Original source · versioned page text
APPROVED Decision Notice MCU17/0076
Officer: :Wilhelm Koschade Direct Telephone: :5329 6215 Our Reference: :MCU17/0076 Your Reference: :170414 5 September 2017 HK Lee C/- Adams Sparkes Town Planning & Development PO Box 1000 BUDDINA QLD 4575 [email protected] Dear Sir/Madam Decision Notice Sustainable Planning Act 2009 I refer to your application and advise that on 4 September 2017, Council decided to approve the application in full subject to conditions. Details of the decision are as follows: 1. APPLICATION DETAILS Application No: MCU17/0076 & OPW17/0224 Street Address: 25 Edward St NOOSAVILLE QLD 4566 Real Property Description: Lot 6 RP 112875 Planning Scheme: The Noosa Plan (28 October 2016) 2. DECISION DETAILS The following type of approval has been issued: Development Permit for Material Change of Use of Premises Multiple Housing Type 2 Duplex; and Development Permit for Operational Work (Earthworks, Landscaping, Carparking, Access & Stormwater). 3. RELEVANT PERIOD OF APPROVAL The relevant period for the Material Change of Use approval is 4 years starting the day that this development approval takes effect. The relevant period for the Operational Works approval is 2 years starting the day that this development approval takes effect. 4. ASSESSMENT MANAGER CONDITIONS Development Permit for Material Change of Use PLANNING When Conditions must be Complied With Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to the use commencing, and then compliance maintained at all times while the use continues. Approved Plans Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date 02 6 Site Plan drawn by Icon Building Design 02/08/2017 03 6 Ground Floor drawn by Icon Building Design 02/08/2017 04 6 First Floor drawn by Icon Building Design 02/08/2017 05 6 Elevations (North & East) drawn by Icon Building Design 02/08/2017 06 6 Elevations (South & West) drawn by Icon Building Design 02/08/2017 Development authorised by this approval must be undertaken generally in accordance with the Approved Plans listed within this Decision Notice. Building Height The maximum height of the development must not exceed 8 metres above the finished ground level and the natural ground level. Certification must be submitted to Council from a Licensed Surveyor which certifies that the building does not exceed the maximum height requirement of this Decision Notice. Performance Bond Security in the form of a cash bond or trading bank guarantee to the sum of $10,000 must be submitted to Council, to secure performance of all conditions of this approval, prior to pre-start meeting. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. Council reserves the right to call upon the bond or guaranteed sum to effect compliance with conditions. Water & Sewer Connections An underground connection to reticulated water and sewerage must be provided to the development site in accordance with the standards and requirements of Northern SEQ Distributor–Retailer Authority (Unitywater). A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority (Unitywater) must be submitted to Council that certifies an underground connection to reticulated water and sewerage has been provided to each development site. Building Appearance All air conditioning units or other mechanical equipment must be fully enclosed or screened such that they are not visible from the street frontages nor adjoining properties. All deck and balcony areas above ground floor must not be enclosed by permanent fixtures such as shutters, louvres, glass panelling or the like, where required to satisfy any privacy condition of this Decision Notice. Fencing and Walls Fencing on the front boundary must not exceed a maximum height of 1.2m and be of open construction. The area of land between the fence and the front property boundary must be densely landscaped to screen any fencing from the street. Clothes Drying Areas Each dwelling unit must be provided with access to an outdoor clothes line which is screened from public view. Community Management Statement Any proposed Community Management Statement required for the development pursuant to the Body Corporate and Community Management Act 1997 must be submitted to Council for endorsement at the same time as submission of the Building Format Plan (or similar) to Council for compliance assessment. Landscaping The development site must be landscaped prior to the commencement of use. The works must be undertaken in accordance with landscape areas shown on the Approved Landscape Plans. All landscape works must be maintained generally in accordance with the approved design for the life of the development. All landscape works must be established and maintained in accordance with horticultural best practice with construction techniques that allow for healthy, sustained and vigorous plant growth. All plant material must be allowed to grow to full form. Waste Where the development involves the removal, relocation or demolition of a building, a Waste Management Plan (construction and demolition) shall be submitted and approved by Council’s Environmental