Our Reference: P01214 L01 NG martoo 16th July 2009 consultinga pty ltd town planners + urban designers Chief Executive Officer Sunshine Coast Regional Council Tewantin Office P.O. Box 141 TEWANTIN Q 4565 Attention: Planning and Development Section - Evelyn Murphy Dear Sir/Madam RE: APPLICATION FOR OPERATIONAL WORKS - CLEARING OF VEGETATION AND EARTHWORKS ASSOCIATED FOR CONSTRUCTION OF CRICKET NETS AND NETBALL COURTS AT ST THOMAS MORE SCHOOL, BEN LEXON DRIVE SUNSHINE BEACH DESCRIBED AS LOT 1 ON RP198277 Martoo Consulting has been engaged by St Thomas More School, as the applicant for the above proposal to submit an application for operational works - earthworks and clearing of vegetation associated with the construction of cricket nets and netball courts at the school. The Corporation of the Trustees of the Roman Catholic Archdiocese of Brisbane have received funding from the Australian Government Building the Education Revolution (BER) program to construct a Multi Purpose Hall along with minor extensions to the St Thomas More school at Sunshine Beach. The construction of the hall involves removal of the schools cricket practice nets and one tennis/netball court. The applicant therefore seeks to relocate the cricket practice nets and netball court to the northern portion of the site. This letter details the proposal and provides an assessment of the development against the relevant code provisions contained within The Noosa Plan. 1. THE SUBJECT SITE The subject site is located at Sunshine Beach and is bounded by Bicentennial and Ben Lexon Drives and Eenie Creek Road. The St Thomas More School is located on site with class rooms, administration buildings, library, hall and chapel positioned on the southern portion of the site and ovals and vegetation positioned on the northern area. The map and aerial photographs below illustrate the location of the site and existing site conditions. Page 1 SUNSHINE COAST OFFICE GYMPIE OFFICE 1/199 GYMPIE TERRACE NOOSAVILLE - PO BOX 1684 NOOSAHEADS Q 4567 1/28 REEF STREET GYMPIE - PO BOX 391 GYMPIE Q 4570 TELEPHONE 07 54555425 - FACSIMILE 07 54555725 TELEPHONE 07 54827440 - FACSIMILE 07 54824952 [email protected] [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 20 pages
Page 2
2. THE DEVELOPMENT APPLICATION The applicant seeks approval to clear existing vegetation from the northern portion of the site to enable the relocation of the cricket practice nets and one netball court as well as providing for an additional Netball court. As part of the construction of the courts and practice nets wire fencing is to be provided around the area. Proposal plans are included in Attachment 1 which demonstrates the location of the new courts and indicates a total of 2200m’ is to be cleared. Vegetation in this area includes several Eucalypt species including blaoadwoods however is predominantly _ Casuarina species. The photographs below illustrate the type of vegetation to be removed. Page 2
Page 3
3. ASSESSMENT In accordance with the Integrated Planning Act, the clearing of vegetation and earthworks constitutes Operational Works. The Noosa Plan includes the site in the Eastern Beaches Locality and is zoned Community Services. The Assessment Table for the locality indicates that excavation or filling is self assessable against the Earthworks Code. A preliminary review of the proposal against the Code indicates that vegetation is to be removed and therefore a code assessable application is required. Excavation or filling of land not associated with a material change of use (not for the purpose of constructing a dam) Self-assessable”’ if— a) in either the Detached Housing Zone or the Semi- Attached Housing Zone and involving less than 10m? of material; or b) in all other zones and involving less than 100m* of material. Code assessable—if If seff-assessable— Column 2 of Table 14-62, Earthworks Code; and Column 2 of Table 14-53 of the Erosion and Sediment Control Code If code assessable— a) Earthworks Code; and b) Erosion and Sediment Control Code. Two overlays are relevant for the site and include: Biodiversity - Koala Sustainability Area and Urban Koala Area Natural Hazards: Bushfire and Acid - Medium Bushfire Hazard Area In accordance with the assessment table for the Biodiversity Overlay, the overlay is not triggered as the site is Eastern Beaches Biodiversity Overlay (Map OM4,1) Locstity 1 = = Boundaries Gedestrsl = Boundaries Major Waterbodies = = + Noosa Shire Boundary a etwork © inset Watercourses and Drainage Lines PITT] Riparian Butter Ares BF Environmental Protection Area P& Environmental Enhancement Area Koala Habitat Areas not mapped as Environmental Protection or Environmental Enhancement. Page 3
Page 4
A review of the proposal against the provisions of the Earthworks Code is detailed below: Specific Outcomes O1 Finished surface levels ensure land is free draining Acceptable Solutions or Probable Se PHeEsy S1.1 The finished surface gradient of any filed or excavated area is within the range of 0.5% to 1.5% and drains to Council stormwater infrastructure where available or where stormwater infrastructure is not available, toward the street. Oe oEs Complies - stormwater will drain to surrounding landscaped setback areas. O2 Any change to the level of the land does not have an adverse flooding impact on the feoding and drainage characteristics off site. No Solution provided Complies - courts will be self draining 03 Earthworks do not result in geotechnical instability on the premises or nearby premises $3.1 Filling works are undertaken in accordance with Section 2.8 Filling of Site of Councils PSP 5 - Engineering Design Standards - Roads and Drainage & Earthworks AND $3.2. Where the filling is for residential, commercial or industrial purposed the works comply with Sections 3 to 6 of AS 3798 - Guidelines for earthworks on commercial & Residential development Complies - Minor filling works proposed with only 60 cubic metres proposed 04 Earthworks do not cause disturbance to the amenity of the neighbouring land. S 4.1 The following control measures ere implemented - &) regular water spraying of exposed areas fo suppress dust; b) provision of dust stabilized or sealed intemal roads; ¢) protective covering of exposed areas that are left for more than 2 weeks; and ) if there is no valid development permit for the site, disturbed areas are revegetated using species identified in PSP 3 Landscaping Plant and Guidelines; AND S42 Earthworks are undertaken only during the hours of 7 am to 6pm, Monday to Friday and 7am to 6 pm on Saturday. No work is undertaken on Sunday or public holidays. The applicant will comply with the provisions of the relevant code. O5 Vegetation cleared from a development site is disposed of in an environmentally responsible manner. $5.1 Cleared vegetation is transported off site for disposal in an approved green waster disposal facility. OR S52 Cleared vegetation is muiched on Site and reused fro landscaping of the finished development; OR 85.3 Cleared vegetation is disposed of for the purposed of firewood. ( Note: Disposal of vegetative waste by buming off is not an acceptable method of disposal The applicant will provisions of the code. comply with the O6 Materials used as fill are suitable for development of the land and filling or excavation do not resuit in contamination of the land. S6.1 The fil material is solid clean earth, free of putrescible or refuse material, vegetation, acid sulfate soils, building or construction material or other material of contaminants; AND $6.2 The site is not on the contaminated land register The applicant will provisions of the code. comply with the O07 Haulage of material to and from a site | No solution provided. The applicant will comply with the ensures- provisions of the code. 8) minimal disturbance to neighbouring properties and properties along the haulage route and 5) Council's road infrastructure including pavement is not adversely affected. O8 Earthworks are contained within the | $8.1 All earthworks including cut and fil | Complies subject property batters, retaining wail ete are contained within the subject site. 09 Sioping sites $9.7 Not relevant Page 4
Page 5
O10 Earthworks minimise any adverse
impact upon groundwater, watercourses,
drainage lines, wetlands and native
vegetation.
