Skip to the record
Accept no imitations.

Council archive · source document

08/1953 - Operational Works - Transport Type 5 - Domestic Marine (Jetty) [As Published] · 142008.1953

of 16

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997 Part E, Version 3 1, 3 March 2008

  
 

  

  

AOA) =h oie) OMI cibl Seal 9 excl

Part E

Building &/or operational works assessable
against a planning scheme Ve be,

 
 

 

 

 

 

 

Plature of the works ae |
i es ee - mens 6 r
1. Nature of work that requires assessment against a planning scheme:
[J Building work - Compiete Table A {X] Operational work - Complete Table B
Table B
(i) What is the nature of the operational work?
@ ] Roadworks L] Stormwater [[] Water infrastructure [} Sewerage infrastructure

(] Landscaping CD Earthworks (J Drainage Works J] Signage
(C1 Clearing vegetation under the planning scheme Other - Specify below
New Timber Jetty

 

 

 

(ii), What type of approval is being sought? (OTE: if you have indicated multiple operational works in question (i) above and your answers to this
question would be different for different operational work, it may be more appropriate to pravide these details in an attachment to this form)

[X] Development Permit LO Preliminary approval LL] Both (Specify below)

(iil) Is the operational work necessary to facilitate the creation of new lots (i.e. subdivision/?
BY No = [J Yes - Specify the number of lots being created

{iv) Are there any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU ar reconfiguring
alot)

DI No [[] Yes - Complete Table B(a)

 

 

 

 

 

 

e 2. What is the dollar value of this operational work? (ie. the total value including GST, materials and labour) |$ 15500

 

 

 

 

ilandztory tntormation |
3. Confirm that the following mandatory information accompanies this application
Y Confirmation of faa.
todgement Method of fodgement
Plans, andspecifications if applicable, showing the nature and location of the proposed works (including the
extent of any cut and fi) &X] Confirmed over the counter

 

 

 

 

 

 

OFFICE USE ONLY

 

 

 

 

Date Received Reference Numbers

 

 

Advice for completing Part E

General advice
le Part A must also be completed for al IDAS development applications.
le The applicant is responsibte for answering all questions fully and correctly, untess following a response there is a statement to go directly to another question.

 

 

 

 

Used in these records

About this file

File size
1.1 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_1953 - Operational Works - Transport Type 5 - Domestic Marine (Jetty) [As Published].pdf · 1.1 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.