Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

Stormwater Management Plan

of 42

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 4, section 1. The text section number identifies this passage in the reader.

                                                                                Table of Figures

                                                                                Figure 1 –Architectural Plan                             6

                                                                                Figure 2 - Site Location                                  7



                                                                                Table of Tables

                                                                                Table 1 – Rational Method Flows                          10

                                                                                Table 2 – DRAINS ILSAX Flows                             10

                                                                                Table 3 - Detention Tank Design Properties               11

                                                                                Table 4 - Detention Tank Staged Elevation-Area-
                                                                                Volume                                                   11

                                                                                Table 5 – Pre- and Post Development Peak Flows
                                                                                (With Detention)                                         12

                                                                                Table 6 – Detention Tank Inundation Levels               12



                                                                                Table of Appendices

                                                                                Appendix A.           Architectural Plans                17

                                                                                Appendix B.           Site Survey Plan                   18

                                                                                Appendix C.           MPN Plans                          19

                                                                                Appendix D.           Rational Method Calculations       20




                                                                                                                                          4
Inspired engineering

22 May 2025
https://mpncnetau.sharepoint.com/sites/Administration/Shared Documents/10000-10999/10200-10299/10256/Report/22-05-25 SWMP_Issue A.docx

Log in to download the original (Stormwater Management Plan.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.