No Solution provided.
As indicated by the aerial photograph the
proposed courts are to be located in a
currently vegetated.
The applicant has reviewed the layout of
the school and notes that there is no other
area on site that is large enough or
relatively level to support the proposed
courts.
The applicant has provided a 7.2 metre
setback to the Bicentennial Drive frontage
and a 6.0 metre setback to the westem
boundary. No clearing is to occur in these
setback areas.
The applicant has attempted to minimise
clearing through the co-location of the
courts and providing substantial buffers.
The area to be cleared does not contain
any watercourses or drainage lines and is
currently fenced off from the surrounding
areas.
As part of the construction of the Multi
Purpose Hall the applicant is proposing to
fevegetate the frontage of the site to the
north of the Hall and Chapel. The
revegetation is to comprise native
vegetation including koala food trees.
O11 Dams
Not relevant
Areview of the proposal against the provisions of the Sediment and Erosion Code is detailed below:
O71 Development minimises erosion and
transport of sediments off-site. - -
- araas, their surrounds and other use
ye oi aoe
Acceptable
Probable
eee)
$1.7 Site disturbance is limited to building
areas;
AND
$1.2 Sediment bariers are provided
throughout and down slope of disturbed
areas to prevent sediment washing into
gutters, drains and watercourses either on
of off the site.
AND
$1.3 Alf stockpiles including sand, soil or
building materials are within the premises
and contained within individual sediment
barriers;
AND
$1.4 Sediment basins are provided where
the site contains fine or dispersive soils:
AND
$7.5 A stormwater catch pit incorporating
8 stormwater catch pit protection device is
installed so that all runoff from disturbed
areas flows into the catch pit.
AND
$1.6 For Buildings,
a)...
eres
Complies
Sediment barriers will be erected around
site works.
Complies
Not required - minor fill
Not required.
Not applicable.
02 Stormwater
disturbed areas.
is diverted around
S2.1 Diversion drains or bunds are
designed and constructed to drain
upstream run-off around the disturbed site;
AND
$2.2 Discharge from the diversion drains
do not cause runoff impacts to other
properties.
OR
$2.3 Aitemative methods as described in
the Institution of Engineers Australia
(Queensland Division ) Soil Erosion and
Sediment Control - Guidelines for
Queensland Construction Sites are used.
Not required - existing oval well drained
and diversion drains not necessary.
Not required
Not required
Page 5
Page 6
4, CONCLUSION The proposed works will be managed to minimise impacts on surrounding areas whilst The attached development application includes: * four (4) copies of the proposal plans prepared by Middap Ditchfield Architects * acompleted IDAS application Form 1, Parts A, E and Checklist; and ® acheque for $1026 which is understood to be Council's application fee. The Assessment Manager's favourable consideration of the above development application is therefore recommended. Please contact our Sunshine Coast office if you require any further information and/or clarification with respect to the above application. Yours sincerely Nadine Gorton Senior Town Planner Martoo Consulting Pty. Ltd. Page 6
Page 7
Attachments Attachment 1 — Proposal Plans Page 7
Page 8
Adxess over
from
UPGRADE EXISTING
TE NNIS|COURT
Upgrade
Existing
Courtyard
x
SPORTS OVAL
——-— — — HH
/
Administration
FFL 38.90
Shade Sail
Toilets
\
Play area
Preschool
LEXCEN DRIVE
LEGEND
esting Building
turbishments
Building Works ard
tons
— — — = Ettent of builders area wor
0 10 20 30 40m
a
Scale 1:1000 @ A3
4
4
key y amendments NOTES: \ architects
oe «All work to be done in accordance with the BCA 2008 and retavent standards and codes.
7 a eo tot werk Pe a iy Phe (0754740077
. Checkal dren evel on st pro ameenceng a . TTS RRA 07571005
+ Donnot scale from drawings - refer to architect if dimensions are required,
©
o>
SS
Emal- desl com.2u
BIDOAP DITCAFIELO
‘Architect Rag No's Peter Wildsp 001850 Tim Dichfeld 002195
pecdect
St Thor
as More Primary School P21 Application
Ben Letoen Orive, Sunshine Beach
Eomorat On of the Trustees of the Roman Catholic Archdiocese of Brishane
drawing
Overall Site Plan soinar
} MCU-01
Fran} oe wm | issue B
Page 9
Part A, Vession 3,1, 3 March 2008
elopment Application
Part A
Common details
NOTE: Answer all questions unless directed to go to a particular question. Refer to the end of the form for advice on how to complete this form.
