Council archive · source document
07/0466 - MCU - Fetached House - Bruce Alan Neville [As Published] · 132007.466
INTEGRATED PLANNING ACT 1997 Integration of tand use and public transport . For more information refer to Guide 23, schedule 8A of Ihe IPA, & schedule 2 of the 1P Requiation. Unless you answered "none of the above”, the application triggers referral to QT as a concurrence agency. 22. The application involves: (tick the applicable box/es)—~ IDAS Assessment Checklist, Version 19.0, 2 March 2007 (1 (i) a material change of use assessable against the planning scheme for a purpose mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that schedule. 0 (ii) reconfiguring a lot— C1 (a) ‘ on land that is completely or partly within a public transport corridor, and the totat number of lots increases; LJ (b) _ on land that is completely or partly within a future public transport corridor or an airport's public safety area; (1) _ on|and that is within 400m of a public passenger transport facility or a future public passenger transport facility, and the total site area is 5000m? or greater; [1 ) for aresidentiat purpose within the 25 ANEF contour for an airport; (De) for aresidential purpose resulting in 100 or more allotments. Lil) operational work assessable against the planning scheme, but not associated with a material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii) above, on land that— C1 (a) is completely or partly within a public transport corridor or a future public transport corridor; (J (b) will result in work that encroaches into an airport's operational airspace. (1 (iv) none of the above. Railway safety and efficiency For more information refer to Guide 23, schedule 8A of the IPA & schedute 2 of the IP Regulation. Unless you answered “none of the above", the application triggers referral to QT as a concurrence agency. 23. The application involves: (tick the applicable box/es)— (Wi) a material change of use assessable against the planning scheme for a purpose mentioned in schedule 13D of the iP Regulation and exceeding the thresholds set by that schedule. O (ii) recontiguring a lot C1 (a) on tand that is completely or partly within a future public transport corridor, future railway land or a railway tunnel easement; (1 (b) on land that is within 400m of a Citytrain passenger railway station or a future’ Citytrain passenger railway station, and the total site area is 5000m? or greater; C1 (c) — ontand that abuts rail corridor land, commercial corridor land or future railway land, and the total number of lots increases; (4 (a) on land that abuts rail corridor land, commercial corridor land or future railway - land and an easement abutting the corridor or future railway land is created; CJ (e) — onland that is completely or partly within 100m of, and abutting an approach to, a railway level crossing, and the total number of lots increases; (1 () for aresidential purpose resulting in 100 or more allotments. O (ii) operational work assessable against the planning scheme, but not associated with a material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii) above, involving extracting, excavating or filling greater than 50m3, on land that— (a) _ is completely or partly within rail corridor land or commercial corridor land, and the work is not for rail transport infrastructure or other rail infrastructure; CJ (b) is completely or partly within future railway tand, or a railway tunnel easement; (1c) abuts rail corridor land, commercial corridor land or future railway land, and the work is within 25m of the railway boundary. C1 (iv) none of the above. Moonie to Brisbane pipeline For more information refer to schedule 2of the IP Regulation. Unless you answered “none of the above”, the apptication triggers referral to the holder of pipeline licence No 1 issued under the Petroleum Act 1923, currently Santos QNT Pty Ltd, for advice. 24, The application involves the easement for the construction or operation of the Moonie to Brisbane strategic pipeline, and involves: (tick the applicable box/es)— CO (i) a material change of use assessable against the planning scheme and not associated with reconfiguring a lot, and any structure or work will be located wholly or partly in the easement. O (ii) reconfiguring a fot (C1 (iii) operational work assessable against the planning scheme, that is filling, excavation, compaction, drilling, boring or piling not assaciated with a reconfiguring a lot, and the work is located wholly or partly in the easement. C1 (iv) none of the above. Page 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0466 - MCU - Fetached House - Bruce Alan Neville [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.9 MB (small file)
- File type
No other editions are linked here.