Council archive · source document
08/0989 - MCU - Multiple Housing Type 2 - Duplex [As Published] · 132008.989
INTEGRATED PLANNING ACT-1997- Part D-Version-3-1,3 March-2008- Tendon toaretion “a 6. Confirm that the following mandatory information accompanies this application: ~ Confirmation of | a lodgement I Method of lodgement For all applications, tia 0 Plans showing the nature and Tocation of the proposed use on the premises and a statement about the intensity and scale of the proposed use (e.g. number of employees, days and hours of operation, number of visitors, & Confirmed mail number of seats, capacity of storage area} When the - application involves reuse of existing y buildings : a : oe i) Plans showing the size ze and iocation of the ‘buildings | to be reused C Confirmed DX] Not applicable (ii) Plans showing the size and location of the proposed new building work &X Confirmed mail [] _Not applicable When the appfication involves reuse of other existing works. oO * . — oe (iv) Plans showing the nature and location of the works to be reused Ol Confirmed DX] Not applicable When the application involves new operational work. eS oo ee (v) Plans showing the nature re and location of the proposed new operational wos & Confirmed mail (1 Notapplicable OFFICE USE ONLY Date received Reference numbers Advice for completing Part D General advice . Part A must also be completed for all IDAS development applications. . The applicant is responsible for answering all questions fully and correctly, untess following a response there is a statement to go directly to another question. . * When paying fees to the Environmental Protection Agency by electronic funds transfer (EFT) for coastal development applications, use the process from the information sheet Electronically paying fees to the Environmental Protection Agency (EPA) and securely attach the form Electronic Funds Transfer (EFT} payment notification to this application. Q3 A development permit authorises development to occur. A preliminary approval is a step in the approval process and does not authorise development to occur - a subsequent application for a development permit must be sought. Table D If the MCU application involves operational work that is the building of a retaining wall on the premises, the application is taken also to be for the operational work if approval for the operational work has not been applied for in this application or in a separate application.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0989 - MCU - Multiple Housing Type 2 - Duplex [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.