Company/organisation name {if applicable) [st Thomas More School
Individual applicant/Contact person (If there is more than one applicant, provide additional applicant details on an attachment to this form)
Title Ms Firstname {Nadine Lastname — |Gorton
e Postal address [crmartoo Consulting Po Box 1684 Noosa Heads Q 4567
Contact telephone number {5455 §425 :] Mobile phone number
Facsimile number 5455 5725 e-mail address [email protected]
1. Identify the premises by completing Table A, or Table B and/or Table C (ensure adequate information is given to identify the premises)
Table A If the application is for a mobile and temporary Environmentally Retevant Activity (ERA), complete Table A only. Then go to Q2.
OR
TableB Street address for the premises (tick applicable box/es below and insert property description in the table. Identify each lot in a separate row.)
{i) Street address / lot on plan for the premises (Appropriate for most applications including building applications); Of
(i) [] Street address /lot on plan for the land adjcining or adjacent to the premises (Appropriate for development in water e.g. jetty,
@ pontoon etc) (Note: Loton plan details may be obtained from title documents, a Rate’ notice, or from the local government.)
BA Address’ "7 "ok ‘plan de
ny ese # Plan type. and.
Post Co Plan Number,
4567 RP 198277
Lot NO:
“Lake Bont
1
% “$ifbel Name nd official suburbviocalty
Nabeg tacts yt . Ry
Ben Lexon Drive Sunshine Beach Sunshine Coast
AND/OR
TableC Coordinates and/or a map of the premises (Appropriate for development in remote areas, over part of a fot, in water (e.g. channel dredging in Moreton
Bay) etc.)
“ane
1 I. pepasa
[ weses
[— Other -
2. Identify if any of the following apply to the premises by completing Tables D, E, or F. (Note: in most instances, the premises will not involve any of
the following characteristics, however some applications may involve one or more of these characteristics - complete only if applicable)
Page 10
. INTEGRATED PLANNING ACT 1997 Part A, Vession 3.1, 3 March 2008
Table D Complete if the premises are adjacent | toor associated with a water er body, watercourse or or aquiler (e.g. river, creek, lake, cana)
[1
3. Indicate the total area of the premises on which the development is proposed: (Note: The total area may include land both abave and below water)
ae ~.Total:aréa of premisés 1%
4,00 (rm? [x] hectares (Tick applicable unit)
Existing use of the premises issnessg Spe "Kye Pe ere
4. Current use/s of the premises: (e.g. vacant land, house, townhouses, apartment building, shop, service station, school, sugar cane farming etc.)
Co
[1 | School and associated facilities
Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overtand flow, water etc.)?
x] No 0 Yes - Ensure the type, location and dimensions of each easement are included in plans. submitted with the application
{Proposal details
Bi
sd d
6. Brief description of the proposal (e.g. 6 uni apartment building, 30 lot residential subdivision, a bore, aquaculture)
Clearing of vegetation and associated earthworks for cricket nets and netball courts
7. Does the poposal include new buildings or operational work (including any services) on the premises?
O No x] Yes - Ensure the nature, location and dimensions of the proposed works are included in plans, submitted with the application
(Resource entitlement (if appicable) { futher information is provided in the advice section at the end of.the form
8. Does the application involve taking or interfering with a State resource and therefore require a resource entitlement? (e.g. the application
involves State land (leased and freehold), declared Fish Habitat areas, taking quarry material, taking or interfering with water under the Water Act 2000, etc.)
No - Goto Q9 O Yes - Complete Table G - provide details for each evidence required on a separate row, if applicable. Evidence of resource
allocation or entitlement must be submitted with the application. You do not need to answer Q9 - go to the next section
( Owner's consent (applicable) "further infomation is provided in the advice section at the end ofthe form
9. Complete Table H for applications involving a material change of use; reconfiguration of a lot; work on n land below high-water mark and
not within a canal as defined under the Coastal Protection and Management Act 1995; or work on rail corridor land defined under the
Transport Infrastructure Act 1994 - provide delails for each owner on a separate row, or on an attachment to this form if applicable.
Table H Premises Owner's namels
Corporation of Trustees of
1 the Roman Catholic St Thomas More School
Archdiocese of Brisbane
* Owner's signature cannot be provided on the form if you intend to submit the application electronically. Owner's consent must be provided to the assessment manager on an
attachment containing appropriate written documentation of the owner's consent. If the owner is a company, s127 of the Corporations Act 2001 (Cweatth) details how a
company may sign as owner. Templates for the provision of owner's consent are available on the IPA website .
Page 11
“ .
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
General advice
Part A of IDAS Development Application Form 1 must be completed and accompany all development applications. The applicant is responsible
for answering all questions fully and correctly, untess following a response there is a statement to go directly to another question. The
Assessment Manger may refuse to receive an application that is not properly made.
The IDAS Assessment Checklist must also be completed for alt development applications, other than those requiring assessment against the
Building Act 1975 only, i.e. those applications requiring the completion of Parts A and B only.
Applicant details
If the applicant is a company or organisation, a contact person must be nominated. The applicant's signature is not required to be provided
under the IPA.
Details of the premises
The term ‘premises’ is defined by the IPA, schedule 10 to mean a building or other structure, and Jand (whether or not a building or other
structure is situated on the land). The term ‘land’ is also defined to include the estate in, on, over or under the land.
