Council archive · source document
09/0945 - Operational Works - Minor Earthworks - Cricket Nets & Netball Courts [As Published] · 142009.945
. INTEGRATED PLANNING ACT 1997 Part A, Vession 3.1, 3 March 2008
Table D Complete if the premises are adjacent | toor associated with a water er body, watercourse or or aquiler (e.g. river, creek, lake, cana)
[1
3. Indicate the total area of the premises on which the development is proposed: (Note: The total area may include land both abave and below water)
ae ~.Total:aréa of premisés 1%
4,00 (rm? [x] hectares (Tick applicable unit)
Existing use of the premises issnessg Spe "Kye Pe ere
4. Current use/s of the premises: (e.g. vacant land, house, townhouses, apartment building, shop, service station, school, sugar cane farming etc.)
Co
[1 | School and associated facilities
Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overtand flow, water etc.)?
x] No 0 Yes - Ensure the type, location and dimensions of each easement are included in plans. submitted with the application
{Proposal details
Bi
sd d
6. Brief description of the proposal (e.g. 6 uni apartment building, 30 lot residential subdivision, a bore, aquaculture)
Clearing of vegetation and associated earthworks for cricket nets and netball courts
7. Does the poposal include new buildings or operational work (including any services) on the premises?
O No x] Yes - Ensure the nature, location and dimensions of the proposed works are included in plans, submitted with the application
(Resource entitlement (if appicable) { futher information is provided in the advice section at the end of.the form
8. Does the application involve taking or interfering with a State resource and therefore require a resource entitlement? (e.g. the application
involves State land (leased and freehold), declared Fish Habitat areas, taking quarry material, taking or interfering with water under the Water Act 2000, etc.)
No - Goto Q9 O Yes - Complete Table G - provide details for each evidence required on a separate row, if applicable. Evidence of resource
allocation or entitlement must be submitted with the application. You do not need to answer Q9 - go to the next section
( Owner's consent (applicable) "further infomation is provided in the advice section at the end ofthe form
9. Complete Table H for applications involving a material change of use; reconfiguration of a lot; work on n land below high-water mark and
not within a canal as defined under the Coastal Protection and Management Act 1995; or work on rail corridor land defined under the
Transport Infrastructure Act 1994 - provide delails for each owner on a separate row, or on an attachment to this form if applicable.
Table H Premises Owner's namels
Corporation of Trustees of
1 the Roman Catholic St Thomas More School
Archdiocese of Brisbane
* Owner's signature cannot be provided on the form if you intend to submit the application electronically. Owner's consent must be provided to the assessment manager on an
attachment containing appropriate written documentation of the owner's consent. If the owner is a company, s127 of the Corporations Act 2001 (Cweatth) details how a
company may sign as owner. Templates for the provision of owner's consent are available on the IPA website .
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/0945 - Operational Works - Minor Earthworks - Cricket Nets & Netball Courts [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.