Stormwater Management Plan
Original PDF page 29, section 1. The text section number identifies this passage in the reader.
1
DA300
12M HEIGHT LIMIT
SITE BOUNDARY
SITE BOUNDARY
RL +44400
1500
ROOF
42900
3000
UNIT 12 BREAKOUT ZONE UNIT 15
THIRD FLOOR
39900
3000
UNIT 07 BREAKOUT ZONE UNIT 10
SECOND FLOOR
36900
3000
UNIT 02 BREAKOUT ZONE UNIT 05
FIRST FLOOR
33900
2900
GROUND CAR PARK
GROUND FLOOR
31000
DA DOCUMENTATION
DATE REV DESCRIPTION NOTES: Office 1 - 2 / 2460 Gold Coast Hwy, CLIENT: CONSULTANTS: PROJECT: SCALE: DRAWN BY:
Mermaid Beach, QLD
BOTTLEBRUSH
17.04.25 1 DA DOCUMENTATION
M: 0407 655 238 STRUCTURE: N/A 1 : 100 @ A3 LB
E: [email protected] CIVIL: N/A SHEET NAME:
W: www.studioworkshop.com.au
J. HAINES ELECTRICAL:
MECHANICAL:
N/A
N/A CROSS SECTION - SHEET 01
ALL DIMENSIONS TO BE VERIFIED BY BUILDER. ALL WORKS TO COMPLY WITH A.S.1684 AND LOCATION:
FIRE: N/A
23 BOTTLEBRUSH AVE
OTHER RELEVANT CODES. THESE DESIGNS, PLANS, SPECIFICATIONS AND COPYRIGHT
THEREIN ARE THE PROPERTY OF STUDIO WORKSHOP AND MUST NOT BE USED, COPIED OR
REPRODUCED WITHOUT CONSENT. © 2025 HYDRAULIC: N/A JOB NO: DRAWING NO: ISSUE:
ABN 92 603 817 983 Nominated Architect - Chris Knapp | QLD Reg - #5922 | NSW Reg - #11997 CERTIFIER: LATERAL CERTIFICATION GROUP NOOSA HEADS QLD 4567 24-33 DA301 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Stormwater Management Plan.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.