Details of the fand are not required if the application involves a mobile and temporary Environmentally Relevant Activity only. Instead complete
Table A.
The premises may be identified in a number of ways —
« Street address and lot on plan are most common and will apply to most applications.
« Coordinates may provide the best means of accurately identifying the location of development proposed in waters, or on a relatively small
development site distant from property boundaries on a large lot. Sufficient coordinates need to be provided to identify the boundary of the
premises the subject of the application. Eastings and northings using GDA94 datum is preferred, but longitude and latitude and other
(specified) datum such as Zone Reference or GS84 may be provided.
The definition of ‘water body’ and ‘watercourse’ can vary from Act to Act.
StrategicPortLandis within a local government area but a local government's planning scheme does not apply onStrategicPortLand.
StrategicPortLandis dectared under the Transport Infrastructure Act 1994. For further information go to IDAS Guide 11 (Development on
strategic port land) and the Queensland Transport (Ports) website.
“Tidal water is defined in the Coastal Protection and Management Act 1995 (Schedule) and ‘tidal area’ for a local government and for strategic
port land is defined in the IPA (schedule 10). Generally, the area below “high-water mark’ (defined by the Coastal Act in relation to high water
mark at spring tides) establishes the boundary of a tidal area. Land below high water mark is not within a local government's area unless
provided for under the Locai Government Act 1993. Uniess otherwise provided for by iegislation, a focal government has no jurisdictian below
high water mark. A tidal area for strategic port land is within the jurisdiction of the relevant port authority, while the Environmental Protection
Agency generally has jurisdiction for a local government tidal area. However, the IPA gives local governments jurisdiction for assessing and
deciding applications for prescribed tidal works within the focal government tidal area, and the planning scheme may be applied to that
assessment (to the extent provided for in the code for prescribed tidal work).
Resource entitlement
Section 3.2.1(5) of the PA requires evidence of resource entitlement be given for applications if they involve taking or interfering with a
prescribed State resource. Schedule 10 of the /ntegrated Planning Regulation 1998 (IPR) prescribes the State resources, including State-
owned land, where evidence is required to be given, and the evidence required to support the application. Link to Integrated Planning
Regulation. Section 3.2.1(10)(a}(ii) states an application cannot be taken to be properly made without the required evidence.
For applications involving the taking or interfering with water under the Water Act, the development application may be made at the same
time as the request for resource entitlement, and the Department of Naturat Resources and Water will accept the application as properly made.
For State-controlled roads, a resource entitlement is not required for an activity that is exempt ancillary works or encroachment {identifted by
gazette notice under the Transport Infrastructure Act 1994, section 50), or if the activity requires referral to the Department of Main Roads.
Evidence may be required from more than one Department responsible for a State-owned resource, e.g. from the Environmental Protection
Agency for quarry material below high water mark, and the Department of Natural Resources and Water in relation to the State-owned land
above high water mark.
O Owner's consent
. Section 3.2.1(3) of the IPA prescribes that an application must contain, or be supported by, the written consent of the land owner/s, if the
application involves: a material change of use; reconfiguration of a lot; work on land below high-water mark and not within a canal as defined
under the Coastal Protection and Management Act 1995; or work on rail corridor tand defined under the Transport Infrastructure Act 1994.
Evidence of this consent may need to be provided before the application will be accepted as properly made by the Assessment Manager, during
the processes of the application or in the event of an appeal about the outcome of the application.
“Owner for the purpose of a lodging an IDAS development application means the person at the time of lodging the application, entitled to
receive the rent for the land (or would be entitled to receive the rent for it if it were let to a tenant at a rent).
Templates are available from the IPA website for the provision of owner's consent as an attachment to this form. However other documentation
may be used for providing owner's consent provided it is clear the documentation relates to the development application for the premises.
Owner's consent, if required, must be provided even if the applicant is the owner. Owner's consent is not required for a mobile and temporary
ERA.
Page 12
INTEGRATED PLANNING ACT 1997 Part A, Version 3.4, 3 March 2008 Portable Long Service Leave (PLSL) Levy The Building and Construction Industry Portable Long Service Leave Scheme provides long service leave entitlements to workers in the building and construction industry who would be unlikely to accrue enough service with one employer to qualify for long service leave. To fund the scheme, a Portable Long Service Leave Levy (PLSL tevy) is collected on certain building and construction work carried out inQueensland. The PLSL levy amount and other prescribed percentages and rates for calculating the levy are stated in the Building and Construction Industry (Portable Long Service Leave} Regulation 2002. Included in the amount collected by QLeave is the Workplace Health and Safety Fee and the Building and Construction industryTrainingLevy. The Building and Construction Industry (Portable Long Service Leave) Act 1991 (PLSL Act) defines the building and construction work subject to the PLSL levy and includes renovating, relocating, constructing, altering, demolishing, maintaining or repairing buildings, pools, roads, jetties, pipelines, fences or earthworks, and works for subdividing, irrigating or draining land. The PLSL levy need not be paid when the application is made, but the PLSL Act requires the levy to be paid before a development permit may be issued. The Assessment Manager must sight an approved form issued by QLeave advising of the status of the payment of the PLSL levy. Building and Construction Industry Notification and Payment Forms are available from anyQueenslandpost office or agency, on request from QLeave, or can be completed on the QLeave website at www.gleave.qld.cov.au. For further information contact QLeave (Tel: 1800 803 481 Web: www. gleave.qid.gov.au }
Page 13
INTEGRATED PLANNING ACT 1897
Part E, Version 3.2
Form 1 Development Application
Part E
Building &/or operational works assessable
against a planning scheme’
Nature ofthe works 7.) . eee Rg et ~ a ae ge |
1. Nature of work that requires assessment against a planning scheme:
(Building work - Complete Table A [X] Operational work - Complete Table 8
Table B
(i) Whatis the nature of the operational work?
