Original source · versioned page text
AC1809 Rev B NBN 62 Lake MacDonald Drive Cooroy
1 2 3 4 5 6 7 8 9 10 11 12
NBN ACCREDITED CONTRACTOR TO
P100
LOTS 1, 2, 3, 100 & 900 203 AS/NZS 3000:2018
ing
CONNECT PROPOSED NETWORK
Exist
PWR
8
TO EXISTING NETWORK CANCELLING LOT 105 ON SP118458 3.11.5 Spacing from other underground services
181.8 DA RAL24/0014
A All underground wiring systems shall be spacing not less than 100 mm from A
P1 0 0 E other underground services.
D RIV
ALD Wiring systems shall be suitably marked with warning tape in accordance
ON NBN TECHNOLOGY IS FTTP
MACD with Clause 3.11.4.5 and maintain a separation from telecommunications,
E (FIBRE TO THE PREMISES). gas and water services in accordance with Table 3.7.
0
P10
P10
Lot 900
LAK
Exis
Lot 1
5
0
ting
Bio Basin BUILDER'S ELEC. CONTRACTOR
Drainage SP176968 Further requirements for the separation of telecommunications, gas and
P50
#1 TO REFER TO NBN RESIDENTIAL water systems from low voltage wiring systems are provided in
PREPARATION & INSTALLATION: Clause 3.9.8.4.
17.9
68.5
Exi
sti
SDUs AND MDUs TABLE 3.7
ng
5 MINIMUM SEPARATION OF UNDERGROUND SERVICES
P100 Lot 2
45
P50
SP176968 GENERAL INFORMATION: Minimum separation to low Minimum separation
2
PIT-001
DIA
5
#3 voltage electrical service of conductive
B NE THIS PROPOSED SUBDIVISION AIMS TO DELIVER LOTS FOR "COMMUNITY identified in accordance with enclosures to low B
LL AFFORDABLE HOUSING DEVELOPMENT" ACCORDING TO NOOSA SHIRE
P100
Type of service Clause 3.11.4.5 and mechanically voltage electrical
A Lot 3
COUNCIL PROJECT NUMBER CN24780.
CO protected (1) earthing electrode (1)
URT SP176968 MULTI DWELLING UNIT (MDU)
61.8
mm mm
LOT 1 Lot 28 #5 ±
Exi 5 12 UNITS OR LESS: Water service not ±
SP176968 sti 100 500
ng SERVICES ORIGINATE AT A CENTRAL LOCATION AND SPREAD greater than DN65 (2)
P10
#2 0 TO EACH DWELLING. NBN RECOMMEND PCD (PREMISES Water service greater
P50
CONNECTION DEVICE) AND COLLECTOR BOX ARRANGEMENT 300 500
than DN65 (2)
42. AS PIT AND PIPE NETWORK IS NOT SUITABLE IN NARROW
5 Lot 4 DRIVEWAYS AND TRAFFICABLE AREAS. Sanitary drainage 100 500
Stormwater drainage 100 600
20.1
SP176968 A COLLECTOR BOX IS A WEATHERPROOF ENCLOSURE
Ex
ist #7 SIMILAR TO B&R SWITCHBOARD, TO BE MOUNTED ON SOLID Gas 100 500
5 ing WALL. MOUNT PCD IN COLLECTOR BOX AS REQUIRED.
Lot 27 Telecommunications 100
SP176968 1 PCD (4 SERVICES) (500X 500 ENCLOSURE)
C 2 PCD'S (UP TO 8 SERVICES) (800 X 600 ENCLOSURE) NOTES: C
Lot 100 #4
1 Authorities, such as water and as suppliers and electricity distributors, may
Balance 3 PCD'S (UP TO 12 SERVICES) 800 X 800 ENCLOSURE)
require their services to be spaced at a greater distance from underground wiring UNDERGROUND ELECTRICAL ALLOCATIONS
systems. Also see Figure 3.10.
COMMS CONDUIT
2 DN = internal diameter of pipe.
URD ESTATES - FOOTPATH
SUPPLY COLLECTOR BOX VIA P50 COMMS CONDUIT
SUPPLY SUBSEQUENT DWELLINGS VIA P20 COMMS CONDUIT
Lot 25 FROM COLLECTOR BOX. (MADISON BOX NOT REQUIRED).
NOTES:
SP176968
PWR #8
RED
1. ALL CONSTRUCTION TO BE INSTALLED IN SHARED TRENCH UNLESS OTHERWISE SHOWN.
Lot 26 2. ALL PROPOSED LOTS ON PLAN ARE SINGLE PREMISE LOTS ONLY.
3. NBN PIT AND PIPE INFRASTRUCTURE SHALL BE INSTALLED AS STATED BY INDUSTRY GUIDELINE G645:2017
ASH
SP176968
URT
#6 FIBRE READY PIT AND PIPE SPECIFICATION FOR REAL ESTATE DEVELOPMENT PROJECTS CAN BE DOWNLOADED
ROA
FROM THE COMMUNICATIONS ALLIANCE WEBSITE AT:
E CO
CT
http://www.commsalliance.com.au/Documents/all/guidelines/g645
D1
4. PIT AND PIPE INFRASTRUCTURE TO BE INSPECTED BY NBN AFTER INSTALLATION.
GE
Lot 24 5. INSTALL P23 LEAD-IN PIPES FROM PIT TO PROPERTY ENTRY POINT AND PLUG.
WIL
D LOT 2 SP176968 6. ALL MATERIALS SHALL BE TO COMMUNICATION ALLIANCE SPECIFICATION. ALTERNATIVES WILL ONLY BE D
E
#2
DRIV 7.
