7. Any ships and equipment you or your agent use must comply with the Transport Operations
(MarineSafety) Act 1994,the Transport Operations (Marine Safety) Regulation 2004 and the
Transport Operations (MarinePollution)Act 1995.
8. Any ships using this facility must comply with the Transport Operations (MarineSafety)Act
1994 and the Transport Operations (Marine Safety) Regulation 2004.
9. The contractor must complete construction within two years from the date of approval. If
construction is not completed, you will need additional or amended comments from the Regional
Harbour Master.
Maritime Safety Queensland does not need to be further consulted if all of the above conditions are
met.
A copy of this letter has been sent to the assessment manager.
Yours sincerely
~ Captain Richard C Johnson
Regional Harbour Master (Brisbane)
Page 2 of2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
DTMR - Concurrence Agency Response - OPW12/0139Related documentApplication case desk ↗
About this file
- File size
- 887 KB (small file)
- File type
No other editions are linked here.