Council archive · source document
0015A784.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
> ae ENVIROMENTAL te WASTEAN ATE H TOQUITMTER
4 CERTIFICATE OF COMPLIANCE
July 29, 2005
CLEARMAKE GROSS POLLUTANT TRAP
Model No: GPT
CERTIFICATE OF COMPLIANCE
This product was examined and tested by the Urban Water Resources Centre at the University of
South Australia in October 2004.
The test results, which are available upon request, state that the GPT complies with the following
performance criteria:
Maximum Flow Rate
The unimpeded flow rate is 33 L/s when the flow depth over the grate is 100mm.
Treatment Flow Rate
The treatment flow rate when the GPT is subjected to a 3 month typical loading of debris is 8.5 L/s.
Pollutant Retention
Flow rate for a Q3 event calculated at 58.5 mm/hr (50% of a Brisbane Q1 event at 117 mm/hr) and a
collection area of 400m? is 6 L/s. At this flow sediment retention was 95% and free floating oil
retention was at least 99%.
I hereby warrant the above information to be correct as stated.
Brent Lenehan
Managing Director
Clearmake Pty Ltd
ran EB
© 2005 Clearmake page 7 of 8
Clearmake GPT Maintenance Manual 111105-02.doe printed: June 15, 2007See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015A784.001.pdfRelated documentPublic source context ↗
07/0836 - Information Response [As Published]Related documentApplication case desk ↗
About this file
- File size
- 896 KB (small file)
- File type
No other editions are linked here.