ACCEPTED IF AGREED TO IN WRITING BY NBN.
THE LOCATION OF PIT AND PIPE INFRASTRUCTURE SHALL ALSO COMPLY WITH THE REQUIREMENTS OF ENERGEX.
D
Lot 23 AL 8. CONTRACTOR TO CONFIRM FINAL LOCATION OF PROPOSED DRIVEWAYS AND OTHER SERVICES PRIOR TO
ON
90
INSTALLATION OF PITS. PITS MUST BE CLEAR OF DRIVEWAYS.
SP176968 D
AC
PIT-
5
M
002
#4
AK
E BILL OF MATERIAL SDU Development Information
P50 CE L LOT
Development Name:
P100
2 A NO OF LOTS: 3
PL 900
DIA
LA NE 62 Lake MacDonald Drive
VIO L LA
PITS DUCTS
Lot 22 SIZE QTY SIZE QTY MTRS Developer Company:
LOT 1 CO
SP176968 UR 2 0 P100 3 233 Noosa Shire Council
#6
T 5 3 P50 3 6
ESS 6 0 P20 0 0 Development Address:
E ACC RVE 8 0 E
E 62 Lake MacDonald Drive, Cooroy 4563
RES
9 0
TOTAL NUMBER OF PITS: 3 Authorised Rep:
TOTAL NUMBER OF MANHOLES: 0
PL Auspower Connect Pty Ltd
TOTAL NUMBER OF CONDUITS: 6
ROA
Lot 100 A
L Phone: Mob 0419 707 166
VIO
(Balance Lot) LOT 2 TOTAL LENGTH OF CONDUITS: 239
Lot 21
D1
E-Mail: [email protected]
SP176968
#5 Lot 20 COORDINATION - ROAD RESERVE: nbn Reference Number: Stage Number:
SP176968 LOT 100 STG-W000XXXX 1
1. TELECOMMUNICATION PIT AND PIPE NETWORK TO
#3 BE INSTALLED BY ACCREDITED CONTRACTORS
WITH APPROPRIATE PUBLIC LIABILITY INSURANCE.
Design Revision:
'AS CONSTRUCTED' INFORMATION AND MANDREL B
NCIL TEST RESULTS TO BE SUPPLIED ON COMPLETION.
COU ERVE 2. NON-ACCREDITED CONTRACTORS MUST HAVE
F RES DIRECT SUPERVISION.
F
3. CONNECTION OF NEW CONDUITS INTO EXISTING NBN LEGEND
PITS MUST BE COMPLETED BY NBN. Shared Trench Symbol
LOT 3 PIT-ID
COORDINATION - PRIVATE PROPERTY: Service Drop Access Pit
2 (650mmX280mmX565mm)
Lot 17 PIT-ID
T
THE CLIENT'S ELECTRICAL CONTRACTOR WILL BE
STREE
Network Boundary/Local Network Pit (Single Lid)
SP176968 RESPONSIBLE FOR THE FOLLOWING: 5 (700mmX450mmX650mm)
#12 · INSTALL LEAD IN CONDUITS OR SUPERVISE PIT-ID
INSTALLATION BY OTHERS. Distribution/Local Network Connection Pit
6 (1360mmX555mmX650mm)
KAURI
SPECIAL NOTES: PIT-ID
Distribution/Local Network Connection Pit
LN
8 (1360mmX555mmX860mm)
EE
PIT-ID
SITE PLAN EARTH POTENTIAL RISE - ENERGEX TRANSFORMERS
TR
Fibre Distribution Hub (FDH) Pit
WITH COMMON OR SEPARATE EARTH MUST BE 9 (2000mmX555mmX900mm)
AR
Lot 16 INSTALLED WITH A MINIMUM OF 15m SEPARATION FROM
108
PE
G G
10 0 10 20 30 40 50 METRES SP176968 NBN PITS, AS SPECIFIED BY NBN. CONDUIT SIZE CONDUIT LENGHT
PIT-
5
003
#14
LOT 3 PIT-ID 26.5 PIT-ID
SCALE 1:500 AT A1 P50
2
LOCALITY PLAN 9
P100
5
SCALE 1:2000 AT A1
DRAWING TITLE:
-
STRICTLY N KEY PLAN STG-W000XXXXXX
NBNCO APPROVAL RECORD: NBN PIT & PIPE DESIGN
-
SIGNATURE DATE STAGE 1
- DD 03 NEW CONNECTIONS
WD ENABLE#:
-
AB STATE: QLD REGION: COOROY
H - H
QUALITY RECORD :
- NBNCO DISCLAIMER
Auspower Connect Pty Ltd FSA: 4COR SAM: 4COR-20 ADA:4COR-20-21
THIS DOCUMENT HAS BEEN PREPARED SOLELY FOR THE USE OF PO Box 531 PROJECT No: AC1809
B 07/08/25 B BERNIE UPDATED PMT LOCATION JMcKENNA NBNCO LIMITED (ABN 86 136 533 741) FOR USE IN MAINTAINING Buddina, QLD 4575
NBNCO FACILITIES. IT HAS NOT BEEN CREATED FOR ANY OTHER Mob 0419 707 166 CADREF No: CAD_REF_AC1809-T
A 02/07/25 I LUBACHESKI ORIGINAL J McKENNA USE. IT SHOULD NOT BE SCALED TO LOCATE NBNCO ASSETS. NO [email protected]
WARRANTY IS GIVEN THAT THE INFORMATION IS ACCURATE OR ABN 74 166 366 883 SCALE SHEET No. REV.
REV DATE DRAFTER DESCRIPTION APPROVED COMPLETE. 1:500 1 OF 1 B
1 2 3 4 5 6 7 8 9 10 11 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original