Health Officer prior to issue of a development permit for operational works for demolition, removal or relocation of any building other than a shed. The purpose of the Waste Management Plan is to facilitate the segregation of waste for the effective reuse and recycling of such materials. Segregated wastes attract significantly reduced disposal fees at the landfill with some items free. Higher gate fees are charged for mixed waste. Waste Management Plans (construction and demolition) are required to be submitted in accordance with Planning Scheme Policy 11, Waste Management Plans. Waste storage areas are to provide for adequate separation of all reusable, recyclable and waste materials. These shall be located so that they are convenient and safe to use. The Plan shall contain the following information: The site area for the storage and separation of waste is to be shown on the plan drawings accompanying the application. A waste management table as indicated below is to be completed showing how waste material is to be segregated - recycled – reused or disposed. Table – Waste Management Table MATERIALS ON-SITE DESTINATION Re-use and Recycling Disposal Expected waste materials Estimated volume(m³) On-site *specify proposed re-use or on-site recycling methods Off-site *specify contractor and recycling outlet *specify contractor and landfill site or other disposal site Excavation material Green waste Bricks Concrete Timber-please specify Plasterboard Metals - please specify Asbestos Other - please specify Note * If a demolition contractor is undertaking works, then the Waste Management table is to be completed by the demolition contractor. Waste Storage The developer must provide waste storage and disposal facilities in accordance with Planning Scheme Policy 9, Waste Management, including an external imperviously paved area correctly sized for all refuse and recycling containers and suitably screened from public places and neighbouring properties. Noise Written certification is required from a suitably qualified person confirming that sound pressure levels from all mechanical plant and equipment comply with the following : Air-conditioning and Refrigeration 7am to 10pm: Maximum level allowable = background + 5dB(A) 10pm to 7am: Maximum level allowable = background + 3dB(A) Pumps 7am to 7pm: Maximum level allowable = background + 5dB(A) 7pm to 10pm: Maximum level allowable = background + 3dB(A) 10pm to 7am: No audible noise. Assessment and certification is required immediately after installation of the equipment and prior to any occupation of the building. All equipment should be operating at the same time to test the overall noise level created, with the measurement location at either the residential boundary or outside the most exposed part of an affected building - whichever is the closest to the plant/equipment. The certification must be submitted to Council, which certifies that operational noise from any fixed plant and equipment complies with the requirements of this Decision Notice. Advice: It is highly recommended that the person you engage to certify the installation is involved at the plan development stage so they can recommend where this equipment is best located. They can also advise about noise enclosures and can make other suggestions to avoid noise problems. It is a lot more costly to try and deal with noise problems after everything is built. Noise from residential building works shall comply with the following – Limited to between 6:30am to 6:30pm Monday to Saturday. All reasonable measures are taken to minimise noise emissions. Not permitted on Sunday or public holidays. Measurement of Noise Measurement of sound pressure levels (adjusted for tonality and impulse) must be in accordance with either: (a) Australian Standard AS1055.1 “Acoustics–Description and measurement of environmental noise – General procedures”, or (b) The relevant “Noise Measurement Manual” as provided by the Department of Environment and Heritage Protection. A qualified person is considered to be either: (a) a Registered Professional Engineer of Queensland, or (b) an environmental consultant with a minimum of 3 years current experience in the field of acoustics. Acoustic Advice & Design It is highly recommended that the developer seek the advice and design input of a qualified acoustic consultant at the plan development stage to ensure the development does not cause a noise nuisance under the Environmental Protection Act 1994. Attention should be given to the following (but not limited to) : building design and construction design, selection and installation of fixed plant and equipment the location of air conditioning and heating units, refrigeration plant, pumps, mechanical exhausts and plant rooms etc the use of acoustic enclosures/screens around noisy plant and equipment operating times Environmental Protection The development should be undertaken in a manner that causes no unlawful environmental nuisance under the Environmental Protection Act 1994 by the creation of excessive noise, lighting, waste, atmospheric pollutants (including dust or