Original source · versioned page text
SCG 31131(SWM).RevA.pdf
Table of Contents
1.0 INTRODUCTION ..................................................................................................................................3
2.0 EXISTING SITE DESCRIPTION.........................................................................................................4
3.0 PROPOSED DEVELOPMENT.............................................................................................................5
4.0 EXISTING DRAINAGE .........................................................................................................................5
4.1 Existing Drainage and Infrastructure....................................................................................................5
4.2 Lawful Point of Discharge..........................................................................................................................6
5.0 STORMWATER QUALITY..................................................................................................................8
5.1 State Planning Policy and Water by Design Assessment ................................................................8
5.2 Construction Phase......................................................................................................................................9
5.2.1 Silt and Sediment Erosion ........................................................................................................................................9
5.3 Completed Development.........................................................................................................................10
5.3.1 Water Quality Objectives .......................................................................................................................................10
5.3.2 Sources of Contaminants .......................................................................................................................................11
5.3.3 Proposed Treatment Measures...........................................................................................................................13
5.3.4 Pollutant Modelling ..................................................................................................................................................13
6.0 STORMWATER QUANTITY............................................................................................................15
6.1 Rational Method.........................................................................................................................................16
6.1.1 Design Storms.............................................................................................................................................................16
6.1.2 Rainfall Intensity .......................................................................................................................................................16
6.1.3 Time of Concentration ............................................................................................................................................16
6.1.4 Runoff Coefficient (C10)...........................................................................................................................................17
6.1.5 Peak Flows ...................................................................................................................................................................17
6.2 Proposed Drainage....................................................................................................................................18
6.2.1 Catchments...................................................................................................................................................................18
6.2.2 Peak Flow Mitigation ...............................................................................................................................................18
6.3 Hydraulic Modelling (PC Drains)..........................................................................................................19
6.3.1 Rainfall Data ................................................................................................................................................................19
SCG Consulting Engineers Page 1 SCG Ref: 31131(SWMP).RevA
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (SCG 31131(SWM).RevA.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.