2019-10-28 Special Meeting Agenda - Item 1 - Attachment 4 - RAL18-0023 - Master Plan Stage 2

of 32

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2                                                               8

2.3        CONSTRAINT MAPPING
           Preparation of MP1 drew from an extensive range of documents that accompanied an application lodged by
           Montbar Pty Ltd on 30/09/2000. In consultation with the then Department of Communication, Information, Local
           Government, Planning & Sport and other agencies, the review of the documents led to a request for further
           information. The information request had not been satisfied at the time the initial Master Plan was prepared.
           Montbar provided further information; however there was little additional constraint mapping that would assist in
           the development of this Master Plan.

           The constraint mapping for Stage 1 indicated that parts of the site intended for development were habitat for the
           elf skink, which is classified as a rare species under the Nature Conservation (Wildlife) Regulations. The skink is
           understood to be associated with the Eucalyptus grandis (Flooded Gum) unit of vegetation on the site. The extent
           and viability of the skink habitat over the site was not well understood at the time of preparation of MP1. However
           MP2 has benefited from additional studies carried out into the extent and viability of the elf skink on the site and
           the broader Noosa area. It is now also believed to inhabit the southern part of the site that is to be protected for
           environmental purposes. These additional studies have lead to a conclusion that -

                      ”There are grounds to reconsider the appropriateness of continuing to class E.graciloides (Elf Skink) as a
                      ‘rare’ species. This new work shows E.graciloides is more common and widespread than has been
                      inferred from museum records and one field study.”(Jeanette Covacevich, Senior Curator (vertebrates)
                      Queensland Museum, 6 March 2002).

           As a result of this study, the Elf Skink is no longer a significant constraint in terms of the master planning of the
           site. See Council’s Minutes dated 11 April 2002. Nevertheless the Elf Skink remains a fauna of significance as
           does the culturally significant species Koala which has been recorded at the site. Special measures are to be
           applied to operations that removes habitat of these species to relocate fauna present to a suitable alternative
           habitat.

           Drainage lines through the site were identified in MP1 as key definitional items providing edges to major
           functions. Therefore the location of the drainage lines has been refined by further field survey of the site and this
           additional field survey is a consideration of MP2.

           Council has named the road proposed in the Strategic Plan to connect Emu Mountain Road and Eenie Creek
           Road, as Walter Hay Drive. The alignment of this road across Eenie Creek and through the site has been refined
           following extensive engineering and environmental assessments. The plan with MP2 reflects a design
           recommended by Council’s traffic consultants and staff. However Council is yet to finally determine the route for
           Walter Hay Drive and it may vary slightly from the MP2 plan. The size of roundabouts drawn is indicative and will
           be the subject of more detailed assessment by Council.

           The major constraints influencing the preparation of the Master Plan are summarised in Table 2.3




\\stratplan\psreview\Planning Scheme\Planning Studies\Shire Business Centre\Masterplan-FinalApr03.doc
Log in to download the original file

2019-10-28 Special Meeting Agenda - Item 1 - Attachment 4 - RAL18-0023 - Master Plan Stage 2(PDF, 745KB).pdf · 763 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.