odours) or other releases to the environment. In accordance with the Environmental Protection Act 1994, all sand, silt, mud, paint, cement, concrete, builder’s waste or other prescribed contaminants should not to be released to or be placed where it could reasonably be expected to move into a roadside gutter, storm water drain or a watercourse. On the spot fines apply for such offences. ENGINEERING External Works Street for the length of its frontage to the subject site must be upgraded in accordance with an Operational Works approval and must include in particular: Providing concrete pathway at minimum width of 1.2m along the frontage of the site and be extended as may be necessary to achieve smooth connection and acceptable transition with the existing pathway. Removal of the existing redundant property accesses and reinstatement of the kerb & channel and verge area to match the balance of the site frontage, including the provision of topsoil and turf where the existing verge is grassed. Replacement of any damaged, irregular or substandard sections of kerb & channel. Amendment to any linemarking if required. Site Access and Driveways A sealed access driveway must be provided generally in accordance with the approved plans and in compliance with the Operational Works conditions of this permit. The works must include in particular crossover in compliance with IPWEA Standard Drawings RS-049 and RS-050. Car Parking A minimum of 3 car parking spaces must be provided on the site. The works must include in particular: Sufficient turning area within the site to permit a vehicle to reverse from the garaging and exit the site in a forward gear in a total of 2 movements. Crossfalls, gradients and dimensions in accordance with Australian Standard AS2890:1 Parking Facilities. Stormwater Drainage The site must be provided with a stormwater drainage system connecting to a lawful point of discharge. The works must comply with the Operational Works conditions of this permit and include in particular: Collection and discharge of stormwater to the kerb and channel at the frontage of the site. The use of gravity stormwater drainage. Provision of approved kerb adapters for all new outlet points. Adequate overland flowpath to convey stormwater runoff to ensure no adverse impact on the proposed development or other adjoining site during major storm events (eg up and including 1% AEP rainfall storm event). Electricity and Telecommunication Services Reticulated electricity and telecommunication services must be provided to each dwelling in accordance with the applicable standards and the requirements of the relevant service provider and certification must be submitted to Council from all relevant service providers which certifies that the development has met the requirements of this Decision Notice and all applicable legislation at the time of construction. Unless otherwise stipulated by telecommunications legislation at the time of construction, the development must be provided with all necessary conduits, pits and pipes to accommodate the future connection of optic fibre technology telecommunications. Earthworks and Retaining Walls All fill and associated batters/retaining walls must be contained entirely within the subject site unless written permission from the respective landowner(s) is provided to Council. All earthworks must be undertaken in accordance with the provisions of Australian Standard AS3798: Guidelines on Earthworks for Commercial and Residential Developments. Existing Unitywater Infrastructures A written approval must be obtained and submitted to Council from the service authority (Unitywater) for the works over and adjacent to the existing sewer main on the property (including the filling and retaining wall over the sewer main). Easements Easements must be created over all existing and proposed public infrastructures within the site unless approved otherwise in writing by the respective service authority. All easements must be designed in accordance with the planning scheme or the requirement of relevant service authority and granted at no cost to the Grantee. Where the Grantee is Council or a service authority, the easement documentation must be in accordance with the Grantee’s standard easement terms. Draft easement documentation must be submitted to Council for endorsement. All building works and structures must be kept clear of any existing or proposed easements on the subject land, unless agreed otherwise in writing by the Grantee. Development Permit for Operational Works APPROVED PLANS Development works undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan/Drw No. Rev. Plan Title Date 7508 – C001 02 Title Sheet, Drawing Index & Locality Plan, prepared by Inertia Engineering (RPEQ No: 9382) 03.08.2017 7508 – C200 02 Bulk Earthworks Layout Plan, prepared by Inertia Engineering (RPEQ No: 9382) 03.08.2017 7508 – C410 02 Stormwater Drainage Layout Plan, prepared by Inertia Engineering (RPEQ No: 9382) 03.08.2017 LD1 A Landscape Plan (Sheet 1/4), prepared by Anembo Consultants 26.06.2017 LD2 A Landscape Plan (Sheet 2/4), prepared by