Decision Notice - Concurrence Agency - DNRW [As Published] · 132009.152
2009/152
Roof Water & Stormwater Drainage
8. Roof runoff from any new dwelling shall be directed to a rainwater storage system or tank that
is installed to ensure water from the rainwater storage system or tank is used for external uses
(such as watering gardens, irrigation, ornamental ponds, water features, topping-up swimming
pools, outdoor cleaning, etc) and for internal (ground floor) use in washing machine cold taps
and toilet cisterns. All rainwater tanks are to be designed and installed in accordance with the
Queensland Development Code (QDC) current at the time of building approval, and shall be
part of the plumbing application for approval. The location and capacity of the tanks shall be
clearly shown on the plans submitted for Building approval and any overflow shall be
discharged in a manner that will not cause scour and will not cause ponding on neighbouring
properties.
9. All stormwater drainage (including roof water overflow from the rainwater storage system)
shall be collected and discharged so there is no net increase in stormwater runoff from the
site.
10. All site stormwater drainage shall be by means of a gravity system.
Earthworks
11. As parts of the site are proposed to be filled to raise the effluent disposal area above Q100
flood level, the applicant must undertake filling in a manner that will not increase the flood
levels in the vicinity or cause additional ponding/flooding on neighbouring properties.
12. Filling works are only permitted for the purpose of constructing the effluent disposal area
above the Q100 flood level. The total area of fill on site is not permitted to increase as a result
of filling for the expansion of the effluent disposal area.
13. Filling works required on site shall be carried out in accordance with Council’s Planning
Scheme Policy PSP5 – Engineering Design Standards, so as not to cause the additional
ponding of water on any adjoining lands or the blockage of, or interference with, any natural
watercourses.
14. Filling in order to expand the footprint of the building pad is not permitted.
Erosion and Sediment Control
15. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary.
In this regard, plans detailing the methods of controlling erosion and sediment in accordance
with the Healthy Waterways document and fact sheet series titled Controlling Stormwater
Pollution on your Building Site dated 2006 are required to be submitted with the application for
a Building Works Permit.
Contributions Towards Council Infrastructure
16. Monetary contributions shall be paid to Sunshine Coast Regional Council towards the cost of
providing and/or upgrading various infrastructure at the rates applicable at the time of
payment. An estimate only of the contribution amounts under the current Council policies and
requirements is outlined in the table below:
Contribution Required For: Amount:
PSP12 – Public Open Space Contributions (Park) $543.00
TOTAL Contribution Amount = $543.00
Please note that these amounts are all subject to variations in the Consumer Price Index, All
Groups Brisbane from December 2008 until the date of payment.
Page 3 of 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Concurrence Agency - DNRW [As Published]Related documentApplication case desk ↗
About this file
- File size
- 313 KB (small file)
- File type
No other editions are linked here.