(-) Roadworks [] Stormwater (_] Water infrastructure (_] Sewerage infrastructure
(J Landscaping XX) Earthworks [] Orainage Works (J Signage
[_] Clearing vegetation under the planning scheme {[} Other - Specify below
(ii) What type of approval is being sought? (NOTE: /f you have indicated muttiple operational works in question {j) above and your answers to this
question would be different for different operational work, it may be more appropriate to provide these details in an attachment to this form)
[X] Development Permit ([] Preliminary approval [J Both (Specify below)
(iii) 1s the operational work necessary to facilitate the creation of new lots (ie. subdivision)?
No ([] Yes - Specify the number of lots being created
(iv) Are there any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring
alot)
—X] No _[_] Yes - Complete Table Bia)
2. Whatis the dollar value of this operational work? (i.e. the total value including GST, materials and labour) |$ 50,000
Mandatory Information: ‘ eRe oS Y # ot af
3. Confirm that the following mandatory information accompanies this application
» Confirmation-of Method of lodgement
“lodgement
Plans, andspecifications if applicable, showing the nature and location of the proposed works (including ths :
extent of any cut and fill) x) Confirmed mail
OFFICE USE ONLY
Date Received Reference Numbers
Advice for completing Part E
General advice
« — PartA must also be completed for all IDAS development applications.
The applicant is responsible for answering all questions fully and correctly, untess following a response there Is a statement to go directly to another question.
ai A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise development to occur
| This form Is also used for bullding or operational work assessable against the land use plan for Caims airport land or Mackay airport land. Wherever planning scheme Is
mentioned, take it to mean the land use plan for the airport tand.
Page 14
INTEGRATED PLANNING ACT 1997 Form 1 Development Application Part E against a planning scheme’ Building &/or operational works assessable Part E, Version 3.2 Nature of the works . we 1. Nature of work that requires assessment against a planning scheme: DX] Building work - Complete Table A (J Operational work - Complete Table B Table A (i) What is the nature of the building work made assessable in the planning scheme? ) Height of Court Fencing IY (i) Are there any current approvals associated with this application? (e.g. material change of use) No [_] Yes - Provide details below 2. What is the dollar value of this operational work? (ie. the total value including GST, materials and labour) |$ 50,000 ‘(Mandatory Information ot a . p a) 3. Confirm that the following mandatory information accompanies this application Confirmation of Method of todgement : lodgement oa ee Plans, andspecifications if applicable, showing the nature and location of the proposed works (including the extent of any cut and fil) [X] Confirmed OFFICE USE ONLY ® Date Received Reference Numbers | Advice for completing Part E General advice ¢ Part A must also be completed for all IDAS development applications. © — The applicant is respansible for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question. ai A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise development ta occur | This form is also used for building or operational work assessable against the land use plan for Cairns airport land or Mackay airport land. Wherever planning scheme is mentioned, take it to mean the land use plan for the airport land.
Page 15
7 INTEGRATED PLANNING ACT 1997 : IDAS Assessment Checklist, Version 22 Form 1 Development Application IDAS Assessment Checklist IDAS. Development Application Form 1 is the approved form for all development applications under the Integrated Planning Act . 19971PA). Form 1 is made up of various Parts. Part A (Common details) of Form 1 must be completed for all applications. The relevance of other Parts of Form 1 depends on the nature of the application. .. Form.1-also.includes this IDAS Assessment Checklist, whichis used to assist in determifiing State assessment and referral requirements, and the Parts of Form 1 relevant to the application. | _. Section,1 and all other relevant sections of the [DAS Assessment Checklist,.as identified in-the-Table-betow; mustbe=— =~ completed for all development applications except those proposed on land in an urban development area, or for building work __ "requiring assessment against the Building Act 1975 only. For more information about development applications on land in an urban development area, refer to www.ulda.qld.gov.au. For more advice about building applications refer to Part B of the IDAS Application Form. Answering the following questions will assist you in determining which sections of the checklist must be completed for your application. If unsure, phone or visit your local government or log onto the DIP website www.dip.qld.gov.au for help For all IDAS development applications (except those for building work requiring assessment against the Building Act 1975 only) - complete Section 1 of this checklist Does the application seek approval to make a material change of use of the premises? Ces |paNo If yes - complete Section 2 of this checklist Does the application seek approval to reconfigure a lot? if yes - complete Section 3 of this checklist and Part F of IDAS Application Form 1. If the premises are completely within a single LYes |xINo local government area assessment is by the local government. Does the application seek approval to carry out operational work? 3 if yes - complete Section 4 of this checklist &lYes |CINo Does the application seek approval to carry out building work requiring assessment against the Fisheries Act 1994? OYes |—XINo if yes - complete Section § of this checklist x Have you received a referral agency response under section 3.3,2.of the IPA, in relation to this development application? If yes - complete Section 6 of this checklist OYes |) No Does the application seek approval to carry out building work requiring assessment against a local government planning scheme? CYes |fXJNo If yes - complete Form 7 Part E of IDAS Application Form 1. Assessment is by the local government. Does the application seek approval to carry out building work requiring assessment against the Building Act 1975? if yes - go to Appendix 1 of this checklist for advice on building referrals. Complete Part B of IDAS Application Form 1. CYes |KINo Assessment is by a building certifier Do you wish the application fo be assessed against a superseded planning scheme? If yes - complete Form 1 Attachment 1 DYes |JNo ls the application for development completely or partly on Cairns and Mackay airport land under the Airport Assets (Restructuring and Disposal) Act 2008? if yes - Assessment is by the Department of Infrastructure and Planning. Complete Form 1 Part D of DAS Application Form 1 if the ClYes |No application is for a material change of use, and Part E if for building or operational work. Also, the application must be referred to the local government as Advice Agency.