Anembo Consultants 26.06.2017 LD3 A Landscape Plan (Sheet 3/4), prepared by Anembo Consultants 26.06.2017 LD4 A Landscape Plan (Sheet 4/4), prepared by Anembo Consultants 26.06.2017 PLANS REQUIRING AMENDMENTS The applicant must submit a revised amended plan as outlined in the following table to be approved by Council prior to requesting a prestart meeting and any works commencing on site. Plan/Drw No. Rev. Plan Title Date 7508 – C300 02 Access & Grading Layout Plan, prepared by Inertia Engineering (RPEQ No: 9382) 03.08.2017 Amendment Required Amend driveway cross section (Section A) to provide 1.2m wide pathway at crossfall grade of 2.5% as required by IPWEAQ Standard Drawing SEQ R050. Amend the driveway and slab layout plan with the new revised finished levels. Prior to Commencement of Works Any conflict between the development and an existing or proposed service must be referred to the relevant service authority for determination prior to the prestart meeting. The proposed filling and structural wall over the existing sewer main must comply with Unitywater requirements. A written approval in this regard must be obtained from Unitywater and submitted to Council prior to requesting the prestart meeting. Council must be contacted at least 5 working days prior to any works commencing to organise a prestart. The contact number to arrange a pre-start meeting is 5329 6291*. The pre-start meeting must include the relevant parties for the following aspects of the works: Civil engineering works. Erosion and sediment control works. Landscaping works. * Refer to Advisory Notes of this permit. At least 5 working days prior to any works commencing, written advice must be provided to Council detailing: The name, contact details and ACN for the supervising Registered Professional Engineer of Queensland (RPEQ) and Principal Contractor. Proposed dates for commencement and completion of construction. The principal contractor must have all the appropriate insurance and public liability documentation to carry out the works. The principal contractor is also responsible to ensure that any subcontractors also have the appropriate insurance and public liability documentation. Certificates demonstrating currency of public liability insurance and works insurance covering the works must be submitted to Council prior to the prestart meeting. Any changes to the details associated with the supervising RPEQ or Principal Contractor during construction, must be notified to Council in writing within 5 business days of the change occurring. Condition report/s including photographs must be completed and submitted to Council prior to the prestart meeting and prior to any works commencing: The frontage of the site including kerb line. All fences and retaining walls bordering the site. Any existing works, buildings and structures on the adjoining properties that could potentially be destabilised or impacted on by the proposed operational works. A Construction Management Plan must be submitted to Council for approval prior to the prestart meeting and must specifically address the following: Traffic Management during all aspects of the construct phase including: A Traffic Management Control Plan in accordance with Manual of Uniform Traffic Control Devices (MUTCD) detailing all temporary signage and traffic control measures prior to construction commencing. Details on the location of imported fill sources, the haulage route, type of vehicle to be utilised during filling operations and frequency of usage. NOTE: any damage to the existing road system as a result of haulage operations must be fully repaired at the applicant’s expense Maintenance of safe pedestrian and cyclists access across the frontage of the site both during daily construction and after daily construction has ceased for all stages of development. Fencing to the site during the construction phase of the development. Providing safe and adequate parking arrangements for all machinery and cars during construction phase without adversely impacting on the traffic flows, traffic safety and the availability of public parking spaces in the local streets. Effective procedures and measures to minimise adverse environmental impact on other properties and roads users including noise and dust emission. Maintenance and protection of water quality and existing drainage lines through the construction site through the implementation of appropriate erosion and sediment control measures (also refer to Erosion & Sediment Control conditions). Works programme identifying key components of the works and their respective durations. Establishment of a communication and contact protocol with the neighboring owners, to advise of construction times, impacts on traffic and services and other relevant issues. During Construction General Safe pedestrian access on all streets in the vicinity of the development must be maintained at all times. Should footpath/road closures be necessary to carry out construction works, Council’s Engineering Officer must be notified prior to the proposed closure and all requirements complied with. All frontage works must match neatly with existing road and verge/footpath features. Where required, additional works beyond the frontage may be required to provide an acceptable transition to existing road and verge/footpath profiles. Any damage caused to existing services and to Council and public assets as a result of the development works must be repaired at no cost to the asset owner at the following times: Where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or Where otherwise, upon completion of the works associated with the development. Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval. All operational works must be supervised by a Registered Professional Engineer of Queensland (RPEQ) who is independent of the Developer and Principal Contractor, and they must certify that all completed engineering works conform to the conditions of this Operational Works permit and the intent of the engineering design. Where municipal works are involved, such confirmation must be submitted for the respective hold points prior to any site inspection by Council Officers. All works must be constructed and work procedure undertaken in accordance with: The approved plans/documents and conditions detailed in this Decision Notice. All relevant Noosa Council Planning Scheme Policies, standard drawings, standard specifications and guidelines. Provision of the Work Health and Safety Act and such other legislation as is applicable to workplace health and safety. Pathway and Reinstatement Works within Road Reserve A 1.2m wide new public pathway shall be provided generally in accordance and must comply with but not limited to following requirements: Must comply with Standard Drawing SEQ R-065. Must have cross fall grade of 2.5% for the full width of the pathway. All paths must have a slip resistant surface. Expansion and contraction joints must provide a flush finish. Installation of joints by saw cutting is preferred to ensure a smooth ride for cyclists. To include any relocation, modifications or alterations to all existing surfaces, service covers and the like to ensure they finishes flush with the footpath so as not to create changes to grades or a pedestrian trip hazard. Be designed and constructed to comply with the Disability Discrimination Act (DDA), Access to Premises Standard, Austroads and relevant sections of AS1428 Design for access and mobility. Site Access and Driveways A driveway must be provided to the site in accordance with the approved plans and must comply in particular with the following: Be in accordance with IPWEAQ Standard Drawings SEQ R-049 and SEQ R050 To have a maximum width of 5.5 metre. To smoothly match the levels and grade (at 2.5%) of the proposed concrete footpath without posing trip hazards. Have a minimum clearance of 500mm from any Unitywater/Energex/Telstra asset, unless a written approval is obtained from Unitywater/Energex/Telstra and submitted to Council. Any existing service pits (eg Water Metre, Telstra pit) within the driveway crossover must be relocated or adjusted in accordance with the requirement the relevant service provider. Any stormwater kerb outlet in close proximity to the edge of the new driveway must be provided with an approved kerb adaptor The existing redundant property access and the full length of the redundant layback, and the kerb, footpath and verge area must be reinstated to match the existing kerb and verge treatments. The grassed verge areas to be reinstated must be provided with 100 mm topsoil and grass seed or turf, and must be maintained by the developer until established. Any damaged, irregular or substandard sections of kerb & channel must be replaced to the reasonable satisfaction of Council. Pavement design for privately owned works must be undertaken in accordance with the relevant standards. The structural integrity and the ongoing maintenance of the crossover, driveway and parking areas will remain the responsibility of the property owner. Earthworks The earthworks on the development site must be carried out in accordance with the instruction and the recommendations of the certifying RPEQ, the findings Acid Sulfate & Geotechnical Investigation report prepared by Tectonic Engineers (ref: 17265-001-Rev0 dated 25 August 2017) and must comply with the Queensland Acid Sulfate Soil Management Guideline 2014. All earthworks shall be undertaken in accordance with the provisions of AS 3798 Guidelines on Earthworks for Commercial and Residential Development. Certification must be provided by an RPEQ and submitted to Council prior to the issue of the Certificate of Classification for the building. Stormwater Works Stormwater drainage works must be provided generally in accordance with the approved engineering plans and must comply in particular with following requirements: The finished surface levels of the site must be graded and shaped to ensure that all surface runoff is collected and directed to the proposed drainage system and the street, drainage system and not directed on to any adjoining property or adversely impacting on the development site. Free-of-obstruction overland flow paths