6.1.4 Runoff Coefficient (C10)
The 10year runoff coefficients (C10) were calculated as defined in QUDM. Refer to Table 6.2 for
Adopted C10 Values: -
Table 6.2: C10 Values
STATE CATCHMENT A (C10) CATCHMENT B (C10)
Pre Development 0.78 0.74
Post Development 0.88 0.88
6.1.5 Peak Flows
Table 6.3 below displays a summary of major and minor discharge rates for pre and post development
conditions using the rational method. Refer to Appendix E for calculations: -
Table 6.3: Pre and Post Development Peak Flow Rates
Condition Q1 Q2 Q5 Q10 Q20 Q50 Q100
(m3/s) (m3/s) (m3/s) (m3/s) (m3/s) (m3/s) (m3/s)
Pre Development 0.010 0.013 0.019 0.024 0.029 0.037 0.042
Catchment A
Post Development 0.028 0.034 0.051 0.063 0.076 0.095 0.105
Catchment A
Pre Development 0.063 0.076 0.114 0.140 0.167 0.210 0.240
Catchment B
Post Development 0.070 0.084 0.128 0.159 0.191 0.241 0.266
Catchment B
Total 0.074 0.089 0.134 0.164 0.195 0.247 0.282
Pre Development
Total 0.098 0.118 0.179 0.222 0.267 0.336 0.370
Post Development
SCG Consulting Engineers Page 17 SCG Ref: 31131(SWMP).RevA
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SCG 31131(SWM).RevA.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.