Page 16
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22 SEC l ION 1 Section 1 must be completed for all applications that require completion of the IDAS Assessment Checklist. HERITAGE ve : 2 _ _ : j 1.1A Is any part of the proposal intended to be carried out on a Queensland heritage place under the Queensland Heritage Act 1992? [X] No-Gotov.18 = (_] Yes IPA, schedule 8, part 1, lable 5, item 2: IP Regulation, schedule 2, table 2, item 18. 1.1B Does the proposal involve development intended to be carried out on a place entered in a local heritage register under part 11 of the Queensland Heritage Act 1992, other than if the place is on Cairns or Mackay airport land? DX] No-Gotoar.2 [] Yes IPA, schedule 8, part 1, table 5, item 2A, IP Regulation, schedule 1, part 2, table 5, tem 2. [REMOVING QUARRY MATERIAL; WILD RIVER AREA. ; : ‘ = / | 1.2 Does the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000? (&X] No-Gotoot3 [_] Yes IPA, schedule 8, part 1, table 5, item 1; IP Regulation, schedule 2, table 2, item 11; IP Regulation, schedule 1, table 5, item 2 (wild river area); Water Act 2000, section 966C; Wild Rivers Act 2005, section 43A [ENVIRONMENTALLV-RECEVANT ACTIVITY: WILD RIVER AREA 1.3 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity? No-Gotoar4 [(] Yes IPA, schedule 8, part 1, table 2, itam 1; IPA, schedule 8, part 1, table 5, items 3 and 4; IP Regulation, schedule 2, fable 2, items 1 and 23; Environmental Protection Act 1994, section 73AA (wild river area); Wild Rivers Act 2005, section 424; relavant wild river declaration; Wild Rivers Code, (WITHIN THE LIMITS OF A PORT i a me oe : | 1.4 Is any part of the premises within the limits of a port under the Transport Infrastructure Act 1994? KX] No -Goto075 LJ Yes IP Regulation, schedule 2, table 2, items 15 and 16 |DECLARED FISH HABITAT AREA 15 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994? DX] No - Goto 01.6 Oo Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule 8, this application requires assessment by the Department of Primary industries and Fisheries (DPI&F). if DPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Advice Agency. IP Regulation, schedule 2, table 2, item 26 [COMMUNITY INFRASTRUCTURE Zi 4 ig | 1.6 Is any part of the premises designated for community infrastructure? EX] No - Goto Q1.7 (Yes IP Regulation, schedule 2, table 3, item 7 WASTE WATER MANAGEMENT of : _ ee | V7 Does the proposal involve the establishment or expansion of a waste water disposal system? LX] No -Endof Section? [_] Yes IP Regulation, schedule 2, table 3, item 5
Page 17
y
“INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
SECTION 4 - Section 4 must be completed when the application seeks approval to carry out operational work.
PLANNING SCHEME ~ 2 = = 2 _t
44 Is the proposed operational work assessable under any State planning regulatory provisions?
JNo (] Yes
If no, is the proposed operational work assessable under the planning scheme?
O No - Goto Q4.2 & Yes - Complete Form 1, Part E and answer Q4.1.1 - 4.1.7 below
[STATE-CONTROLLED ROAD =“ ~ ‘ ~ es = 7]
4.1.1 Is any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
J No (] Yes
If no, is the proposed operational work for filling or excavating listed in Integrated Planning Regulation 1998,
schedule 5 and does it exceed the threshold?
IX] No -GotoQ4.1.2
oO Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
IP Regulation, schedule 2, table 3, item 3; 1P Regulation, schedule 2, table 3, item 1(b)
(ACID SULFATE SOLS®
—
@ 4.1.2 Is any of the operational work proposed in a local government area listed*” in State Planning Policy 2/02: Planning and Managing
Development Involving Acid Sulfate Soils
1 No - Goto 04.1.3 XI Yes
4.1 aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Cooloola, Douglas,
Fitzray, Gladstone, Geld Coast, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Mornington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday
{f yes, is the natural ground level of any point where work is being carried out less than 20m AHD?
&X] No
C1 Yes
IP Regulation, schedule 2, table 3, item 4; State Planning Policy 2/02: Planning and Managing Development involving Acid Sulfate Sails, section 3.6
EASEMENTS AND SUBSTATIONS : | . “|
4.1.3 \s any of the proposed operational work for filling or excavation?
(1 No - Goto 04.1.4
x] Yes
If yes, is the filling or excavation associated with reconfiguring a lot?
e@ [1 Yes - Goto 04.1.4
[X] No - Answer both (a) and (b) below
(a) _ Is any part of the premises subject to an easement in favour of a distribution entity or transmission entity under
the Electricity Act 1994?
[x] No
LJ Yes
(b) _ Is any of the operational work proposed to be located within 10m of a substation site under the Electricity
Act 1994?
X] No Oo Yes - This application must be referred to the entity responsible for the substation as Advice Agency.
IP Regulation, schedule 2, table 3 item 10fa); 1P Regulation, schedule 2, table 3, item 10(o)
4.1.4 \s any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number 1 issued under the
Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?
[X] No -Gotoa415 ([] Yes
JP Regutlation, schedule 2, table 3, item 17
If yes, is the proposed operational work for clearing native vegetation, as defined in draft South East Queensland Koala
State planning regulatory provisions (koala regulatory provisions)*??
[1 No -Gotoas3e [[] Yes
Page 18
.
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
[PUBLIC PASSENGER TRANSPORT | * se |
4.1.5 Is any of the proposed operational work listed in schedule 13C of the Integrated Planning Regulation 1998 and does it exceed the
specified threshold?
X] No- Go to 04.1.6 CJ Yes - This application must be referred to Queensland Transport (QT) as Concurrence Agency.