provided along the northern and southern boundaries of the developed site including any required stormwater structure (eg pipe, box culvert) to allow for stormwater passage during rare big storm events. Service Conduits under Existing Road Where applicable, any electrical conduits and other services (including town water connection) proposed to be installed under existing sealed roads, concrete pathways or concrete/sealed driveways must be installed by boring. Trenching is not permitted, unless specifically approved by Council. Erosion and Sediment Control Prescribed Water Contaminants (as defined in the Environmental Protection Act 1994) must not be released from the site or to waters within the site, or be likely to be released should rainfall occur, unless all reasonable and practicable measures are taken to prevent or minimise the release and concentration of contamination. Effective erosion and sediment control measures must be installed and maintained to minimise erosion on the site and to minimise the export of sediment and associated pollutants from the site. The erosion and sediment control measures must be designed, installed and maintained in accordance with current best practice standards and in accordance with the instructions and recommendations of the supervising engineer. The applicant must ensure non-essential exposure of soil is prevented by restricting the extent of works and minimising the duration of soil exposure to adverse weather conditions. Exposed areas must be effectively stabilised without delay prior to any predicted rainfall occurring and turfed as soon as practicable. Prior to the issue of the Certificate of Classification, all site surfaces must be effectively stabilised using methods which have achieved effective short-term stabilisation and which will continue to achieve effective stabilisation in the medium to long-term. For the purpose of this condition, an effectively stabilised surface is defined as one that does not, or is not likely to result in visible evidence of soil loss caused by sheet, rill or gully erosion or lead to sedimentation, or lead to water contamination. Supervision/Certification Upon completion of the work a certificate must be issued by an RPEQ certifying that the works have been constructed in accordance with the Operational Works permit and best engineering practices. All municipal works must be accepted ‘On Maintenance’ by Council in accordance with Council’s relevant Planning Scheme Policy prior to the commencement of the use. To achieve ‘On Maintenance’, the supervising RPEQ must submit to council: Certification that all works have been undertaken and completed in accordance with the requirements of this Permit. As Constructed details in accordance with Council’s Planning Scheme Policy As Constructed Plans Prior to acceptance of any civil works to become Council assets “On Maintenance”, the lodgment of a satisfactory “As Constructed” records must be submitted to Council. The “As Constructed” information must generally include: As-Constructed Engineering Drawings. Data is to be submitted in an electronic drawing file format (.dwg), with all plans clearly endorsed “As-Constructed”, along with the accompanying hardcopies (PDFs of the As-Constructed .dwg drawing files), and; Drawings and data certified by a qualified experienced Civil Engineer (RPEQ) for design intent, and certified by a Licensed Surveyor in regard to the cadastre and the location, level and type of all services and structures. The data must be in accordance with Council’s (Noosa Plan) – Planning Scheme Policy 5 – Engineering Design Standards – Roads, Drainage and Earthworks, and fully detail levels for all engineering works including but not limited to drainage structures, finished ground levels and pavement surface levels. 5. REFERRAL AGENCIES Not Applicable. 7. REFERENCED DOCUMENTS Not Applicable. 8. ADVISORY NOTES Aboriginal Cultural Heritage Act 2003 There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act). The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage. You should contact the Cultural Heritage Unit on 07 3247 6212 to discuss any obligations under the ACH Act. Development Compliance Inspection Prior to the commencement of the use, please contact Council's DA Planning Section to arrange a Development Compliance Inspection. Infrastructure Charges This Development Permit will trigger an “Infrastructure Charge Notice” to be issued in accordance with Council’s “Charges Resolution” made pursuant to the Sustainable Planning Act 2009 and in conjunction with the State Planning Regulatory Provision (Adopted Charges). Building and Construction Industry (Portable Long Service Leave) Levy The QLeave levy must be paid prior to the issue of a development permit where it is required by the applicable act/s and regulations. Council will not be able to issue a Decision Notice without receipt of details that the Levy has been paid. QLeave contact: 1800 803 481 (free call) or (07) 3212 6855. Private Infrastructure All private infrastructures for the development must be designed to meet the planning scheme