Council archive · source document
Development application part 1 of 2 IDAS Forms 1 & 6 · OPW13/0918
Very large file (10.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.
pi we Mifi’lii!i4.WWti1 ,
HmM& WSE*WA, i#MM4I’ tt
Table B-Material change of use
a) Does the material change of use involve the following? (Tick all applicable boxes.)
D Operational work carried out completely or partly in a coastal management district
b) Does the material change of use involve building work carried out completely or partly in a coastal management
district that is:
D the construction of new premises with a gross floor area of at least 1000 m2
D the enlargement of the gross floor area of existing premises by more than 1000 m2
Table C-Reconfiguring a lot
a) Does the reconfiguring a lot involve the following? (Tick all applicable boxes.)
D Land situated completely or partly in a coastal management district
D The construction of a canal
b) How many lots will be created?
I I
Table D-Building work
a) Is the building work on land completely or partly seaward of the coastal building line under the Coastal Protection
and Management Act 1995?
[
No DYes
3. Is the tidal works located within a local government tidal area? (Tick all applicable boxes)
D No [{]Yes-provide details below
I Local government: IScJYl5h.",-e ~<:.o<JMCo;’
I Mandatory supporting information
4. Please provide the following information Confirmation of Method of
lodgement lodgement
For all applications
A statement addressing the relevant part{s) of the State Development D Confirmed
Assessment Provisions (SOAP).
D Not applicable
For applications involving operational work that is tidal works
A copy of the certificate of title for the land (Including tidal land) that D Confirmed
would abut or adjoin the proposed works.
[{] Not applicable
Plans showing: [{] Confirmed
. the real property description and boundaries of the land (including D Not applicable
tidal land) that would abut or adjoin the proposed works
. the proposed works (including existing works to be removed) in
relation to relevant tidal planes (e.g. mean high water springs)
. the slope angles of the beds and banks of the tidal area and the
finished levels of the proposed works.
For tidal work that will occupy a navigable waterway provide a water D Confirmed
allocation area plan providing evidence that the proposed work will not
[{] Not applicable
prejudice the access rights of adjoining property owners.
IDAS form 23-Tidal works and development within
coastal management districts
Version 3.0-1 July 2013
ueWr:i.7 ~’kln;<;’&f 7~’.; if ’Z’i?Z~@:ZZ;;;;;UZ;’; j,%WJ.=l4l1;Qw 4,::;;;&i" .#;:;:;;:;;g;t:;w_,::, ;i;4~:’;:}ii;%ig;t.t)W;’Z ’*,’6:; ~ffl’;;i’,.A i. .&~.t. ~’ i;">i;% l~1I:ti*r);{~i"irJ(;;;;’~’_ ~~:*’.,~e"ji4*’ t;."..ti’i4;..aifit+?~
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development application part 1 of 2 IDAS Forms 1 & 6Related documentApplication case desk ↗
About this file
- File size
- 10.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.