Original source · versioned page text
2019-10-28 Special Meeting Agenda - Item 1 - Attachment 4 - RAL18-0023 - Master Plan Stage 2
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnCHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2 2 This Plan (MP2) is the second stage of the master planning process for the Noosa Shire Business Centre and follows on from the Shire Business Centre Master Plan: Stage 1 - Concepts (MP1). This document together with MP1 comprises a Planning Study prepared as part of the supporting documentation for The Noosa Plan: Choosing Futures process. It is intended to support a planning scheme that is consistent with the requirements of the Integrated Planning Act. MP2 is also consistent with the master plan process nominated by the 1997 Strategic Plan. Project: Shire Business Centre Master Plan Project Type: Master Plan Stage 2 Report Author/s: Raul Weychardt plus material from MP1 prepared by Paul Summers Completion Date: April 2003 Status of Report: Final - Adopted by Council 10 April 2003 \\stratplan\psreview\Planning Scheme\Planning Studies\Shire Business Centre\Masterplan-FinalApr03.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.