Skip to the record
Search everything, all in one place.

Council archive · source document

SCG 31131(SWM).RevA · MCU21/0156

of 41

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Original PDF page 3, section 1. The text section number identifies this passage in the reader.

Table of Contents
1.0     INTRODUCTION ..................................................................................................................................3
2.0     EXISTING SITE DESCRIPTION.........................................................................................................4
3.0     PROPOSED DEVELOPMENT.............................................................................................................5
4.0     EXISTING DRAINAGE .........................................................................................................................5
  4.1         Existing Drainage and Infrastructure....................................................................................................5

  4.2         Lawful Point of Discharge..........................................................................................................................6

5.0     STORMWATER QUALITY..................................................................................................................8
  5.1         State Planning Policy and Water by Design Assessment ................................................................8

  5.2         Construction Phase......................................................................................................................................9

      5.2.1       Silt and Sediment Erosion ........................................................................................................................................9

  5.3         Completed Development.........................................................................................................................10

      5.3.1       Water Quality Objectives .......................................................................................................................................10

      5.3.2       Sources of Contaminants .......................................................................................................................................11

      5.3.3       Proposed Treatment Measures...........................................................................................................................13

      5.3.4       Pollutant Modelling ..................................................................................................................................................13

6.0     STORMWATER QUANTITY............................................................................................................15
  6.1         Rational Method.........................................................................................................................................16

      6.1.1       Design Storms.............................................................................................................................................................16

      6.1.2       Rainfall Intensity .......................................................................................................................................................16

      6.1.3       Time of Concentration ............................................................................................................................................16

      6.1.4       Runoff Coefficient (C10)...........................................................................................................................................17

      6.1.5       Peak Flows ...................................................................................................................................................................17

  6.2         Proposed Drainage....................................................................................................................................18

      6.2.1       Catchments...................................................................................................................................................................18

      6.2.2       Peak Flow Mitigation ...............................................................................................................................................18

  6.3         Hydraulic Modelling (PC Drains)..........................................................................................................19

      6.3.1       Rainfall Data ................................................................................................................................................................19



SCG Consulting Engineers                                                   Page 1                                                             SCG Ref: 31131(SWMP).RevA

Used in these records

About this file

File size
7.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SCG 31131(SWM).RevA.pdf · 7.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.