Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

DTMR - Concurrence Agency Response - OPW12/0139

of 3

Text shows just the words. Original shows the document exactly as it was published.

      7.     Any ships and equipment you or your agent use must comply with the Transport Operations
             (MarineSafety) Act 1994,the Transport Operations (Marine Safety) Regulation 2004 and the
             Transport Operations (MarinePollution)Act 1995.

      8.     Any ships using this facility must comply with the Transport Operations (MarineSafety)Act
             1994 and the Transport Operations (Marine Safety) Regulation 2004.


      9.     The contractor must complete construction within two years from the date of approval. If
             construction is not completed, you will need additional or amended comments from the Regional
             Harbour Master.


      Maritime Safety Queensland does not need to be further consulted if all of the above conditions are
      met.



      A copy of this letter has been sent to the assessment manager.



      Yours sincerely




~ Captain Richard C Johnson
      Regional Harbour Master (Brisbane)




                                                                                                   Page 2 of2

Used in these records

About this file

File size
887 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

DTMR - Concurrence Agency Response - OPW12_0139.pdf · 887 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.