requirements unless otherwise agreed by the relevant authority. General Advisory Notes Council has undertaken an audit check of the Operational Works drawings in relations to the proposed works. A detailed check of the calculations and drawings has not been undertaken, as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of the engineering design. Council reserves the right to require further amendments and/or additions at a later date should design errors become apparent. Council reserves the right to call up any performance bond held or levy charges against the property, should emergency works be required to be undertaken by Council to make the work site safe due to inactivity on the development site for extended periods of time. Should any changes or modifications to the approved plans be required as a result of construction constraints, a “Request to Change an Existing Approval” under the Sustainable Planning Act 2009 must be made. Amended plans clearly indicating the changes must be lodged with this application along with the appropriate fees. Prestart, On and Off Maintenance Inspections Request Contact Council on 5329 6291 to arrange a prestart or an inspection giving a minimum of 5 business days notice of preferred inspection time. It should be noted prior to arranging a prestart meeting the Right of Appeal Period of 20 business days should have been passed or the applicant has have confirmed by a letter or an email that he/she has accepted the conditions of Decision Notice and waived his/her appeal right. If Council officers are required to undertake additional inspections of the same works, a reinspection fee will be applicable in accordance with Council’s Fees and Charges register applicable at the time. A minimum maintenance period of 12 months will apply to all municipal works (eg public concrete pathway) and thereafter until such time as the works are performing in accordance with the approved design unless notifies otherwise. General Environmental Advisory Note The Environmental Protection Act 1994 states that a person must not carry out any activity that causes, or is likely to cause, environmental harm unless the person takes all reasonable and practicable measures to prevent or minimise the harm. Environmental harm includes environmental nuisance. In this regard persons and entities, involved in the civil, earthworks, construction and landscaping phases of this development are to adhere to their ‘general environmental duty’ to minimise the risk of causing environmental harm. 9. PROPERTY NOTES Not Applicable. 10. PRELIMINARY APPROVAL OVERRIDING PLANNING SCHEME Not Applicable. 11. FURTHER DEVELOPMENT PERMITS REQUIRED Development Permit for Building Work (All Building Works) 12. SELF ASSESSABLE CODES Not Applicable. 13. SUBMISSIONS Not Applicable. 14. REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME Not Applicable. 15. RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Sustainable Planning Act 2009 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice” may be given. Taking this step will defer your appeal period, which will commence again from the start the day after you receive a “negotiated decision notice” Yours faithfully Wilhelm Koschade Development Planner Enc: Infrastructure Charge Notice Approved Plans/Documents Appeal Rights cc Unitywater Appeal Rights SUSTAINABLE PLANNING ACT 2009 & SUSTAINABLE PLANNING REGULATION 2009 The following is an extract from the Sustainable Planning Act 2009 (Chapter 7). MATERIAL CHANGE OF USE, RECONFIGURING A LOT & OPERATIONAL WORKS Division 8 Appeals to court relating to development applications and approvals 461 Appeals by applicants (1) An applicant for a development application may appeal to the court against any of the following— (a) the refusal, or the refusal in part, of the development application; (b) any condition of a development approval, another matter stated in a development approval and the identification or inclusion of a code under section 242; (c) the decision to give a preliminary approval when a development permit was applied for; (d) the length of a period mentioned in section 341; (e) a deemed refusal of the development application. (2) An appeal under subsection (1)(a), (b), (c) or (d) must be started within 20 business days (the applicant’s appeal period) after— (a) if a decision notice or negotiated decision notice is given—the day the decision notice or negotiated decision notice is given to the applicant; or (b) otherwise—the day a decision notice was required to be given to the applicant. (3) An appeal under subsection (1)(e) may be started at any time after the last day a decision on the matter should have been made. 462 Appeals by submitters—general (1) A submitter for a development application may appeal to the court only against— (a) the part of the approval relating to the assessment manager’s decision about any part of the application requiring impact assessment under section 314; or (b) the part of the approval relating to the assessment manager’s decision under section 327. (2) To the extent an appeal may be made under subsection (1), the appeal may be against 1 or more of the following— (a) the giving of a development approval; (b) any provision of the approval including— (i) a condition of, or lack of condition for, the approval; or (ii) the length of a period mentioned in section 341 for the approval. (3) However, a submitter may not appeal if the submitter— (a) withdraws the submission before the application is decided; or (b) has given the assessment manager a notice under section 339(1)(b)(ii). (4) The appeal must be started within 20 business days (the submitter’s appeal period) after the decision notice or negotiated decision notice is given to the submitter. 