IP Reguiation, schedule 2, table 3, item 14
[RAILWAY SAFETY AND- EFFICIENCY me _- . . me : |
4.1.6 Is any of the proposed operational work Tsted in schedule 13D of the Integrated Planning Regulation 1998 and does it exceed the
specified threshold?
&) No- Go fo Q4.1.7 oO Yes - This application must be referred to QueenslandTransport (QT) as Concurrence Agency.
IP Regulation, schedule 2, table 3, item 15
|KOALA CONSERVATION (outsideSEQ urban footprint) <<". Re ut me ~ oe }
4.1.7 Is any part of the premises in a koala conservation area or koala sustainability area, other than in an SEQ urban footprint area?
(XJ No -Gotoa42 ((] Yes
IP Regulation, schedule 2, table 3, item 19
WILD-RIVER AREA - ARhOUgh legislation provides for assessment of operational works for residential, commercial.and industrial — -
development for the purposes of the Wild Rivers Act. 2005, currently. no. Geclarations for a y.of the wild r wild ti fiver are S2pply th the Wild ie Wild Rivers.
code: to:that-type-of- development STAR a EE : 4
ASSOCIATED WITH RECONFIGURING A LOT; RESIDENTIAL, COMMERCIAL OR INDUSTRIAL L DEVELOPMENT IN A Witp RIVER:
AREA ys ‘
Is any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is also assessable?
(KJ No -Gotoas3 ((] Yes
IPA, schedule 8, part 1, table 4, item 2; iP Regulation, schedule 1, part 2, table §, item 1(c)
Wild Rivers code (Note: the code does not currently contain applicable provisions for residential, industrial or commercial development inside a designated urban
area)
4.2
[KOALA CONSERVATION (Inside SEQ:urban footprint) ‘ ‘ . ce . My
4.3A Is any part of the premises in an interim koala habitat protection area?
(-] No -Gotoa438 [XX] Yes
IP Regulation, schedule 2, table 2, item 34A
\VEGETATION CLEARING; KOALA CONSERVATION; WILD:RIVER AREA“ = ES PM “es si , ql
4.3B ts any of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999
applies?
&X] No -Gotoas4 ((] Yes
IPA, schedule 8, part 1, table 4, items 1A-1G; IP Regulation, schedule 2, table 2, item 5 {vegetation clearing); IP Regulation, schedule 2, table 2, item 34 (koala
conservation); IP Regulation, schedule 1, part 3, table 4, item (vegetation clearing/wild river area); Vegetation Management Act 1999, section 22A (vegetation
clearing/wild river area): Wild Rivers Act 2005, sections 31F and 43A
he
iTAKING OR INTERFERING WITH WATER; WILD RIVER AREA: - . : |
4.4 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with water from a watercourse, lake or spring (other than using a water truck to pump water; and other than under
the Water Act 2000, section 20(2), (3) or (5)), or from a dam constructed on a watercourse or lake?
{] No -Gotoa45 [_] Yes - Answer (a) and (b) below
IPA, schedule 8, part 1, lable 4, items 3fa); 1 Regulation, schedule 2, table 2, item 8; IP Regulation, schedule 1, part 3, table 4, items 3 and 3A; Water Act 2000, section 966A (wild river
area); Wild Rivers Act 2005, section 434; relevant wild river declaration; Wild Rivers Code
4.5 \s any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with artesian water (other than using a water truck to pump water)?
4} No Goto 046 Oo Yes - (Complete Form 1, Part K;) This application requires assessment by the Department of Natural Resources and Water
(NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
IPA, schedule 8, part , iable 4, item 3(b); IP Regulation, schedule 2, table 2, tem 8; IP Regulation, schedule 1, part 3, table 4, tem 3
Wild Rivers code {Note: the code does not currently contain applicable provisions for taking or interfering with artesian water)
Page 19
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 22
46 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking
overland flow water (other than using a water truck to pump water)?
(XJ No -Gotoa47 (_] Yes - Answer (a) and (b) below
IPA, schedule 8 part 1, table 4, tem 3{c}{i); IP Regutatian, schedule 2, table 2, item 8; IP Regulation, schedule 1. part J, table 4, item 3; Waier Act 2000, section 966A (wild river area);
Wild Rivers Act 2005, section 43A; re'evant wild river declaration; Wild Rivers Cade.
47 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with subartesian water {other than using a water truck to pump water)?
[KJ No -Gotoo4s [_] Yes
IPA, schedule 8, part 1, table 4, item 3{c){ii): IP Regulation, schedule 2, table 2, item 8; IP Regulation, schedule 1, part 3, table 4, item 3
Water Act 2000, section 966A (wild river area)(Note: no current Wild River declaration identifies taking or interfering with subartesian water as assessable)
Wild River code (Note: the code does not currently contain applicable provisions for sub artesian water)
48 Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for
interfering with overland flow water (other than using a water truck to pump water)?
[K) No -Gotoa49 [_] Yes - Answer both (a) and (b) below
IPA, schedule 8, part 1, table 4, tems 3(c)() and 3d); IP Regulation, schedule 2, table 2, item 9; IP Regulation, schedule 1, part 3, table 4, tem 34; Water Act 2000, section 9668 (wild
fiver area); relevant wild river declaration; Wild Rivers Code.
4.9
\s the proposed operational work for the following?
(i)
@ (i) To increase the storage capacity of a referable dam by more than 10%
No (© Yes
{f yes to either or both (i) or (ji) above - (Complete Form 1, Part Ks) This application requires assessment by the Department of Natural Resources and
For the construction of a referable dam as defined under the Water Supply (Safety and Reliability)
Act 2008 No C1 Yes
Water (NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency.
