Council archive · source document
09/0945 - Operational Works - Minor Earthworks - Cricket Nets & Netball Courts [As Published] · 142009.945
A review of the proposal against the provisions of the Earthworks Code is detailed below: Specific Outcomes O1 Finished surface levels ensure land is free draining Acceptable Solutions or Probable Se PHeEsy S1.1 The finished surface gradient of any filed or excavated area is within the range of 0.5% to 1.5% and drains to Council stormwater infrastructure where available or where stormwater infrastructure is not available, toward the street. Oe oEs Complies - stormwater will drain to surrounding landscaped setback areas. O2 Any change to the level of the land does not have an adverse flooding impact on the feoding and drainage characteristics off site. No Solution provided Complies - courts will be self draining 03 Earthworks do not result in geotechnical instability on the premises or nearby premises $3.1 Filling works are undertaken in accordance with Section 2.8 Filling of Site of Councils PSP 5 - Engineering Design Standards - Roads and Drainage & Earthworks AND $3.2. Where the filling is for residential, commercial or industrial purposed the works comply with Sections 3 to 6 of AS 3798 - Guidelines for earthworks on commercial & Residential development Complies - Minor filling works proposed with only 60 cubic metres proposed 04 Earthworks do not cause disturbance to the amenity of the neighbouring land. S 4.1 The following control measures ere implemented - &) regular water spraying of exposed areas fo suppress dust; b) provision of dust stabilized or sealed intemal roads; ¢) protective covering of exposed areas that are left for more than 2 weeks; and ) if there is no valid development permit for the site, disturbed areas are revegetated using species identified in PSP 3 Landscaping Plant and Guidelines; AND S42 Earthworks are undertaken only during the hours of 7 am to 6pm, Monday to Friday and 7am to 6 pm on Saturday. No work is undertaken on Sunday or public holidays. The applicant will comply with the provisions of the relevant code. O5 Vegetation cleared from a development site is disposed of in an environmentally responsible manner. $5.1 Cleared vegetation is transported off site for disposal in an approved green waster disposal facility. OR S52 Cleared vegetation is muiched on Site and reused fro landscaping of the finished development; OR 85.3 Cleared vegetation is disposed of for the purposed of firewood. ( Note: Disposal of vegetative waste by buming off is not an acceptable method of disposal The applicant will provisions of the code. comply with the O6 Materials used as fill are suitable for development of the land and filling or excavation do not resuit in contamination of the land. S6.1 The fil material is solid clean earth, free of putrescible or refuse material, vegetation, acid sulfate soils, building or construction material or other material of contaminants; AND $6.2 The site is not on the contaminated land register The applicant will provisions of the code. comply with the O07 Haulage of material to and from a site | No solution provided. The applicant will comply with the ensures- provisions of the code. 8) minimal disturbance to neighbouring properties and properties along the haulage route and 5) Council's road infrastructure including pavement is not adversely affected. O8 Earthworks are contained within the | $8.1 All earthworks including cut and fil | Complies subject property batters, retaining wail ete are contained within the subject site. 09 Sioping sites $9.7 Not relevant Page 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/0945 - Operational Works - Minor Earthworks - Cricket Nets & Netball Courts [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.