463 Additional and extended appeal rights for submitters for particular development applications (1) This section applies to a development application to which chapter 9, part 7 applies. (2) A submitter of a properly made submission for the application may appeal to the court about a referral agency’s response made by a prescribed concurrence agency for the application. (3) However, the submitter may only appeal against a referral agency’s response to the extent it relates to— (a) if the prescribed concurrence agency is the chief executive (environment)—development for an aquacultural ERA; or (b) if the prescribed concurrence agency is the chief executive (fisheries)—development that is— (i) a material change of use of premises for aquaculture; or (ii) operational work that is the removal, damage or destruction of a marine plant. (4) Despite section 462(1), the submitter may appeal against the following matters for the application even if the matters relate to code assessment— (a) a decision about a matter mentioned in section 462(2) if it is a decision of the chief executive (fisheries); (b) a referral agency’s response mentioned in subsection (2). 464 Appeals by advice agency submitters (1) Subsection (2) applies if an advice agency, in its response for an application, told the assessment manager to treat the response as a properly made submission. (2) The advice agency may, within the limits of its jurisdiction, appeal to the court about— (a) any part of the approval relating to the assessment manager’s decision about any part of the application requiring impact assessment under section 314; or (b) any part of the approval relating to the assessment manager’s decision under section 327. (3) The appeal must be started within 20 business days after the day the decision notice or negotiated decision notice is given to the advice agency as a submitter. (4) However, if the advice agency has given the assessment manager a notice under section 339(1)(b)(ii), the advice agency may not appeal the decision. 465 Appeals about decisions relating to extensions for approvals (1) For a development approval given for a development application, a person to whom a notice is given under section 389, other than a notice for a decision under section 386(2), may appeal to the court against the decision in the notice. (2) The appeal must be started within 20 business days after the day the notice of the decision is given to the person. (3) Also, a person who has made a request under section 383 may appeal to the court against a deemed refusal of the request. (4) An appeal under subsection (3) may be started at any time after the last day the decision on the matter should have been made. 466 Appeals about decisions relating to permissible changes (1) For a development approval given for a development application, the following persons may appeal to the court against a decision on a request to make a permissible change to the approval— (a) if the responsible entity for making the change is the assessment manager for the application— (i) the person who made the request; or (ii) an entity that gave a notice under section 373 or a pre-request response notice about the request; (b) if the responsible entity for making the change is a concurrence agency for the application—the person who made the request. (2) The appeal must be started within 20 business days after the day the person is given notice of the decision on the request under section 376. (3) Also, a person who has made a request under section 369 may appeal to the court against a deemed refusal of the request. (4) An appeal under subsection (3) may be started at any time after the last day the decision on the matter should have been made. 467 Appeals about changing or cancelling conditions imposed by assessment manager or concurrence agency (1) A person to whom a notice under section 378(9)(b) giving a decision to change or cancel a condition of a development approval has been given may appeal to the court against the decision in the notice. (2) The appeal must be started within 20 business days after the day the notice of the decision is given to the person. [word/footer1.xml] Page 10 of 17 [word/footer2.xml] PO Box 141 P. (07) 5329 6500 [email protected] TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au Page 1 of 17 [word/header1.xml] MCU17/0076 [Attachment: image4.png (image text)] a mm NOOSA COUNCIL
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.