Skip to the record
Beware of cheap imitations.

Council archive · source document

Slope Stability Report · EXE22/0013

of 55

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Original PDF page 12, section 1. The text section number identifies this passage in the reader.

Waste Water & Storm water

      The site is connected to the mains sewer and storm water systems. All outflows are to be
       directed to these mains.
      Storage tanks should be watertight and adequately founded. Overflows are to be piped to
       the existing storm water system.

7.5 Erosion Control & Landscape
      Control erosion as this may lead to instability.
      Slope protection measures shall be carried out on exposed batters in order to mitigate the
       development of stability and erosion issues. These works shall be carried out in a timely
       fashion after the batter is exposed.
      Re‐vegetate exposed with shrubs, grasses and ground covers preferably with plants
       indigenous to the local area.

Used in these records

About this file

File size
8.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Slope Stability Report.pdf · 8.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.