Original source · versioned page text
Town Planning Assessment Report
Other Works Codes
The development will be serviced by standard urban infrastructure provisions including
reticulated water, sewer, electricity, telecommunications, and stormwater.
Stormwater quality treatment has been accounted for in the master stormwater management
strategy prepared for the subdivision that created the subject lot. Run-off from the site is to be
conveyed through piped drainage to Lot 100 SP 216079, where a large bioretention basin and
detention area will provide the required treatment and attenuation of site run-off.
The development will also provide an industrial building design that appropriately responds to
Noosa’s subtropical climate through:
• ensuring that each tenancy has access to good quality natural light through large
windows;
• providing sun hoods and batten screens the around the perimeter of the building to shade
the external walls; and
• incorporating large floor to ceiling roof heights which improves ventilation.
Overlays
Bushfire Hazard Overlay
The subject site is mapped as being within an Acid
Sulfate Solis (Area 2) on the Acid Sulfate Soils
Overlay Map. However, the proposed development
will not involve excavation of 100m³ or more of
material at or below 5 metres AHD and consequently
it does not trigger assessment against the code.
Page 27 of 28
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.