2019-10-28 Special Meeting Agenda - Item 1 - Attachment 4 - RAL18-0023 - Master Plan Stage 2

of 32

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2                                                                22


4.3        KEY DEVELOPMENT CHARACTERISTICS BY SUB-PRECINCT & TRAFFIC TYPE
           For the purposes of this Master Plan, a range of land uses defined within the Schedule to the Planning Scheme,
           have been condensed to a nested series of definitions relating to the primary and secondary functions defined by
           MP2 Plan and Table 4.1.

           These are indicated in Table 4.2. Note that the land uses indicated in the final column are the principal definitions
           only. Other land uses that are not listed in Table 4.2 may occur, though these functions would not be dominant in
           the precincts in which they occur.

           The discussion in this Master Plan provides a guide to the use intentions associated with the defined precincts
           and the scale of development intended for each of the sub-precincts. Final outcomes will be determined by
           decisions on any relevant development application and by the new Planning Scheme.

           Table 4.3 defines the key development characteristics anticipated for the various sub-precincts and includes the
           following components:

                      Sub-Precinct: The sub-precinct number on MP2 Plan.
                      Primary Function: The primary function from Table 4.2.
                      Secondary Function: The secondary function from Table 4.2.
                      Objective: The objective for the particular sub-precinct.
                      Process Principles: Initial Integrated Development Assessment System processes under the Integrated
                      Planning Act for key forms of development (material changes of use and reconfiguration). Material
                      changes of use based on land uses indicated in Table 4.2 and reconfiguration only are considered. For
                      changes of use to functions not consistent with Table 4.2, the impact assessment process is to be
                      followed. Note that the provisions focus on the principles for each sub-precinct and more detail on the
                      exact process for all development will be a necessary consideration of any relevant development
                      application. It is possible that as part of the new planning scheme, the assessment levels of some forms of
                      preferred development (ie business uses) will be changed from impact assessment to code assessment.
                      Strategic Plan Provisions: The Strategic Plan provisions that have direct influence on issues associated
                      with the sub-precinct. There will be many other provisions of the Strategic Plan that apply, however these
                      will have generic application over the whole of the Shire Business Centre site.
                      Intent & Performance Standards: An intent statement or description for the particular sub-precinct,
                      followed by a series of performance standards. The performance standards are generally structured on the
                      basis of:
                      Development scale, using floor space, site cover and plot ratio techniques;
                            Connectivity in visual and pedestrian/bikeway terms;
                            Parking; [Car parking will be assessed against the provisions of the Planning Scheme]
                            Timing; and
                            Use relationships.




\\stratplan\psreview\Planning Scheme\Planning Studies\Shire Business Centre\Masterplan-FinalApr03.doc
Log in to download the original file

2019-10-28 Special Meeting Agenda - Item 1 - Attachment 4 - RAL18-0023 - Master Plan Stage 2(PDF, 745KB).pdf · 763 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.