09/0945 - Operational Works - Minor Earthworks - Cricket Nets & Netball Courts [As Published] · 142009.945
y
“INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
SECTION 4 - Section 4 must be completed when the application seeks approval to carry out operational work.
PLANNING SCHEME ~ 2 = = 2 _t
44 Is the proposed operational work assessable under any State planning regulatory provisions?
JNo (] Yes
If no, is the proposed operational work assessable under the planning scheme?
O No - Goto Q4.2 & Yes - Complete Form 1, Part E and answer Q4.1.1 - 4.1.7 below
[STATE-CONTROLLED ROAD =“ ~ ‘ ~ es = 7]
4.1.1 Is any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
J No (] Yes
If no, is the proposed operational work for filling or excavating listed in Integrated Planning Regulation 1998,
schedule 5 and does it exceed the threshold?
IX] No -GotoQ4.1.2
oO Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
IP Regulation, schedule 2, table 3, item 3; 1P Regulation, schedule 2, table 3, item 1(b)
(ACID SULFATE SOLS®
—
@ 4.1.2 Is any of the operational work proposed in a local government area listed*” in State Planning Policy 2/02: Planning and Managing
Development Involving Acid Sulfate Soils
1 No - Goto 04.1.3 XI Yes
4.1 aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Cooloola, Douglas,
Fitzray, Gladstone, Geld Coast, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Mornington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday
{f yes, is the natural ground level of any point where work is being carried out less than 20m AHD?
&X] No
C1 Yes
IP Regulation, schedule 2, table 3, item 4; State Planning Policy 2/02: Planning and Managing Development involving Acid Sulfate Sails, section 3.6
EASEMENTS AND SUBSTATIONS : | . “|
4.1.3 \s any of the proposed operational work for filling or excavation?
(1 No - Goto 04.1.4
x] Yes
If yes, is the filling or excavation associated with reconfiguring a lot?
e@ [1 Yes - Goto 04.1.4
[X] No - Answer both (a) and (b) below
(a) _ Is any part of the premises subject to an easement in favour of a distribution entity or transmission entity under
the Electricity Act 1994?
[x] No
LJ Yes
(b) _ Is any of the operational work proposed to be located within 10m of a substation site under the Electricity
Act 1994?
X] No Oo Yes - This application must be referred to the entity responsible for the substation as Advice Agency.
IP Regulation, schedule 2, table 3 item 10fa); 1P Regulation, schedule 2, table 3, item 10(o)
4.1.4 \s any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number 1 issued under the
Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?
[X] No -Gotoa415 ([] Yes
JP Regutlation, schedule 2, table 3, item 17
If yes, is the proposed operational work for clearing native vegetation, as defined in draft South East Queensland Koala
State planning regulatory provisions (koala regulatory provisions)*??
[1 No -Gotoas3e [[] Yes
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/0945 - Operational Works - Minor Earthworks - Cricket Nets & Netball Courts [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.