IPA, schedule 8, part 1, table 4, item 4; IP Regulation, schedule 2, table 2, item 10
[TIDAL WORK; WILD RIVER AREA
4.10 Is any of the proposed operational work tidal work, other than excluded work defined under the IPA?
[X] No -Gotoa411 [_] Yes - Answer (a) and (b) below
IPA, schedule 8, part 1, table 4, item 5; IP Regulation, schedule 2, table 2, items 12, 14 and 17; IP Regulation, schedule 1, part 3, table 4, items 4A and 5
Coastat Protection and Management Act 1995, section 104A (wild river area)
[COASTAL MANAGEMENT DISTRICT; WILD RIVER AREA
4.11 Is any of the operational work proposed to be carried out within a coastal management district?
[X] No -Gotoas12 (] Yes
IPA, schedule 8, part 1, table 4, item 5; iP Regulation, schedule 2, table 2, tems 12 and 14; IP Regulation, schedule 1, part 3, table 4, items 4A and 5
@ Coastal Protection and Management Act 1995 Act 1995, section 104A (wild river area); Wild Rivers Act 2005, section 434
[WATERWAY BARRIER WORKS; WILD RIVER AREA: ek ae . ot NS }
4.12 Is any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?
No -Gotoa413 [_] Yes ,
IPA, schedule 8, part 1, table 4, tem 6 IPA, schedule 8, part 2, table 4, tem 2; Fisheries Regulation 1995 s113A (self-assessable codes); IP Regulation, schedule 2, table 2, item 28; IP
Regulation, schedule 1, part 3, table 4, item 6; Fisheries Act 1994, section 76D (wild rver area); Wild Rivers Act 2005, section 434.
|DECLARED FISH HABITAT AREA; WILD RIVER AREA . es : ee ; |
4,13 Is any of the operational work proposed to be carried out completely or partly within a declared fish habitat area under the
Fisheries Act 1994?
No - Goto 04.14
(Yes
IPA, schedule 8, part 1, table 4, item 7, (PA, schedule 8, part 2, table 4, item 3; Fisheries Regulation 1995 5113A (self-assessable codes}; /P Regulation, schedule 2, table 2, item 25; IP
Regulation, schedule 1, part 3, table 4, item 7; Wild Rivers Act 2005, sections 434; Fisheries Act, section 760C (wild river area).
[REMOVAL, DESTRUCTION OR DAMAGE OF A MARINE PLANT; WILD RIVER AREA
414
Is any of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 1994?
[XI No -Gotoas15 [] Yes
IPA, schedule 8, part 1, table 4, item 8; IPA, schedule 8, part 2, table 4, tem 4; Fisherias Regulation 1995 s113A (seif-assessable codes); iP Regulation, schedule 2, table 2, item 29; IP
Regulation, schedule 1, part 3, table 4, item 8; Fisheries Act 1994, section 7608 {wild river area): Wild Rivers Act 2005, section 434; relavant wild river declaration; Wild Rivers Code.
Page 20
‘ * INTEGRATEO PLANNING ACT 1997 IDAS Assessment Checklist, Version 22 IWILD-RIVER AREA *- = mt oe > oe =] 4.15 Is any of the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2005? BX] No -Gotoa416 [[] Yes IPA, schedule 8, part 1, table 4, item 10; IP Regulation, schedule 2, fable 2, item 37; Wild Rivers Act 2005, sections 42, 43A z : Se ISTATE-CONTROLLED ROAD ..< “Bane Pe oo , ce 4.16 Is any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road? [X] No - End ofsection4 (_] Yes IP Regulation, schedule 2, table 2, item 3 Disclaimer: While the Department of Infrastructure and Planning (DIP) believes that this information contained on this form and provided as part of this process will be of assistance to you, it is provided on the basis that you will not rely on the information without first making your own enquiries regarding the interpretation and application of the applicable legislation to your circumstances. To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or other consequence which may arise from your reliance on this process and the information contained on this form,
Page 21
\@ opment FEES & CONTRIBUTIONS
S U n S hi | n C C Oa St |? De® Please Retum to Admin Officer, Development) e
| Regional Council
Payee Name:
Address:
Application Fees
Road / Drainage Plan Exam
Road / Drainage Field Inspection
Legal Document Examination
Sealing Fee - Survey Plans, Legal Documents
Sale of Documents, Policy Lists, Misc
Bonding Admin Fee (Contributions, uncompleted works)
Closed Circuit TV Inspection
Pre-lodgement Meeting Fee
| CALCULATIONS 2. Siia4 66.3
Lot Calculation
.| Plan Examination Caiculation
Developer Contribution — Landscaping
Developer Contribution - Road Other than PSP
Developer Contribution - Drainage Other than PSP
Developer Contribution - Pathway Other than PSP
Developer Contrib. — In Lieu Off St Parking (PSP13 Car parking)
ICS — Community Land (Not currently active) |--—_———+-53 Catchment:
561
ICS - Public Transport
ICS - Sewerage (PSP Rural)
ICS - Sewerage (PSP Coastal)
ICS - Sewerage - South Peregian (PSP Maroochy)
ICS - Water Supply (PSP)
Road/Section:
APPLICATION'DETAILS.
PayeeName: St Thomes More Sunchine Beach
Address:
ICS - Sport and Recreation Land (PSP Parks)
ICS - Drainage (PSP Noosaville Master & Ward Street)
ICS - Road (CMRNICP) !f BA not entered then use 594
ICS ~ Pathway (PSP)
Cfo S7arfoo Gasolhas
PO Box 1684
Noosa Héaos Qtro LSE?
Development tocavion:
Y Jhonne plore fckool
-YPE | File Numbers or Reference:
/i.. 2004. 0945. |
Date application properly made: (F/F/04%
Receipt No: ><) ? Receipt Date: 1 |
Total of Fees Paid (Excluding Bonds) $ {a2
P:/Land DevelopmentFEES & CONTRIBUTIONS/DEVELOPMENT FEES.doc
ae
|
Used in these records
09/0945 - Operational Works - Minor Earthworks - Cricket Nets & Netball Courts [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.