Minor Change Report OPW19 0203 03 [As Published] · OPW19/0203.03
19269 CD-201 E PLANTING SCHEDULES, prepared by 13/01/2020
Project Urban
19269 CD-202 C LANDSCAPE NOTES, prepared by Project 13/11/2019
Urban
Applicant’s Request
The applicant has not indicated which conditions are to change but it is determined that by
supporting the change only Condition 1 requires amendment <
Assessment of Request
The request changes relate to:
i. Changing the alignment of the stormwater line that exits the new gully pit in the cul-de-sac
from crossing the road formation to a new pit located within the site’ and
ii. Changing a number of internal stormwater pits.
The realignment of the stormwater line eliminates the need to open the existing road formation and
is supported. The changes to the internal pits does not impact on the performance of the drainage
system and is also supported.
It is recommended that Condition 1 be amended to read as follows:
Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
18556 – C109 F Roadworks and Stormwater Layout Plan – 25/01/2024
Sheet 1 of 2, prepared by TOD Consulting
18556 – C110 E Roadworks and Stormwater Layout Plan – 13/01/2020
Sheet 2 of 2, prepared by TOD Consulting
18556 – C111 C Cul-De-Sac Detail and Sections, prepared 03/12/2019
by TOD Consulting
18556 – C115 C Signs and Pavement Marking Layout Plan 03/12/2019
Sheet 1 of 2, prepared by TOD Consulting
18556 – C116 C Signs and Pavement Marking Layout Plan 03/12/2019
Sheet 2 of 2, prepared by TOD Consulting
18556 – C117 G Stormwater Drainage Rain Gardens Details, 25/01/2024
prepared by TOD Consulting
18556 – C118 C Stormwater Drainage Longitudinal Sections 03/12/2019
Sheet 1 of 3, prepared by TOD Consulting
18556 – C119 G Stormwater Drainage Longitudinal Sections 25/01/2024
Sheet 2 of 3, prepared by TOD Consulting
18556 – C120 C Stormwater Drainage Longitudinal Sections 03/12/2019
Sheet 3 of 3, prepared by TOD Consulting
19269 CD-001 E Cover sheet, prepared by Project Urban 13/01/2020
Page 5 of 7
Document Set ID: 22799910
Version: 2, Version Date: 08/02/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Report OPW19 0203 03 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 552 KB (small file)
- File type
No other editions are linked here.