08/1953 - Operational Works - Transport Type 5 - Domestic Marine (Jetty) [As Published] · 142008.1953
INTEGRATED PLANNING ACT 1997 Part E, Version 3 1, 3 March 2008
AOA) =h oie) OMI cibl Seal 9 excl
Part E
Building &/or operational works assessable
against a planning scheme Ve be,
Plature of the works ae |
i es ee - mens 6 r
1. Nature of work that requires assessment against a planning scheme:
[J Building work - Compiete Table A {X] Operational work - Complete Table B
Table B
(i) What is the nature of the operational work?
@ ] Roadworks L] Stormwater [[] Water infrastructure [} Sewerage infrastructure
(] Landscaping CD Earthworks (J Drainage Works J] Signage
(C1 Clearing vegetation under the planning scheme Other - Specify below
New Timber Jetty
(ii), What type of approval is being sought? (OTE: if you have indicated multiple operational works in question (i) above and your answers to this
question would be different for different operational work, it may be more appropriate to pravide these details in an attachment to this form)
[X] Development Permit LO Preliminary approval LL] Both (Specify below)
(iil) Is the operational work necessary to facilitate the creation of new lots (i.e. subdivision/?
BY No = [J Yes - Specify the number of lots being created
{iv) Are there any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU ar reconfiguring
alot)
DI No [[] Yes - Complete Table B(a)
e 2. What is the dollar value of this operational work? (ie. the total value including GST, materials and labour) |$ 15500
ilandztory tntormation |
3. Confirm that the following mandatory information accompanies this application
Y Confirmation of faa.
todgement Method of fodgement
Plans, andspecifications if applicable, showing the nature and location of the proposed works (including the
extent of any cut and fi) &X] Confirmed over the counter
OFFICE USE ONLY
Date Received Reference Numbers
Advice for completing Part E
General advice
le Part A must also be completed for al IDAS development applications.
le The applicant is responsibte for answering all questions fully and correctly, untess following a response there is a statement to go directly to another question.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1953 - Operational Works - Transport Type 5 - Domestic Marine (Jetty) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.1 MB (small file)
- File type
No other editions are linked here.