Original PDF page 17, section 1. The text section number identifies this passage in the reader.

                                 Figure 5.2 – Music Modelling Results



The modelling results show the pollutant reduction objectives are met for all contaminants listed in Table
5.1. Details of the proposed bio-retention basin are provided in the Stormwater Management Plan
drawing no: SCG 31131- SW1.1 thru SW1.5 (Appendix D).




6.0      STORMWATER QUANTITY


Noosa Shire Council’s Planning Scheme – Noosa Plan 2020, require post development peak flows
leaving the development site will not exceed the pre-development peak flow rates for the required design
storms. Peak flow increases will be minimised by the provision of an On-site Detention (OSD) basin
fitted with a low flow orifice plate to detain a portion of the runoff from the site and limit the peak flow
rates of pre-development levels.




SCG Consulting Engineers                   Page 15                             SCG Ref: 31131(SWMP).RevA

Used in these records

About this file

File size
7.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SCG 31131(SWM).RevA.pdf · 7.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.