH 1:5 IN WATER)                                                                                                                                                                                                                 FOR FURTHER ROCK
                   · ELECTRICAL CONDUCTIVITY - AS SPECIFIED FOR 'NATURAL SOILS AND SOIL BLENDS' <1.2 dS/m.                                                                                                                                                                                                           BOULDER WALL DETAILS




                                                                                                                                                                                                                                                                                                                   300mm
                                                                                                                                                                                                                                                           PERMEABLE
                                                                                                                                                                                                                                                           GEOTEXTILE
                                                                                                                                                                                                                                                           MEMBRANE

                                                                                                                                                                                                                                                            GRANULAR FILL
                                                                                                                                                                                                                                                                                                                                          TEMP. PONDING LEVEL
                                                                                                                                                                                                                                                             100Ø AG PIPE
                      PROVIDE 300mm THICK CONCRETE                                                                                                                                                                                                                                                                              1                    BASIN SL: 98.00m AHD
                                                                   0.15m MIN ALL AROUND
                      INFILL ENDWALL AROUND PIPE                                                                                                                                                                                                                                                                                      4
                                                                                                                                                                                                                                                            NO FINE CONCRETE
                                                                                                                                                                                                                                                                                                                                                                BASE OF
                                                                                                                                                                                                                                                                                     m
                                                                                                                                                                                                                                                                                300m                                                                         BIO RETENTION
                                                                                                                                                                                                                                                                                                                                                            FILTER MATERIAL




                                                                                                                                                                                                                                                                                                                              300mm
                                                                         1.0m WIDE, 0.45m DEEP, 0.20m
                                                                         THICK CONCRETE (SL81 MESH
                                                                         CENTRAL) SUPPORT UNDER PIPE


                                     TYPICAL OUTLET THROUGH ROCKWALL DETAIL                                                                                                                                                                                                            BIOPOD TYPICAL RETAINING WALL SECTION
                                                                                                                                                                                                                                                                                                              SCALE: N.T.S.
                                                       SCALE 1:50 (A1)




                                                                                                                                                                                                                                                                                                                                                                      N.S.C. REF NO. MCU15/0111 & REC15/0031
                                                                                                     DRAWN    STATUS                                                 SCALE                                        CLIENT                                                                                              PROJECT                                                       DRAWING TITLE
REVISION    DATE    ISSUE DETAILS                                                   DRAWN   DESIGN
   1       21.12.16 ORIGINAL ISSUE                                                   HT      BF                               FOR APPROVAL                                                                                 PALM LAKE WORKS PTY LTD                                                                               PALM LAKE RESORT                                            STORMWATER QUALITY
   2                                                                                                                        NOT FOR CONSTRUCTION                                                                                                                                                                                       STAGE 3
   3                                                                                                                                                                    1:250   5     0        5       10   A1                                                                                                                                                                                 NOTES & DETAILS
   4                                                                                                 DESIGN   APPROVED                                                  1:500                               A3                                                                                                             19 TRADING POST ROAD - COOROY
   5                                                                                                          ANDREW McPAIL                 RPEQ 6921                                                                                                                                                                                                                               PROJECT No.            DRAWING No.   REVISION
   6                                                                                                                                                                                                                                                                                                                   DISCLAIMER
   7
                                                                                                                                                                                                                                                                     C 2015    www.calibreconsulting.co
                                                                                                                                                                                                                                                                                                                      ALL DIMENSIONS TO BE CHECKED ON SITE BY CONTRACTOR PRIOR TO
                                                                                                                                                                                                                                                                                                                      CONSTRUCTION. USE WRITTEN DIMENSIONS ONLY, DO NOT SCALE.
                                                                                                                                                                                                                                                                                                                                                                                    16-003302                    3700       A
   8                                                                                                          FOR & ON BEHALF OF CALIBRE CONSULTING (QLD) PTY LTD
Log in to download the original file

16-003302-3700(A).pdf · 342 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.